Sec. 4.71  Contents of application.

    An application for license for transmission line only must contain 
the following information in the form specified.
    (a) Initial statement.

             Before the Federal Energy Regulation Commission

           Application for License for Transmission Line Only

    (1) [Name of applicant] applies to the Federal Energy Regulatory 
Commission for a [license or new license, as appropriate] for the [name 
of project] transmission line only, as described in the attached 
exhibits, that is connected with FERC Project No. ------, for which a 
license [was issued, or application was made, as appropriate] on the --
---- day of ----------, 19----.
    (2) The location of the transmission line would be:
State or territory:_____________________________________________________
County:_________________________________________________________________
Township or nearby town:________________________________________________
    (3) The proposed use or market for the power to be transmitted.
    (4) The exact name, business address, and telephone number of the 
applicant are:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
    (5) The applicant is a [citizen of the United States, association of 
citizens of the United States, domestic corporation, municipality, or 
State, as appropriate] and (is/is not) claiming preference under section 
7(a) of the Federal Power Act. See 16 U.S.C. 796.
    (6)(i) [For any applicant which, at the time of application for 
license for transmission line only, is a non-licensee.] The statutory or 
regulatory requirements of the state(s) in which the project would be 
located and that affect the project as proposed with respect to bed and 
banks and to the appropriation, diversion, and use of water for power 
purposes, and with respect to the right to engage in the business of 
developing, transmitting, and distribution power and in any other 
business necessary to accomplish the purposes of the license under the 
Federal Power Act, are: [provide citation and brief identification of 
the nature of each requirement; if the applicant is a municipality, the 
applicant must submit copies of applicable state or local laws or a 
municipal charter or, if such laws or documents are not clear, other 
appropriate legal authority, evidencing that the municipality is 
competent under such laws to engage in the business of developing, 
transmitting, utilizing, or distributing power.]
    (ii) [For any applicant which, at the time of application for 
license for transmission line only, is a licensee.] The statutory or 
regulatory requirements of the state(s) in which the transmission line 
would be located and that affect the project as proposed with respect to 
bed and banks and to the appropriation, diversion, and use of water for 
power purposes, are: [provide citations and brief identification of the 
nature of each requirement.]
    (iii) The steps which the applicant has taken or plans to take to 
comply with each of the laws cited above are: [provide brief 
descriptions for each law.]

    (b) Required exhibits. The application must contain the following 
exhibits, as appropriate:
    (1) For any transmission line that, at the time the application is 
filed, is not constructed and is proposed to be connected to a licensed 
water power project with an installed generating capacity of more than 5 
MW--Exhibits A, B, C, D, E, F, and G under Sec. 4.41 of this chapter;
    (2) For any transmission line that, at the time the application is 
filed, is not constructed and is proposed to be connected to a licensed 
water power project with an installed generating capacity of 5 MW or 
less--Exhibits E, F, and G under Sec. 4.61 of this chapter; and
    (3) For any transmission line that, at the time the application is 
filed, has been constructed and is proposed to be connected to any 
licensed water power project--Exhibits E, F, and G under Sec. 4.61 of 
this chapter.

[Order 184, 46 FR 55942, Nov. 13, 1981, as amended by Order 413, 50 FR 
11685, Mar. 25, 1985]