    (a) Proposal cover page. (1) Form CSREES-712, ``Higher Education 
Proposal Cover Page,'' must be completed in its entirety. Note that 
providing a Social Security Number is voluntary, but is an integral part 
of the CSREES information system and will assist in the processing of 
the proposal.
    (2) One copy of the Form CSREES-712 must contain the pen-and-ink 
signatures of the project director(s) and authorized organizational 
representative for the applicant institution.
    (3) The title of the teaching project shown on the ``Higher 
Education Proposal Cover Page'' must be brief (80-character maximum) yet 
represent the major thrust of the project. This information will be used 
by the Department to provide information to the Congress and other 
interested parties.
    (4) In block 7. of Form CSREES-712, enter ``1890 Institution 
Capacity Building Grants Program.''
    (5) In block 8.a. of Form CSREES-712, enter ``Teaching.'' In block 
8.b. identify the code for the targeted need area(s) as found on the 
reverse of the form. If a proposal focuses on multiple targeted need 
areas, enter each code associated with the project. In block 8.c. 
identify the major area(s) of emphasis as found on the reverse of the 
form. If a proposal focuses on multiple areas of emphasis, enter each 
code associated with the project; however, limit the selection to three 
areas. This information will be used by program staff for the proper 
assignment of proposals to reviewers.

[[Page 365]]

    (6) In block 9. of Form CSREES-712, indicate if the proposal is a 
complementary project proposal or a joint project proposal as defined in 
Sec. 3406.2 of this part. If it is not a complementary project proposal 
or a joint project proposal, identify it as a regular project proposal.
    (7) In block 13. of Form CSREES-712, indicate if the proposal is a 
new, first-time submission or if the proposal is a resubmission of a 
proposal that has been submitted to, but not funded under, the 1890 
Institution Capacity Building Grants Program in a previous competition.
    (b) Table of contents. For ease in locating information, each 
proposal must contain a detailed table of contents just after the 
Proposal Cover Page. The Table of Contents should include page numbers 
for each component of the proposal. Pagination should begin immediately 
following the summary documentation of USDA agency cooperation.
    (c) USDA agency cooperator. To be considered for funding, each 
proposal must include documentation of cooperation with at least one 
USDA agency or office. If multiple agencies are involved as cooperators, 
documentation must be included from each agency. When documenting 
cooperative arrangements, the following guidelines should be used:
    (1) A summary of the cooperative arrangements must immediately 
follow the Table of Contents. This summary should:
    (i) Bear the signatures of the Agency Head (or his/her designated 
authorized representative) and the university project director;
    (ii) Indicate the agency's willingness to commit support for the 
project;
    (iii) Identify the person(s) at the USDA agency who will serve as 
the liaison or technical contact for the project;
    (iv) Describe the degree and nature of the USDA agency's involvement 
in the proposed project, as outlined in Sec. 3406.6(a) of this part, 
including its role in:
    (A) Identifying the need for the project;
    (B) Developing a conceptual approach;
    (C) Assisting with project design;
    (D) Identifying and securing needed agency or other resources (e.g., 
personnel, grants/contracts; in-kind support, etc.);
    (E) Developing the project budget;
    (F) Promoting partnerships with other institutions to carry out the 
project;
    (G) Helping the institution launch and manage the project;
    (H) Providing technical assistance and expertise;
    (I) Providing consultation through site visits, E-mail, conference 
calls, and faxes;
    (J) Participating in project evaluation and dissemination of final 
project results; and
    (K) Seeking other innovative ways to ensure the success of the 
project and advance the needs of the institution or the agency; and
    (v) Describe the expected benefits of the partnership venture for 
the USDA agency and for the 1890 Institution.
    (2) A detailed discussion of these partnership arrangements should 
be provided in the narrative portion of the proposal, as outlined in 
paragraph (f)(2)(iv)(C) of this section.
    (3) Additional documentation, including letters of support or 
cooperation, may be provided in the Appendix.
    (d) Project summary. (1) A Project Summary should immediately follow 
the summary documentation of USDA agency cooperation section. The 
information provided in the Project Summary will be used by the program 
staff for a variety of purposes, including the proper assignment of 
proposals to reviewers and providing information to reviewers prior to 
the peer panel meeting. The name of the institution, the targeted need 
area(s), and the title of the proposal must be identified exactly as 
shown on the ``Higher Education Proposal Cover Page.''
    (2) If the proposal is a complementary project proposal, as defined 
in Sec. 3406.2 of this part, indicate such and identify the other 
complementary project(s) by citing the name of the submitting 
institution, the title of the project, the project director, and the 
grant number (if funded in a previous year) exactly as shown on the 
cover page of the complementary project so

[[Page 366]]

that appropriate consideration can be given to the interrelatedness of 
the proposals in the evaluation process.
    (3) If the proposal is a joint project proposal, as defined in Sec. 
3406.2 of this part, indicate such and identify the other participating 
institutions and the key faculty member or other individual responsible 
for coordinating the project at each institution.
    (4) The Project Summary should be a concise description of the 
proposed activity suitable for publication by the Department to inform 
the general public about awards under the program. The text must not 
exceed one page, single-spaced. The Project Summary should be a self-
contained description of the activity which would result if the proposal 
is funded by USDA. It should include: The objectives of the project; a 
synopsis of the plan of operation; a statement of how the project will 
enhance the teaching capacity of the institution; a description of how 
the project will strengthen higher education in the food and 
agricultural sciences in the United States; a description of the 
partnership efforts between, and the expected benefits for, the USDA 
agency cooperator(s) and the 1890 Institution; and the plans for 
disseminating project results. The Project Summary should be written so 
that a technically literate reader can evaluate the use of Federal funds 
in support of the project.
    (e) Resubmission of a proposal--(1) Resubmission of previously 
unfunded proposals. (i) If a proposal has been submitted previously, but 
was not funded, such should be indicated in block 13. on Form CSREES-
712, ``Higher Education Proposal Cover Page,'' and the following 
information should be included in the proposal:
    (A) The fiscal year(s) in which the proposal was submitted 
previously;
    (B) A summary of the peer reviewers' comments; and
    (C) How these comments have been addressed in the current proposal, 
including the page numbers in the current proposal where the peer 
reviewers' comments have been addressed.
    (ii) This information may be provided as a section of the proposal 
following the Project Summary and preceding the proposal narrative or it 
may be placed in the Appendix (see paragraph (j) of this section). In 
either case, the location of this information should be indicated in the 
Table of Contents, and the fact that the proposal is a resubmitted 
proposal should be stated in the proposal narrative. Further, when 
possible, the information should be presented in tabular format. 
Applicants who choose to resubmit proposals that were previously 
submitted, but not funded, should note that resubmitted proposals must 
compete equally with newly submitted proposals. Submitting a proposal 
that has been revised based on a previous peer review panel's critique 
of the proposal does not guarantee the success of the resubmitted 
proposal.
    (2) Resubmission of previously funded proposals. Recognizing that 
capacity building is a long-term ongoing process, the 1890 Institution 
Capacity Building Grants Program is interested in funding subsequent 
phases of previously funded projects in order to build institutional 
capacity, and institutions are encouraged to build on a theme over 
several grant awards. However, proposals that are sequential 
continuations or new stages of previously funded Capacity Building 
Grants must compete with first-time proposals. Therefore, project 
directors should thoroughly demonstrate how the project proposed in the 
current application expands substantially upon a previously funded 
project (i.e., demonstrate how the new project will advance the former 
project to the next level of attainment or will achieve expanded goals). 
The proposal must also show the degree to which the new phase promotes 
innovativeness and creativity beyond the scope of the previously funded 
project. Please note that the 1890 Institution Capacity Building Grants 
Program is not designed to support activities that are essentially 
repetitive in nature over multiple grant awards. Project directors who 
have had their projects funded previously are discouraged from 
resubmitting relatively identical proposals for further funding.
    (f) Narrative of a teaching proposal. The narrative portion of the 
proposal is limited to 20 pages in length. The one-page Project Summary 
is not included

[[Page 367]]

in the 20-page limitation. The narrative must be typed on one side of 
the page only, using a font no smaller than 12 point, and double-spaced. 
All margins must be at least one inch. All pages following the summary 
documentation of USDA agency cooperation must be paginated. It should be 
noted that peer reviewers will not be required to read beyond 20 pages 
of the narrative to evaluate the proposal. The narrative should contain 
the following sections:
    (1) Potential for advancing the quality of education--(i) Impact. 
(A) Identify the targeted need area(s).
    (B) Clearly state the specific instructional problem or opportunity 
to be addressed.
    (C) Describe how and by whom the focus and scope of the project were 
determined. Summarize the body of knowledge which substantiates the need 
for the proposed project.
    (D) Describe ongoing or recently completed significant activities 
related to the proposed project for which previous funding was received 
under this program.
    (E) Discuss how the project will be of value at the State, regional, 
national, or international level(s).
    (F) Discuss how the benefits to be derived from the project will 
transcend the proposing institution or the grant period. Also discuss 
the probabilities of its adaptation by other institutions. For example, 
can the project serve as a model for others?
    (ii) Continuation plans. Discuss the likelihood of, or plans for, 
continuation or expansion of the project beyond USDA support. For 
example, does the institution's long-range budget or academic plan 
provide for the realistic continuation or expansion of the initiative 
undertaken by this project after the end of the grant period, are plans 
for eventual self-support built into the project, are plans being made 
to institutionalize the program if it meets with success, and are there 
indications of other continuing non-Federal support?
    (iii) Innovation. Describe the degree to which the proposal reflects 
an innovative or non-traditional approach to solving a higher education 
problem or strengthening the quality of higher education in the food and 
agricultural sciences.
    (iv) Products and results. Explain the kinds of results and products 
expected and their impact on strengthening food and agricultural 
sciences higher education in the United States, including attracting 
academically outstanding students and increasing the ethnic, racial, and 
gender diversity of the Nation's food and agricultural scientific and 
professional expertise base.
    (2) Overall approach and cooperative linkages--(i) Proposed 
approach--(A) Objectives. Cite and discuss the specific objectives to be 
accomplished under the project.
    (B) Plan of operation. (1) Describe procedures for accomplishing the 
objectives of the project.
    (2) Describe plans for management of the project to enhance its 
proper and efficient administration.
    (3) Describe the way in which resources and personnel will be used 
to conduct the project.
    (C) Timetable. Provide a timetable for conducting the project. 
Identify all important project milestones and dates as they relate to 
project start-up, execution, dissemination, evaluation, and close-out.
    (ii) Evaluation plans. (A) Provide a plan for evaluating the 
accomplishment of stated objectives during the conduct of the project. 
Indicate the criteria, and corresponding weight of each, to be used in 
the evaluation process, describe any data to be collected and analyzed, 
and explain the methodology that will be used to determine the extent to 
which the needs underlying the project are met.
    (B) Provide a plan for evaluating the effectiveness of the end 
results upon conclusion of the project. Include the same kinds of 
information requested in paragraph (f) (2)(ii)(A) of this section.
    (iii) Dissemination plans. Discuss plans to disseminate project 
results and products. Identify target audiences and explain methods of 
communication.
    (iv) Partnerships and collaborative efforts. (A) Explain how the 
project will maximize partnership ventures and collaborative efforts to 
strengthen food and agricultural sciences higher education (e.g., 
involvement of faculty in

[[Page 368]]

related disciplines at the same institution, joint projects with other 
colleges or universities, or cooperative activities with business or 
industry). Also explain how it will stimulate academia, the States, or 
the private sector to join with the Federal partner in enhancing food 
and agricultural sciences higher education.
    (B) Provide evidence, via letters from the parties involved, that 
arrangements necessary for collaborative partnerships or joint 
initiatives have been discussed and realistically can be expected to 
come to fruition, or actually have been finalized contingent on an award 
under this program. Letters must be signed by an official who has the 
authority to commit the resources of the organization. Such letters 
should be referenced in the plan of operation, but the actual letters 
should be included in the Appendix section of the proposal. Any 
potential conflict(s) of interest that might result from the proposed 
collaborative arrangements must be discussed in detail. Proposals which 
indicate joint projects with other institutions must state which 
proposer is to receive any resulting grant award, since only one 
submitting institution can be the recipient of a project grant under one 
proposal.
    (C) Explain how the project will create a new or enhance an existing 
partnership between the USDA agency cooperator(s) and the 1890 
Institution(s). This section should expand upon the summary information 
provided in the documentation of USDA agency cooperation section, as 
outlined in paragraph (c)(1) of this section. This is particularly 
important because the focal point of attention in the peer review 
process is the proposal narrative. Therefore, a comprehensive discussion 
of the partnership effort between USDA and the 1890 Institution should 
be provided.
    (3) Institutional capacity building--(i) Institutional enhancement. 
Explain how the proposed project will strengthen the teaching capacity, 
as defined in Sec. 3406.2 of this part, of the applicant institution 
and, if applicable, any other institutions assuming a major role in the 
conduct of the project. For example, describe how the proposed project 
is intended to strengthen the institution's academic infrastructure by 
expanding the current faculty's expertise base, advancing the scholarly 
quality of the institution's academic programs, enriching the racial, 
ethnic, or gender diversity of the student body, helping the institution 
establish itself as a center of excellence in a particular field of 
education, helping the institution maintain or acquire state-of-the-art 
scientific instrumentation or library collections for teaching, or 
enabling the institution to provide more meaningful student experiential 
learning opportunities.
    (ii) Institutional commitment. (A) Discuss the institution's 
commitment to the project and its successful completion. Provide, as 
relevant, appropriate documentation in the Appendix. Substantiate that 
the institution attributes a high priority to the project.
    (B) Discuss how the project will contribute to the achievement of 
the institution's long-term (five- to ten-year) goals and how the 
project will help satisfy the institution's high-priority objectives. 
Show how this project is linked to and supported by the institution's 
strategic plan.
    (C) Discuss the commitment of institutional resources to the 
project. Show that the institutional resources to be made available to 
the project will be adequate, when combined with the support requested 
from USDA, to carry out the activities of the project and represent a 
sound commitment by the institution. Discuss institutional facilities, 
equipment, computer services, and other appropriate resources available 
to the project.
    (g) Key personnel. A Form CSREES-708, ``Summary Vita--Teaching 
Proposal,'' should be included for each key person associated with the 
project.
    (h) Budget and cost-effectiveness--(1) Budget form. (i) Prepare Form 
CSREES-713, ``Higher Education Budget,'' in accordance with instructions 
provided with the form. Proposals may request support for a period to be 
identified in each year's program announcement. A budget form is 
required for each year of requested support. In addition, a summary 
budget is required detailing the requested total support for the overall 
project period. Form CSREES-713 may be reproduced as

[[Page 369]]

needed by proposers. Funds may be requested under any of the categories 
listed on the form, provided that the item or service for which support 
is requested is allowable under the authorizing legislation, the 
applicable Federal cost principles, the administrative provisions in 
this part, and can be justified as necessary for the successful conduct 
of the proposed project.
    (ii) The approved negotiated instruction rate or the maximum rate 
allowed by law should be used when computing indirect costs. If a 
reduced rate of indirect costs is voluntarily requested from USDA, the 
remaining allowable indirect costs may be used as matching funds.
    (2) Matching funds. When documenting matching contributions, use the 
following guidelines:
    (i) When preparing the column entitled ``Applicant Contributions To 
Matching Funds'' of Form CSREES-713, only those costs to be contributed 
by the applicant for the purposes of matching should be shown. The total 
amount of this column should be indicated in item M.
    (ii) In item N of Form CSREES-713, show a total dollar amount for 
Cash Contributions from both the applicant and any third parties; also 
show a total dollar amount (based on current fair market value) for Non-
cash Contributions from both the applicant and any third parties.
    (iii) To qualify for any incentive benefits stemming from matching 
support or to satisfy any cost sharing requirements, proposals must 
include written verification of any actual commitments of matching 
support (including both cash and non-cash contributions) from third 
parties. Written verification means--
    (A) For any third party cash contributions, a separate pledge 
agreement for each donation, signed by the authorized organizational 
representative(s) of the donor organization (or by the donor if the gift 
is from an individual) and the applicant institution, which must 
include:
    (1) The name, address, and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) The dollar amount of the cash donation; and
    (5) A statement that the donor will pay the cash contribution during 
the grant period; and
    (B) For any third party non-cash contributions, a separate pledge 
agreement for each contribution, signed by the authorized organizational 
representative(s) of the donor organization (or by the donor if the gift 
is from an individual) and the applicant institution, which must 
include:
    (1) The name, address, and telephone number of the donor;
    (2) The name of the applicant institution;
    (3) The title of the project for which the donation is made;
    (4) A good faith estimate of the current fair market value of the 
non-cash contribution; and
    (5) A statement that the donor will make the contribution during the 
grant period.
    (iv) All pledge agreements must be placed in the proposal 
immediately following Form CSREES-713. The sources and amounts of all 
matching support from outside the applicant institution should be 
summarized in the Budget Narrative section of the proposal.
    (v) Applicants should refer to OMB Circulars A-110, ``Uniform 
Administrative Requirements for Grants and Agreements With Institutions 
of Higher Education, Hospitals and Other Non-profit Organizations,'' and 
A-21, ``Cost Principles for Educational Institutions,'' for further 
guidance and other requirements relating to matching and allowable 
costs.
    (3) Chart on shared budget for joint project proposal. (i) For a 
joint project proposal, a plan must be provided indicating how funds 
will be distributed to the participating institutions. The budget 
section of a joint project proposal should include a chart indicating:
    (A) The names of the participating institutions;
    (B) the amount of funds to be disbursed to those institutions; and
    (C) the way in which such funds will be used in accordance with 
items A through L of Form CSREES-713, ``Higher Education Budget.''

[[Page 370]]

    (ii) If a proposal is not for a joint project, such a chart is not 
required.
    (4) Budget narrative. (i) Discuss how the budget specifically 
supports the proposed project activities. Explain how each budget item 
(such as salaries and wages for professional and technical staff, 
student stipends/scholarships, travel, equipment, etc.) is essential to 
achieving project objectives.
    (ii) Justify that the total budget, including funds requested from 
USDA and any matching support provided, will be adequate to carry out 
the activities of the project. Provide a summary of sources and amounts 
of all third party matching support.
    (iii) Justify the project's cost-effectiveness. Show how the project 
maximizes the use of limited resources, optimizes educational value for 
the dollar, achieves economies of scale, or leverages additional funds. 
For example, discuss how the project has the potential to generate a 
critical mass of expertise and activity focused on a targeted need area 
or promote coalition building that could lead to future ventures.
    (iv) Include the percentage of time key personnel will work on the 
project, both during the academic year and summer. When salaries of 
university project personnel will be paid by a combination of USDA and 
institutional funds, the total compensation must not exceed the faculty 
member's regular annual compensation. In addition, the total commitment 
of time devoted to the project, when combined with time for teaching and 
research duties, other sponsored agreements, and other employment 
obligations to the institution, must not exceed 100 percent of the 
normal workload for which the employee is compensated, in accordance 
with established university policies and applicable Federal cost 
principles.
    (v) If the proposal addresses more than one targeted need area 
(e.g., student experiential learning and instruction delivery systems), 
estimate the proportion of the funds requested from USDA that will 
support each respective targeted need area.
    (i) Current and pending support. Each applicant must complete Form 
CSREES-663, ``Current and Pending Support,'' identifying any other 
current public- or private-sponsored projects, in addition to the 
proposed project, to which key personnel listed in the proposal under 
consideration have committed portions of their time, whether or not 
salary support for the person(s) involved is included in the budgets of 
the various projects. This information should also be provided for any 
pending proposals which are currently being considered by, or which will 
be submitted in the near future to, other possible sponsors, including 
other USDA programs or agencies. Concurrent submission of identical or 
similar projects to other possible sponsors will not prejudice the 
review or evaluation of a project under this program.
    (j) Appendix. Each project narrative is expected to be complete in 
itself and to meet the 20-page limitation. Inclusion of material in an 
Appendix should not be used to circumvent the 20-page limitation of the 
proposal narrative. However, in those instances where inclusion of 
supplemental information is necessary to guarantee the peer review 
panel's complete understanding of a proposal or to illustrate the 
integrity of the design or a main thesis of the proposal, such 
information may be included in an Appendix. Examples of supplemental 
material are photographs, journal reprints, brochures and other 
pertinent materials which are deemed to be illustrative of major points 
in the narrative but unsuitable for inclusion in the proposal narrative 
itself. Information on previously submitted proposals may also be 
presented in the Appendix (refer to paragraph(e) of this section). When 
possible, information in the Appendix should be presented in tabular 
format. A complete set of the Appendix material must be attached to each 
copy of the grant application submitted. The Appendix must be identified 
with the title of the project as it appears on Form CSREES-712 of the 
proposal and the name(s) of the project director(s). The Appendix must 
be referenced in the proposal narrative.