[Code of Federal Regulations]
[Title 40, Volume 21]
[Revised as of July 1, 2005]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR122.29]

[Page 197-199]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 122_EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT 
DISCHARGE ELIMINATION SYSTEM--Table of Contents
 
   Subpart B_Permit Application and Special NPDES Program Requirements
 
Sec. 122.29  New sources and new dischargers.

    (a) Definitions. (1) New source and new discharger are defined in 
Sec. 122.2. [See Note 2.]
    (2) Source means any building, structure, facility, or installation 
from which there is or may be a discharge of pollutants.
    (3) Existing source means any source which is not a new source or a 
new discharger.
    (4) Site is defined in Sec. 122.2;
    (5) Facilities or equipment means buildings, structures, process or 
production equipment or machinery which form a permanent part of the new 
source and which will be used in its operation, if these facilities or 
equipment are of such value as to represent a substantial commitment to 
construct. It excludes facilities or equipment used in connection with 
feasibility, engineering, and design studies regarding the source or 
water pollution treatment for the source.
    (b) Criteria for new source determination. (1) Except as otherwise 
provided in an applicable new source performance standard, a source is a 
``new

[[Page 198]]

source'' if it meets the definition of ``new source'' in Sec. 122.2, 
and
    (i) It is constructed at a site at which no other source is located; 
or
    (ii) It totally replaces the process or production equipment that 
causes the discharge of pollutants at an existing source; or
    (iii) Its processes are substantially independent of an existing 
source at the same site. In determining whether these processes are 
substantially independent, the Director shall consider such factors as 
the extent to which the new facility is integrated with the existing 
plant; and the extent to which the new facility is engaged in the same 
general type of activity as the existing source.
    (2) A source meeting the requirements of paragraphs (b)(1) (i), 
(ii), or (iii) of this section is a new source only if a new source 
performance standard is independently applicable to it. If there is no 
such independently applicable standard, the source is a new discharger. 
See Sec. 122.2.
    (3) Construction on a site at which an existing source is located 
results in a modification subject to Sec. 122.62 rather than a new 
source (or a new discharger) if the construction does not create a new 
building, structure, facility, or installation meeting the criteria of 
paragraph (b)(1) (ii) or (iii) of this section but otherwise alters, 
replaces, or adds to existing process or production equipment.
    (4) Construction of a new source as defined under Sec. 122.2 has 
commenced if the owner or operator has:
    (i) Begun, or caused to begin as part of a continuous on-site 
construction program:
    (A) Any placement, assembly, or installation of facilities or 
equipment; or
    (B) Significant site preparation work including clearing, excavation 
or removal of existing buildings, structures, or facilities which is 
necessary for the placement, assembly, or installation of new source 
facilities or equipment; or
    (ii) Entered into a binding contractual obligation for the purchase 
of facilities or equipment which are intended to be used in its 
operation with a reasonable time. Options to purchase or contracts which 
can be terminated or modified without substantial loss, and contracts 
for feasibility engineering, and design studies do not constitute a 
contractual obligation under the paragraph.
    (c) Requirement for an environmental impact statement. (1) The 
issuance of an NPDES permit to new source:
    (i) By EPA may be a major Federal action significantly affecting the 
quality of the human environment within the meaning of the National 
Environmental Policy Act of 1969 (NEPA), 33 U.S.C. 4321 et seq. and is 
subject to the environmental review provisions of NEPA as set out in 40 
CFR part 6, subpart F. EPA will determine whether an Environmental 
Impact Statement (EIS) is required under Sec. 122.21(l) (special 
provisions for applications from new sources) and 40 CFR part 6, subpart 
F;
    (ii) By an NPDES approved State is not a Federal action and 
therefore does not require EPA to conduct an environmental review.
    (2) An EIS prepared under this paragraph shall include a 
recommendation either to issue or deny the permit.
    (i) If the recommendation is to deny the permit, the final EIS shall 
contain the reasons for the recommendation and list those measures, if 
any, which the applicant could take to cause the recommendation to be 
changed;
    (ii) If the recommendation is to issue the permit, the final EIS 
shall recommend the actions, if any, which the permittee should take to 
prevent or minimize any adverse environmental impacts;
    (3) The Regional Administrator, to the extent allowed by law, shall 
issue, condition (other than imposing effluent limitations), or deny the 
new source NPDES permit following a complete evaluation of any 
significant beneficial and adverse impacts of the proposed action and a 
review of the recommendations contained in the EIS or finding of no 
significant impact.
    (d) Effect of compliance with new source performance standards. (The 
provisions of this paragraph do not apply to existing sources which 
modify their pollution control facilities or construct new pollution 
control facilities and achieve performance standards, but which are 
neither new sources or new

[[Page 199]]

dischargers or otherwise do not meet the requirements of this 
paragraph.)
    (1) Except as provided in paragraph (d)(2) of this section, any new 
discharger, the construction of which commenced after October 18, 1972, 
or new source which meets the applicable promulgated new source 
performance standards before the commencement of discharge, may not be 
subject to any more stringent new source performance standards or to any 
more stringent technology-based standards under section 301(b)(2) of CWA 
for the soonest ending of the following periods:
    (i) Ten years from the date that construction is completed;
    (ii) Ten years from the date the source begins to discharge process 
or other nonconstruction related wastewater; or
    (iii) The period of depreciation or amortization of the facility for 
the purposes of section 167 or 169 (or both) of the Internal Revenue 
Code of 1954.
    (2) The protection from more stringent standards of performance 
afforded by paragraph (d)(1) of this section does not apply to:
    (i) Additional or more stringent permit conditions which are not 
technology based; for example, conditions based on water quality 
standards, or toxic effluent standards or prohibitions under section 
307(a) of CWA; or
    (ii) Additional permit conditions in accordance with Sec. 125.3 
controlling toxic pollutants or hazardous substances which are not 
controlled by new source performance standards. This includes permit 
conditions controlling pollutants other than those identified as toxic 
pollutants or hazardous substances when control of these pollutants has 
been specifically identified as the method to control the toxic 
pollutants or hazardous substances.
    (3) When an NPDES permit issued to a source with a ``protection 
period'' under paragraph (d)(1) of this section will expire on or after 
the expiration of the protection period, that permit shall require the 
owner or operator of the source to comply with the requirements of 
section 301 and any other then applicable requirements of CWA 
immediately upon the expiration of the protection period. No additional 
period for achieving compliance with these requirements may be allowed 
except when necessary to achieve compliance with requirements 
promulgated less than 3 years before the expiration of the protection 
period.
    (4) The owner or operator of a new source, a new discharger which 
commenced discharge after August 13, 1979, or a recommencing discharger 
shall install and have in operating condition, and shall ``start-up'' 
all pollution control equipment required to meet the conditions of its 
permits before beginning to discharge. Within the shortest feasible time 
(not to exceed 90 days), the owner or operator must meet all permit 
conditions. The requirements of this paragraph do not apply if the owner 
or operator is issued a permit containing a compliance schedule under 
Sec. 122.47(a)(2).
    (5) After the effective date of new source performance standards, it 
shall be unlawful for any owner or operator of any new source to operate 
the source in violation of those standards applicable to the source.

[48 FR 14153, Apr. 1, 1983, as amended at 49 FR 38048, Sept. 26, 1984; 
50 FR 4514, Jan. 31, 1985; 50 FR 6941, Feb. 19, 1985; 65 FR 30908, May 
15, 2000]