[Code of Federal Regulations] [Title 46, Volume 2] [Revised as of October 1, 2004] From the U.S. Government Printing Office via GPO Access [CITE: 46CFR54.01-18] [Page 145] TITLE 46--SHIPPING CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PART 54_PRESSURE VESSELS--Table of Contents Subpart 54.01_General Requirements Sec. 54.01-18 Plan approval. (a) Manufacturers intending to fabricate pressure vessels, heat exchangers, evaporators, and similar appurtenances, covered by the regulations in this part shall submit detailed plans in accordance with subpart 50.20 of this subchapter. (b) The following information shall be submitted: (1) Calculations for all pressure containment components including the maximum allowable working pressure, the hydrostatic or pneumatic test pressure, and the intended safety device setting. (2) Joint design and methods of attachment of all pressure containment components. (3) Foundations and supports (design and attachment). (4) Pertinent calculations for pressure vessel foundations and/or supports. (5) A bill of material meeting the requirements of section VIII of the ASME Code, as modified by this part. (6) A diagrammatic arrangement drawing of the assembled unit indicating location of internal and external components.