[Code of Federal Regulations]
[Title 18, Volume 1]
[Revised as of April 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 18CFR4.61]

[Page 118-120]
 
           TITLE 18--CONSERVATION OF POWER AND WATER RESOURCES
 
  CHAPTER I--FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY
 
PART 4_LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT 
COSTS--Table of Contents
 
  Subpart G_Application for License for Minor Water Power Projects and 
             Major Water Power Projects 5 Megawatts or Less
 
Sec. 4.61  Contents of application.

    (a) General instructions. (1) Entry upon land. No work may be 
started on any proposed project works until the applicant receives a 
signed license from the Commission. Acceptance of an application does 
not authorize entry upon public lands or reservations of the United 
States for any purpose. The applicant should determine whether any 
additional Federal, state, or local permits are required.
    (2) Exhibits F and G must be submitted on separate drawings. 
Drawings for Exhibits F and G must have identifying title blocks and 
bear the following certification: ``This drawing is a part of the 
application for license made by the undersigned this ------ day of ----
------, 19----.''
    (3) Each application for a license for a water power project 5 
megawatts or less must include the information requested in the initial 
statement and lettered exhibits described by paragraphs (b) through (f) 
of this section, and must be provided in the form specified. The 
Commission reserves the right to require additional information, or 
another filing procedure, if data provided indicate such action to be 
appropriate.
    (b) Initial statement.

             Before the Federal Energy Regulatory Commission

Application for License for a [Minor Water Power Project, or Major Water 
           Power Project, 5 Megawatts or Less, as Appropriate]

    (1) ---------- (Name of Applicant) applies to the Federal Energy 
Regulatory Commission for ---------- (license or new license, as 
appropriate) for the ---------- (name of project) water power project, 
as described hereinafter. (Specify any previous FERC project number 
designation.)
    (2) The location of the project is:
State or territory:_____________________________________________________
County:_________________________________________________________________
Township or nearby town:________________________________________________
Stream or other body of water:__________________________________________
    (3) The exact name, address, and telephone number of the applicant 
are:

________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
    (4) The exact name, address, and telephone number of each person 
authorized to act as agent for the applicant in this application, if 
applicable, are:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
    (5) The applicant is a ------ [citizen of the United States, 
association of citizens of the United States, domestic corporation, 
municipality, or State, as appropriate] and (is/is not) claiming 
perference under section 7(a) of the Federal Power Act. See 16 U.S.C. 
796.
    (6)(i) The statutory or regulatory requirements of the state(s) in 
which the project would be located that affect the project as proposed 
with respect to bed and banks and the appropriation, diversion, and use 
of water for power purposes, and with respect to the right to engage in 
the business of developing, transmitting, and distributing power and in 
any other business necessary to accomplish the purposes of the license 
under the Federal Power Act, are: [provide citation and brief 
identification of the nature of each requirement; if the applicant is a 
municipality, the applicant must submit copies of applicable state or 
local laws or a municipal charter or, if such laws or documents are not 
clear, any other appropriate legal authority, evidencing that the 
municipality is competent under such laws to engage in the business of 
developing, transmitting, utilizing, or distributing power.]
    (ii) The steps which the applicant has taken or plans to take to 
comply with each

[[Page 119]]

of the laws cited above are: [provide brief description for each 
requirement]
    (7) Brief project description
    (i) Proposed installed generating capacity ------ MW.
    (ii) Check appropriate box:
     existing dam [ballot] unconstructed dam [ballot]
     existing dam, major modified project (see Sec. 4.30(b)(14))
    (8) Lands of the United States affected (shown on Exhibit G):


                                                (Name)           (Acres)

(i) National Forest..................  ........................  .......
(ii) Indian Reservation..............  ........................  .......
(iii) Public Lands Under Jurisdiction  ........................  .......
 of.
(iv) Other...........................  ........................  .......
(v) Total U.S. Lands.................  ........................  .......
(vi) Check appropriate box:


 [ballot] Surveyed land [ballot] Unsurveyed land
    (9) Construction of the project is planned to start within ---- 
months, and is planned to be completed within ---- months, from the date 
of issuance of license.

    (c) Exhibit A is a description of the project and the proposed mode 
of operation.
    (1) The exhibit must include, in tabular form if possible, as 
appropriate:
    (i) The number of generating units, including auxiliary units, the 
capacity of each unit, and provisions, if any, for future units;
    (ii) The type of hydraulic turbine(s);
    (iii) A description of how the plant is to be operated, manual or 
automatic, and whether the plant is to be used for peaking;
    (iv) The estimated average annual generation in kilowatt-hours or 
mechanical energy equivalent;
    (v) The estimated average head on the plant;
    (vi) The reservoir surface area in acres and, if known, the net and 
gross storage capacity;
    (vii) The estimated minimum and maximum hydraulic capacity of the 
plant (flow through the plant) in cubic feet per second and estimated 
average flow of the stream or water body at the plant or point of 
diversion; for projects with installed capacity of more than 1.5 
megawatts, monthly flow duration curves and a description of the 
drainage area for the project site must be provided;
    (viii) Sizes, capacities, and construction materials, as 
appropriate, of pipelines, ditches, flumes, canals, intake facilities, 
powerhouses, dams, transmission lines, and other appurtenances; and
    (ix) The estimated cost of the project.
    (x) The estimated capital costs and estimated annual operation and 
maintenance expense of each proposed environmental measure.
    (2) State the purposes of project (for example, use of power 
output).
    (3) An estimate of the cost to develop the license application; and
    (4) The on-peak and off-peak values of project power, and the basis 
for estimating the values, for projects which are proposed to operate in 
a mode other than run-of-river.
    (5) The estimated average annual increase or decrease in project 
generation, and the estimated average annual increase or decrease of the 
value of project power due to a change in project operations (i.e., 
minimum bypass flows, limiting reservoir fluctuations) for an 
application for a new license;
    (6) The remaining undepreciated net investment, or book value of the 
project;
    (7) The annual operation and maintenance expenses, including 
insurance, and administrative and general costs;
    (8) A detailed single-line electrical diagram;
    (9) A statement of measures taken or planned to ensure safe 
management, operation, and maintenance of the project.
    (d) Exhibit E is an Environmental Report.
    (1) For major unconstructed and major modified projects 5 MW or 
less. Any application must contain an Exhibit E conforming with the data 
and consultation requirements of Sec. 4.41(f) of this chapter, if the 
application is for license for a water power project which has or is 
proposed to have a total installed generating capacity greater than 1.5 
MW but not greater than 5 MW, and which:
    (i) Would use the water power potential of a dam and impoundment 
which,

[[Page 120]]

at the time of application, has not been constructed (see Sec. 
4.30(b)(15)); or
    (ii) Involves any repair, modification or reconstruction of an 
existing dam that would result in a significant change in the normal 
maximum surface area or elevation of an existing impoundment or involves 
any change in existing project works or operations that would result in 
a significant environmental impact (see Sec. 4.30(b)(14)).
    (2) For minor projects and major projects at existing dams 5 MW or 
less. An application for license for either a minor water power project 
with a total proposed installed generating capacity of 1.5 MW or less or 
a major project--existing dam with a proposed total installed capacity 
of 5 MW or less must contain an Exhibit E under this subparagraph. See 
Sec. 4.38 for consultation requirements. The Environmental Report must 
contain the following information:
    (i) A description, including any maps or photographs which the 
applicant considers appropriate, of the environmental setting of the 
project, including vegetative cover, fish and wildlife resources, water 
quality and quantity, land and water uses, recreational uses, historical 
and archeological resources, and scenic and aesthetic resources. The 
report must include a discussion of endangered or threatened plant and 
animal species, any critical habitats, and any sites included in, or 
eligible for inclusion in, the National Register of Historic Places. The 
applicant may obtain assistance in the preparation of this information 
from state natural resources agencies, the state historic preservation 
officer, and from local offices of Federal natural resources agencies.
    (ii) A description of the expected environmental impacts from 
proposed construction or development and the proposed operation of the 
power project, including any impacts from any proposed changes in the 
capacity and mode of operation of the project if it is already 
generating electric power, and an explanation of the specific measures 
proposed by the applicant, the agencies, and others to protect and 
enhance environmental resources and values and to mitigate adverse 
impacts of the project on such resources. The applicant must explain its 
reasons for not undertaking any measures proposed by any agency 
consulted.
    (iii) A description of the steps taken by the applicant in 
consulting with Federal, state, and local agencies with expertise in 
environmental matters during the preparation of this exhibit prior to 
filing the application for license with the Commission. In this report, 
the applicant must:
    (A) Indicate which agencies were consulted during the preparation of 
the environmental report and provide copies of letters or other 
documentation showing that the applicant consulted or attempted to 
consult with each of the relevant agencies (specifying each agency) 
before filing the application, including any terms or conditions of 
license that those agencies have determined are appropriate to prevent 
loss of, or damage to, natural resources; and
    (B) List those agencies that were provided copies of the application 
as filed with the Commission, the date or dates provided, and copies of 
any letters that may be received from agencies commenting on the 
application.
    (iv) Any additional information the applicant considers important.
    (e) Exhibit F. See Sec. 4.41(g) of this chapter.
    (f) Exhibit G. See Sec. 4.41(h) of this chapter.

[Order 185, 46 FR 55949, Nov. 13, 1981, as amended by Order 413, 50 FR 
11685, Mar. 25, 1985; Order 464, 52 FR 5449, Feb. 23, 1987; Order 513, 
54 FR 23806, June 2, 1989; Order 2002, 68 FR 51120, Aug. 25, 2003; 68 FR 
61742, Oct. 30, 2003]