    (a) If a notice to proceed requirement has been included in the 
grant or permit, the holder shall not initiate construction, occupancy 
or use until the authorized officer issues a notice to proceed.
    (b) Any substantial deviation in location or authorized use by the 
holder during construction, operation or maintenance shall be made only 
with prior approval of the authorized officer under Sec. 2803.6-1 of 
this title for the purposes of this paragraph, substantial deviation 
means:

[[Page 250]]

    (1) With respect to location, the holder has constructed the 
authorized facility outside the prescribed boundaries of the right-of-
way authorized by the instant grant or permit.
    (2) With respect to use, the holder has changed or modified the 
authorized use by adding equipment, overhead or underground lines, 
pipelines, structures or other facilities not authorized in the instant 
grant or permit.
    (c) The holder shall notify the authorized officer of any change in 
status subsequent to the application or issuance of the right-of-way 
grant or temporary use permit. Such changes include, but are not limited 
to, legal mailing address, financial condition, business or corporate 
status. When requested by the authorized officer, the holder shall 
update and/or attest to the accuracy of any information previously 
submitted.
    (d) If required by the terms of the right-of-way grant or temporary 
use permit, the holder shall, subsequent to construction and prior to 
commencing operations, submit to the authorized officer a certification 
of construction, verifying that the facility has been constructed and 
tested in accordance with terms of the right-of-way grant or temporary 
use permit, and in compliance with any required plans and 
specifications, and applicable Federal and State laws and regulations.