[Code of Federal Regulations]
[Title 49, Volume 4]
[Revised as of October 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 49CFR268.11]

[Page 784-785]
 
                        TITLE 49--TRANSPORTATION
 
       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 
                             TRANSPORTATION
 
PART 268_MAGNETIC LEVITATION TRANSPORTATION TECHNOLOGY DEPLOYMENT PROGRAM
--Table of Contents
 
              Subpart B_Procedures For Financial Assistance
 
Sec. 268.11  Project eligibility standards.

    (a) Project eligibility standards for preconstruction planning 
financing. (1) As required by 23 U.S.C. 322(d)(4), in order to be 
eligible to receive financial assistance, a Maglev project shall:
    (i) Involve a segment or segments of a high-speed ground 
transportation corridor that exhibit Partnership Potential;
    (ii) Require an amount of Federal funds for project financing that 
will not exceed the sum of Federal Maglev Funds, and the amounts made 
available by States under STP and CMAQ;
    (iii) Result in an operating transportation facility that provides a 
revenue producing service;
    (iv) Be undertaken through a public and private partnership, with at 
least \1/3\ of Full Project Costs paid using non-Federal funds;
    (v) Satisfy applicable statewide and metropolitan planning 
requirements;
    (vi) Be approved by FRA based on an application submitted by a State 
or authority designated by one or more States;
    (vii) To the extent that non-United States Maglev technology is used 
within the United States, be carried out as a technology transfer 
project; and
    (viii) Be carried out using materials at least 70 percent of which 
are manufactured in the United States.
    (2) FRA recognizes that applicants for preconstruction planning 
grants will not have detailed information with respect to some of the 
requirements of paragraph (a)(1) of this section, and that the purpose 
of a preconstruction planning grant is to develop much of this 
information with respect to a particular Maglev project. As required by 
Sec. 268.15, an applicant will need to provide whatever information it 
has with respect to each of the requirements of paragraph (a)(1) of this 
section, together with a certification that the applicant fully intends 
to comply with the requirements of this paragraph (a) should its project 
be selected by FRA for final design, engineering and construction 
financing.
    (b) Project eligibility standards for final design, engineering, and 
construction financing. FRA will select the most promising Maglev 
project for final design, engineering, and construction financing. To be 
eligible to be considered, the project must meet each of the following 
requirements; these requirements restate the requirements in paragraph 
(a)(1) of this section, but with more detail and in a different order:
    (1) Purpose and significance of the project. (i) The project 
description shall point to a Maglev facility and daily operation the 
primary purpose of which is the conduct of a revenue-producing passenger 
transportation service between distinct points, rather than a service 
solely for the passengers' riding pleasure.
    (ii) The project description shall incorporate scheduled operation 
at a top speed of not less than 240 mph.
    (2) Benefits for the American economy. The project description shall 
include a certification as to paragraphs (b)(2) (i) and (ii) of this 
section and, as appropriate, a technology acquisition/transfer plan 
which describes the strategy for their accomplishment.
    (i) Processes will be established that will enable an American-owned 
and -sited firm (or firms) to gain, in the course of the project, the 
capability to participate in the design, manufacture, and installation 
of the facilities and vehicles needed for a Maglev operation, if the 
owner of the selected version of Maglev technology is not an American-
owned and -sited firm (thus meeting the technology transfer requirement 
of 23 U.S.C. 322).
    (ii) The 70 percent U.S. content requirement content of 23 U.S.C. 
322 will be carried out.
    (3) Partnership potential. The project shall exhibit Partnership 
potential by satisfying the following:
    (i) A private/public partnership must be in place that is ready, 
willing, and able to finance, construct, operate, and maintain the 
project;

[[Page 785]]

    (ii) The private/public partnership either owns the version of 
Maglev technology proposed to be implemented in the project, or has an 
agreement with the owner which affords full cooperation to the 
partnership in progressing the project, including implementation of the 
technology acquisition/transfer plan if applicable; and
    (iii) The recipient of a preconstruction planning grant or the FRA 
has developed and endorsed a projection of system capital costs, demand, 
revenues, operating expenses, and total costs and benefits, that:
    (A) Covers either the entire corridor in which the Maglev project is 
involved (``Corridor''), or the project considered independently;
    (B) Demonstrates that private enterprise would be able to run the 
Corridor or the project--once built and paid for--as a completely self-
sustaining entity, in which revenues will cover operating expenses and 
continuing investment needs; and
    (C) Shows total benefits equal to or exceeding total costs.
    (4) Funding Limits and Sources. The project description shall 
include a financing plan that demonstrates project completion with the 
$950 million in Federal Maglev Funds, funds remaining unobligated from 
the $55 million in contract authority, and the funds made available 
under STP and CMAQ. The project that is selected will be eligible for 
other forms of financial assistance provided under title 23 and TEA 21, 
including loans, loan guarantees, and lines of credit. However, at least 
\1/3\ of Full Project Costs must come from non-Federal Funds.
    (5) Project Management. The State, the technology owner, and all 
other relevant project partners must include in the project description, 
an agreed upon--
    (i) Management plan that defines the partnership, responsibilities, 
and procedures for accomplishing the project;
    (ii) Project schedule that shows how timely implementation of the 
project will be accomplished, including, to the extent possible, a 
construction plan and schedule; and
    (iii) Financial plan that shows how funds will flow, in accordance 
with the other requirements of this subsection.
    (6) Planning/environmental process.
    (i) Assessment of environmental consequences of the proposed 
project. Recipients of preconstruction planning grants shall conduct an 
EA in support of the project description; and will prepare additional 
environmental studies for the project. The EA shall include information 
to support the grantee's decision to pursue the proposed project. The 
grantee shall develop the information and discuss the environmental 
consequences of the proposed technology and route in sufficient detail 
for the preparation of appropriate documentation by FRA to support 
selection of one project. This shall include: the identification of 
potential positive and negative environmental effects resulting from the 
technology (e.g. energy consumption compared to other transportation 
options); generic noise emissions at various distances from the 
centerline of the guideway; changes in electromagnetic field levels at 
various distances from the centerline of the guideway; and environmental 
screening of the proposed route (e.g., identification of land use; 
identification of endangered species possibly present and location of 
their critical habitat; identification of navigable waterways, wetlands 
and other sensitive water resources; and identification of the location 
of parks, wildlife refuges, historic and archaeological sites of 
National, State or local significance and other sites protected by 
section 4(f) of the Department of Transportation Act). The latter 
information and analysis shall be submitted four months in advance of 
the remainder of the project description. The above list is illustrative 
only. Grantees will be expected to review proposed work statements with 
FRA at pre-application meetings or through some other means to develop 
the final scope of this environmental review.
    (ii) The project description must also include letters of 
endorsement of project implementation from all the State departments of 
transportation involved, and from all Metropolitan Planning 
Organizations for metropolitan areas that would be served by the 
project.

[[Page 786]]