                    TITLE 43--PUBLIC LANDS: INTERIOR
 
    CHAPTER II--BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
 
PART 3160_ONSHORE OIL AND GAS OPERATIONS--Table of Contents
 
   Subpart 3162_Requirements for Operating Rights Owners and Operators
 
Sec. 3162.2-9  What is my duty to inquire about the potential for drainage 
and inform BLM of my findings?

    (a) When you first acquire a lease interest, and at all times while 
you hold the lease interest, you must monitor the drilling of wells in 
the same or adjacent spacing units and gather sufficient information to 
determine whether drainage is occurring. This information can be in 
various forms, including but not limited to, well completion reports, 
sundry notices, or available production information. As a prudent 
lessee, it is your responsibility to analyze and evaluate this 
information and make the necessary calculations to determine:
    (1) The amount of drainage from production of the draining well;
    (2) The amount of mineral resources which will be drained from your 
Federal or Indian lease during the life of the draining well; and
    (3) Whether a protective well would be economic to drill.
    (b) You must notify BLM within 60 days from the date of actual or 
constructive notice of:
    (1) Which of the actions in Sec. 3162.2-4 you will take; or
    (2) The reasons a protective well would be uneconomic.
    (c) If you do not have sufficient information to comply with Sec. 
3162.2-9(b)(1), indicate when you will provide the information.
    (d) You must provide BLM with the analysis under paragraph (a) of 
this section within 60 days after we request it.

[66 FR 1893, Jan. 10, 2001]