                           TITLE 23--HIGHWAYS
 
 CHAPTER I--FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
 
PART 636_DESIGN-BUILD CONTRACTING--Table of Contents
 
             Subpart B_Selection Procedures, Award Criteria
 
Sec. 636.201  What selection procedures and award criteria may be used?


    You should consider using two-phase selection procedures for all 
design-build projects. However, if you do not believe two-phase 
selection procedures are appropriate for your project (based on the 
criteria in Sec. 636.202), you may use a single phase selection 
procedure or the modified-design-build contracting method. The following 
procedures are available:

------------------------------------------------------------------------
                                  Criteria for using
       Selection procedure            a selection       Award criteria
                                       procedure            options
------------------------------------------------------------------------
(a) Two-Phase Selection           Sec.  636.202....  Lowest price,
 Procedures (RFQ followed by                           Adjusted low-bid
 RFP).                                                 (price per
                                                       quality point),
                                                       meets criteria/
                                                       low bid, weighted
                                                       criteria process,
                                                       fixed price/best
                                                       design, best
                                                       value.
(b) Single Phase (RFP)..........  Project not         All of the award
                                   meeting the         criteria in item
                                   criteria in Sec.   (a) of this
                                    636.202.           table.
(c) Modified Design-Build (may    Any project.......  Lowest price
 be one or two phases).                                technically
                                                       acceptable.
------------------------------------------------------------------------