[Code of Federal Regulations] [Title 46, Volume 1] [Revised as of Octobery 1, 2004] From the U.S. Government Printing Office via GPO Access [CITE: 46CFR32.50-5] [Page 423] TITLE 46--SHIPPING CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PART 32_SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS--Table of Contents Subpart 32.50_Pumps, Piping, and Hose for Cargo Handling Sec. 32.50-5 Cargo pump gauges on tank vessels constructed on or after November 10, 1936--TB/ALL. (a) [Reserved] (b) A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. [CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 73-254, 40 FR 40163, Sept. 2, 1975] [[Page 424]]