Sec. 235.7  Changes not requiring filing of application.

    (a) It is not necessary to file an application for approval of the 
following discontinuances:
    (1) Removal of block signal system, interlocking, traffic control 
system, automatic train stop, train control, or cab signal system from 
track approved for abandonment by formal proceeding;
    (2) Removal of devices and associated signals used to provide 
protection against unusual contingencies such as landslide, burned 
bridge, high water, high and wide load, or tunnel protection when the 
unusual contingency no longer exists;
    (3) Removal of an interlocking where a drawbridge has been 
permanently closed by the formal approval of another government agency; 
or
    (4) Removal from service not to exceed six months of block signal 
system, interlocking, or traffic control system necessitated by 
catastrophic occurrence such as derailment, flood, fire, or hurricane.
    (b) When the resultant arrangement will comply with part 236 of this 
title, it is not necessary to file for approval to decrease the limits 
of a system as follows:
    (1) Decrease of the limits of an interlocking when interlocked 
switches, derails, or movable-point frogs are not involved;
    (2) Removal of electric or mechanical lock from hand-operated switch 
in automatic block signal or traffic control territory where train speed 
over switch does not excess 20 miles per hour; or
    (3) Removal of electric or mechanical lock from hand-operated switch 
in automatic block signal or traffic control territory where trains are 
not permitted to clear the main track at such switch.
    (c) When the resultant arrangement will comply with part 236 of this 
title, it is not necessary to file an application for approval of the 
following modifications:
    (1) A modification that is required to comply with an order of the 
Federal Railroad Administration or any section of part 236 of this 
title;
    (2) The installation of an automatic block signal or a traffic 
control system to replace manual block or non-signaled territory;
    (3) The installation of a traffic control system to replace a 
roadway automatic block signal system (discontinuance of an automatic 
train stop, train control, or cab signal system is not permitted without 
FRA approval);
    (4) The installation of an automatic train stop, train control, or 
cab signal system in an existing automatic block or traffic control 
system;
    (5) The installation of a continuous inductive automatic train stop 
system to replace an existing intermittent inductive automatic train 
stop system;
    (6) The installation of a continuous inductive automatic train stop 
system to supplement an existing automatic cab signal system;
    (7) The installation of an automatic train control system to replace 
an existing automatic train stop system or to supplement an existing 
automatic cab signal system;
    (8) The installation of an interlocking to replace existing stop 
signs, gates, or pipe-connected derails protecting a railroad crossing 
at grade;
    (9) The installation of all relay type locking to replace existing 
mechanical or electromechanical locking of an interlocking;
    (10) The installation of an additional controlled point in existing 
traffic control system;
    (11) The installation of an interlocking in an existing block signal 
system;
    (12) The conversion of a hand-operated switch, a hand-operated 
switch locked either electrically or mechanically, or a spring switch to 
a power-operated switch;
    (13) The conversion of a spring switch to a hand-operated switch, or 
to a hand-operated switch locked either electrically or mechanically;
    (14) The removal or relocation of signals associated with a spring 
switch converted to hand operation;
    (15) The installation, relocation, or removal of signals to 
specifically provide adequate stopping distance;
    (16) The change of aspects;
    (17) The relocation of a signal to improve preview of signal aspect 
visibility;

[[Page 536]]

    (18) To replace a signal with a signal of another type;
    (19) To change an approach signal to operative or inoperative 
signal, or remove an approach signal not required by Sec. 236.310 of 
this title;
    (20) The change in location of a machine from which an interlocking 
or traffic control system is controlled;
    (21) The closing of a manual block station or the change in hours 
during which a manual block station is attended;
    (22) The change in hours during which a manual interlocking is 
attended provided the interlocking operates for all routes over which 
train movements are permitted;
    (23) The installation of devices used to provide protection against 
unusual contingencies such as landslide, burned bridges, high water, 
high and wide loads, or dragging equipment;
    (24) The installation, relocation, or removal of signals, 
interlocked switches, derails, movable-point frogs, or electric locks in 
an existing system directly associated with:
    (i) The installation of new track;
    (ii) The elimination of existing track other than a second main 
track;
    (iii) The extension or shortening of a passing siding;
    (iv) Elimination of second main track where signal system mn 
retained main track is arranged to provide both opposing and following 
protection for train movements provided second main track is physically 
removed; or
    (v) A line relocation; or
    (vi) The conversion of pole line circuits to electronic (coded) 
track circuits provided that the railroad gives notice and a profile 
plan of the change to the FRA regional office having jurisdiction over 
that territory at least 60 days in advance of the change. The railroad 
must also at the same time provide a copy of the notice and profile plan 
to representatives of employees responsible for maintenance, inspection 
and testing of the signal system under 49 CFR Part 236. The signal 
system modification will be deemed acceptable, unless within 60 days, 
the Regional Adminstrator stays action by written notice to the railroad 
and refers the issue to the Railroad Safety Board for decision.
    (25) The temporary or permanent arrangement of existing systems 
necessitated by highway rail separation construction. Temporary 
arrangements shall be removed within six months following completion of 
construction.

[49 FR 3380, Jan. 26, 1984, as amended at 61 FR 33873, July 1, 1996]