Sec. 921.12  Post site selection.

    (a) At the time of the coastal state's request for NOAA approval of 
a proposed site, the state may submit a request for funds to develop the 
draft management plan and for preparation of the EIS. At this time, the 
state may also submit a request for the remainder of the predesignation 
funds to perform a limited basic characterization of the physical, 
chemical and biological characteristics of the site approved by NOAA 
necessary for providing EIS information to NOAA. The state's request for 
these post site selection funds must be accompanied by the information 
specified in subpart I and, for draft management plan development and 
EIS information collection, the following programmatic information:
    (1) A draft management plan outline (see Sec. 921.13(a) below); and
    (2) An outline of a draft memorandum of understanding (MOU) between 
the state and NOAA detailing the Federal-state role in Reserve 
management during the initial period of Federal funding and expressing 
the

[[Page 100]]

state's long-term commitment to operate and manage the Reserve.
    (b) The state is eligible to use the funds referenced in Sec. 
921.12(a) after the proposed site is approved by NOAA under the terms of 
Sec. 921.11.