Sec. 50.20-15  Previously approved plans.

    (a) A manufacturer wishing to fabricate equipment in accordance with 
a plan previously approved (including work accomplished under a 
different contract) shall not be required to resubmit such plans 
provided:
    (1) Certification is submitted that the proposed equipment conforms 
in every respect to the plan previously approved, and such certification 
contains the drawing number, title, date, and last revision or change 
date, and date of previous approval;
    (2) The current regulations, including adopted specifications, 
standards or codes, pertaining to the proposed equipment are the same as 
those current when the original plan was approved; and
    (3) A copy of the approved plan is available for review by the 
approving office.