                        TITLE 49--TRANSPORTATION
 
 CHAPTER I--RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION, DEPARTMENT OF 
                       TRANSPORTATION (CONTINUED)
 
PART 192_TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM 
FEDERAL SAFETY STANDARDS--Table of Contents
 
                 Subpart D_Design of Pipeline Components
 
Sec. 192.150  Passage of internal inspection devices.

    (a) Except as provided in paragraphs (b) and (c) of this section, 
each new transmission line and each replacement of line pipe, valve, 
fitting, or other line component in a transmission line must be designed 
and constructed to accommodate the passage of instrumented internal 
inspection devices.
    (b) This section does not apply to: (1) Manifolds;
    (2) Station piping such as at compressor stations, meter stations, 
or regulator stations;
    (3) Piping associated with storage facilities, other than a 
continuous run of transmission line between a compressor station and 
storage facilities;
    (4) Cross-overs;
    (5) Sizes of pipe for which an instrumented internal inspection 
device is not commercially available;
    (6) Transmission lines, operated in conjunction with a distribution 
system which are installed in Class 4 locations;
    (7) Offshore transmission lines, except transmission lines 10\3/4\ 
inches (273 millimeters) or more in outside diameter on which 
construction begins after December 28, 2005, that run from platform to 
platform or platform to shore unless--
    (i) Platform space or configuration is incompatible with launching 
or retrieving instrumented internal inspection devices; or
    (ii) If the design includes taps for lateral connections, the 
operator can demonstrate, based on investigation or experience, that 
there is no reasonably practical alternative under the design 
circumstances to the use of a tap that will obstruct the passage of 
instrumented internal inspection devices; and
    (8) Other piping that, under Sec. 190.9 of this chapter, the 
Administrator finds in a particular case would be impracticable to 
design and construct to accommodate the passage of instrumented internal 
inspection devices.
    (c) An operator encountering emergencies, construction time 
constraints or other unforeseen construction problems need not construct 
a new or replacement segment of a transmission line to meet paragraph 
(a) of this section, if the operator determines and documents why an 
impracticability prohibits compliance with paragraph (a) of this 
section. Within 30 days after discovering the emergency or construction 
problem the operator must petition, under Sec. 190.9 of this chapter, 
for approval that design and construction to accommodate passage of 
instrumented internal inspection devices would be impracticable. If the 
petition is denied, within 1 year after the date of the notice of the 
denial, the operator must modify that segment to allow passage of 
instrumented internal inspection devices.

[Amdt. 192-72, 59 FR 17281, Apr. 12, 1994, as amended by Amdt. 192-85, 
63 FR 37502, July 13, 1998; Amdt. 192-97, 69 FR 36029, June 28, 2004]