[Code of Federal Regulations] [Title 46, Volume 2] [Revised as of October 1, 2004] From the U.S. Government Printing Office via GPO Access [CITE: 46CFR64.1] [Page 317] TITLE 46--SHIPPING CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PART 64_MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS--Table of Contents Subpart A_General Sec. 64.1 Purpose. Subpart A_General Sec. 64.1 Purpose. 64.2 Incorporation by reference. 64.3 Applicability. 64.5 Definitions. 64.9 Maintenance, repair, and alteration of MPTs. Subpart B_Standards for an MPT 64.11 Design of MPTs. 64.13 Allowable stress; tank. 64.15 Allowable stress; framework. 64.17 Minimum tank thickness. 64.19 External pressure. 64.21 Material. 64.23 Gasket and lining. 64.25 Cross section. 64.27 Base. 64.29 Tank saddles. 64.31 Inspection opening. 64.33 Pipe connection. 64.35 Bottom filling or discharge connection. 64.37 Valve and fitting guard. 64.39 Valve securing device. 64.41 Stop valve closure. 64.43 Lifting fittings. 64.45 Securing devices. 64.47 Type of relief devices. 64.49 Labeling openings. 64.51 Tank parts marking. 64.53 Information plate for MPTs. 64.55 Relief device location. Subpart C_Pressure Relief Devices and Vacuum Relief Devices for MPTs 64.57 Acceptance of pressure relief devices. 64.59 Spring loaded pressure relief valve. 64.61 Rupture disc. 64.63 Minimum emergency venting capacity. 64.65 Vacuum relief device. 64.67 Shutoff valve. 64.69 Location of the pressure relief device. 64.71 Marking of pressure relief devices. Subpart D [Reserved] Subpart E_Periodic Inspections and Tests of MPTs 64.77 Inspection and test. 64.79 Inspection of pressure and vacuum relief device. 64.81 30-month inspection of an MPT. 64.83 Hydrostatic test. Subpart F_Cargo Handling System 64.87 Purpose. 64.88 Plan approval, construction, and inspection of cargo-handling systems. 64.89 Cargo pump unit. 64.91 Relief valve for the cargo pump discharge. 64.93 Pump controls. 64.95 Piping. 64.97 Cargo hose. Authority: 46 U.S.C. 3306, 3703; 49 U.S.C. App. 1804; Department of Homeland Security Delegation No. 0170.1. Source: CGD 73-172, 39 FR 22950, June 25, 1974, unless otherwise noted. This part contains the requirements for-- (a) Design, construction, repair, alteration, and marking of marine portable tanks (MPTs) authorized by this chapter to be carried on inspected vessels; (b) Periodic inspections and tests of MPTs; and (c) Design and construction of cargo-handling systems for MPTs and other portable tanks authorized under subparts 98.30 and 98.33 of this chapter. [CGD 84-043, 55 FR 37409, Sept. 11, 1990; 55 FR 47477, Nov. 14, 1990]