[Code of Federal Regulations]
[Title 40, Volume 24]
[Revised as of July 1, 2005]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR258.41]

[Page 408-412]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 258_CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS--Table of Contents
 
                        Subpart D_Design Criteria
 
Sec. 258.41  Project XL Bioreactor Landfill Projects.

    (a) Buncombe County, North Carolina Project XL Bioreactor Landfill 
Requirements. Paragraph (a) of this section applies to Cells 1, 2, 3, 4, 
and 5 of the Buncombe County Solid Waste Management Facility located in 
the County of Buncombe, North Carolina, owned and operated by the 
Buncombe County Solid Waste Authority, or its successors. This paragraph 
(a) will also apply to Cells 6, 7, 8, 9, and 10, provided that the EPA 
Regional Administrator for Region 4 and the State Director determine 
that the pilot project in Cells 3, 4, and 5 is performing as expected 
and that the pilot project has not exhibited detrimental environmental 
results.
    (1) The Buncombe County Solid Waste Authority is allowed to place 
liquid waste in the Buncombe County Solid Waste Management Facility, 
provided that the provisions of paragraphs (a)(2) through (9) of this 
section are met.
    (2) The only liquid waste allowed under this section is leachate or 
gas condensate derived from the MSWLF, which may be supplemented with 
water from the French Broad River. The owner or operator shall control 
any liquids to the landfill to assure that the average moisture content 
of the landfill does not exceed 50% by weight. Liquid addition and 
recirculation is allowed only to the extent that the integrity of the 
landfill including its liner system is maintained, as determined by the 
State Director.
    (3) The MSWLF unit shall be designed and constructed with a liner 
and leachate collection system as described in Sec. 258.40(a)(2) or 
paragraphs (a)(4) and (5) of this section. The owner or operator must 
place documentation of the landfill design in the operating record and 
notify the State Director that it has been placed in operating record;
    (4) Cells 3-10 shall be constructed with a liner system consisting 
of the components described in paragraphs (a)(4)(i) through (v) of this 
section, or an equivalent or superior liner system as determined by the 
State Director:
    (i) A lower component consisting of at least 18 inches of compacted 
soil with a hydraulic conductivity of no more than 1x10-5 cm/
sec., and
    (ii) An upper component consisting of a minimum 30-millimeter 
(``mil'') flexible membrane liner (FML) or 60-mil if High Density 
Polyethylene (``HDPE'') is used, and
    (iii) A geosynthetic clay liner (GCL) overlaying and in direct 
contact with the 18 inches of compacted soil in paragraph (a)(4) of this 
section and having the following properties:
    (A) The GCL shall be formulated and manufactured from polypropylene 
geotextiles and high swelling containment resistant sodium bentonite. 
The bentonite-geotextile liner shall be manufactured using a minimum of 
one pound per square foot as determined using the Standard Test Method 
for Measuring Mass per Unit Area of Geotextiles, ASTM D-5261-92 
(reapproved in 1996). The high swelling sodium montmorillonite clay 
shall be at 12% moisture content as determined by the Standard Test 
Method for Laboratory Determination of Water (Moisture) Content of Soil 
and Rock by Mass, ASTM D2216-98. The Director of the Federal Register 
approves this incorporation by reference with 5 U.S.C. 552(a) and 1 CFR 
part 51. These methods are available from The American Society for 
Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 
19428-2959. These methods may be inspected at EPA's docket office 
located at Crystal Gateway, 1235 Jefferson Davis Highway, First Floor, 
Arlington, Virginia, or at the National Archives and Records 
Administration (NARA). For information on the availability of this 
material at NARA, call 202-741-6030, or go to: http://www.archives.gov/
federal--register/code--of--federal--regulations/ibr--locations.html.
    (B) The encapsulating geotextile shall be polypropylene and shall 
have a minimum weight of 6 oz./square yard.
    (iv) The upper component shall be installed in direct and uniform 
contact with an overlaying soil cushioning component.
    (v) Underlying the above liner system, there shall also be installed 
a leak detection system consisting of a 60-mil HDPE liner placed on a 
prepared subgrade.

[[Page 409]]

    (A) A 4 inch capped pipe will drain liquid collected in the sump out 
beyond the footprint of the landfill cell.
    (B) Water collected on the leak detection liner shall be monitored 
at least semi-annually as directed by the State Director to determine 
whether any leachate escaped the liner system.
    (5) Cells 3-10 shall be designed and constructed with a leachate 
collection system to maintain less than 30 centimeters depth of leachate 
is present at the sump location. The leachate collection system shall 
include a continuous monitoring system to monitor depth of leachate.
    (6) The owner/operator shall keep the Federally Enforceable State 
Operating Permit (FESOP) issued by the Western North Carolina Air 
Quality Agency for the Buncombe County Solid Waste Management Facility 
in effect, and shall comply with the provisions of the FESOP, during the 
entire period of leachate recirculation and the post closure period. The 
FESOP was issued on November 13, 2000 and contains the air quality 
requirements for the Buncombe County Landfill XL project.
    (7) Monitoring and Reporting Requirements. The owner or operator of 
the Buncombe County Solid Waste Management Facility shall monitor for 
the parameters listed in paragraphs (a)(7)(i) through (xiii) of this 
section and submit an annual report on the XL project to the EPA 
Regional Administrator for Region 4 and the State Director. The first 
report is due coincident with the October 2001 report to the state. The 
report should state what progress has been made toward the superior 
environmental performance and other commitments as stated in the Final 
Project Agreement. The report shall include, at a minimum, the following 
data:
    (i) Amount of landfill gas generated;
    (ii) Percent capture of landfill gas, if known;
    (iii) Quality of the landfill gas, amount and type of liquids 
applied to the landfill;
    (iv) Method of liquids application to the landfill;
    (v) Quantity of waste placed in the landfill;
    (vi) Quantity and quality of leachate collected;
    (vii) Quantity of leachate recirculated back into the landfill;
    (viii) Information on the pretreatment of waste applied to the 
landfill;
    (ix) Data collected on landfill temperature and moisture content;
    (x) Data on the leachate pressure (head) on the liner;
    (xi) Observations, information, and studies made on the physical 
stability of the MSWLF units that are developed during the project term, 
if any.
    (xii) The above data may be summarized, and, at a minimum shall 
contain, the minimum, maximum, median, and average data points as well 
as the frequency of monitoring as applicable.
    (xiii) The method and frequency of monitoring shall be specified by 
the State Director.
    (8) Termination and Withdrawal.
    (i) Paragraph (a) of this section will terminate August 22, 2026, 
unless a subsequent rulemaking is issued or terminated earlier pursuant 
to paragraph (a)(8)(ii) of this section.
    (ii) In the event of noncompliance with paragraph (a) of this 
section, EPA may terminate the authority under paragraph (a) of this 
section and the authority to add liquid wastes to all or part of cells 
3-10 under Sec. 258.28(a)(3). The EPA Regional Administrator will 
provide written notice of intent to terminate to the Buncombe County 
Solid Waste Authority with a copy to the State Director. The notice will 
state EPA's intent to terminate under the rules and will include a brief 
statement of EPA's reasons for its action. The termination will take 
effect 60 days from the date of the notice, unless the EPA Regional 
Administrator for Region 4 issues a written notice rescinding the 
termination.
    (9) Compliance requirements in the event of termination or 
withdrawal. The Buncombe County Solid Waste Management Facility will be 
subject to all regulatory provisions applicable to MSWLFs upon 
termination of authority under this section. In the event of early 
termination of this section, the EPA Regional Administrator for Region 4 
may provide an interim period of compliance to allow Buncombe County

[[Page 410]]

a reasonable period of time for transition following cessation of 
liquids addition.
    (b) This section applies solely to Module D of the Yolo County 
Central Landfill owned and operated by the County of Yolo, California, 
or its successors. It allows the Yolo County Central Landfill to add 
bulk or noncontainerized liquid wastes to Module D under the following 
conditions:
    (1) Module D shall be designed and constructed with a composite 
liner as defined in Sec. 258.40(b) and a leachate collection system 
that functions and continuously monitors to ensure that less than 30 
centimeters depth of leachate is maintained over the liner.
    (2) The owner or operator of the Yolo County Central Landfill must 
ensure that the concentration values listed in Table 1 of Sec. 258.40 
are not exceeded in the uppermost aquifer at the relevant point of 
compliance for the landfill as specified by the State Director under 
Sec. 258.40(d).
    (3) The owner or operator of the Yolo County Central Landfill shall 
demonstrate that the addition of any liquids to Module D does not result 
in an increased leakage rate, and does not result in liner slippage, or 
otherwise compromise the integrity of the landfill and its liner system, 
as determined by the State Director.
    (4) The owner or operator of the Yolo County Central Landfill must 
ensure that Module D is operated in such a manner so as to prevent any 
landfill fires from occurring.
    (5) The owner or operator of the Yolo County Central Landfill shall 
submit an annual report to the EPA Regional Administrator and the State 
Director. The first report is due within 18 months after August 13, 
2001. The report shall state what progress the Project is making towards 
the superior environmental performance as stated in the Final Project 
Agreement. The data in paragraphs (b)(5)(i) through (xvi) of this 
section may be summarized, but, at a minimum, shall contain the minimum, 
maximum, median, and average data points as well as the frequency of 
monitoring, as applicable. These reporting provisions shall remain in 
effect for as long as the owner or operator of the Yolo County Central 
Landfill continues to add liquid waste to Module D. Additional 
monitoring, record keeping and reporting requirements related to 
landfill gas will be contained in a permit executed by the local air 
quality management district pursuant to the Clean Air Act, 42 U.S.C. 
7401 et seq. Application of this site-specific rule to the Yolo County 
Central Landfill is conditioned upon the issuance of such permit. The 
annual report will include, at a minimum, the following data:
    (i) Amount of landfill gas generated;
    (ii) Percent capture of landfill gas;
    (iii) Quality of the landfill gas;
    (iv) Amount and type of liquids applied to the landfill;
    (v) Method of liquids application to the landfill;
    (vi) Quantity of waste placed in the landfill;
    (vii) Quantity and quality of leachate collected, including at least 
the following parameters, monitored, at a minimum, on an annual basis:
    (A) pH;
    (B) Conductivity;
    (C) Dissolved oxygen;
    (D) Dissolved solids;
    (E) Biochemical oxygen demand;
    (F) Chemical oxygen demand;
    (G) Organic carbon;
    (H) Nutrients, (including ammonia [``NH3''], total 
kjeldahl nitrogen [``TKN''], and total phosphorus [``TP'']);
    (I) Common ions;
    (J) Heavy metals;
    (K) Organic priority pollutants; and
    (L) Flow rate;
    (viii) Quantity of leachate recirculated back into the landfill;
    (ix) Information on the pretreatment of solid and liquid waste 
applied to the landfill;
    (x) Landfill temperature;
    (xi) Landfill moisture content;
    (xii) Data on the leachate pressure (head) on the liner;
    (xiii) The amount of aeration of the waste;
    (xiv) Data on landfill settlement;
    (xv) Any information on the performance of the landfill cover; and
    (xvi) Observations, information, or studies made on the physical 
stability of the landfill.

[[Page 411]]

    (6) This section will remain in effect until August 13, 2006. By 
August 13, 2006, Yolo County Central Landfill shall return to compliance 
with the regulatory requirements which would have been in effect absent 
the flexibility provided through this Project XL site-specific rule. 
This section applies to Phase I of Module D. This section also will 
apply to any phase of Module D beyond Phase I only if a second Final 
Project Agreement that describes the additional phase has been signed by 
representatives of EPA Region 9, Yolo County, and the State of 
California. Phase I of Module D is defined as the operation of twelve 
acres of the twenty acre Module D.
    (c) Virginia Landfills XL Project Requirements. Paragraph (c) of 
this section applies solely to two Virginia landfills operated by the 
Waste Management, Inc. or its successors: The Maplewood Recycling and 
Waste Disposal Facility, located in Amelia County, Virginia (``Maplewood 
Landfill''); and the King George County Landfill and Recycling Facility, 
located in King George County, Virginia (``King George Landfill'') 
collectively hereinafter, ``the VA Project XL Landfills or landfill.'' 
The VA Project XL Landfills are allowed to add non-hazardous bulk or 
non-containerized liquids including, leachate, storm water and truck 
wash water, hereinafter, ``liquid or liquids'', to Cell 3 of the King 
George Landfill (hereinafter ``Cell 3'') and Phases 1 and 2 of the 
Maplewood Landfill (hereinafter ``Phases 1 and 2'') under the following 
conditions:
    (1) The operator of the landfill shall maintain the liners 
underlying Cell 3 and Phases 1 and 2, which were designed and 
constructed with an alternative liner as defined in Sec. 258.40(a)(1) 
in accord with their current installed design in order to maintain the 
integrity of the liner system and keep it and the leachate collection 
system in good operating order. The operator of the landfill shall 
ensure that the addition of any liquids does not result in an increased 
leakage rate, and does not result in liner slippage, or otherwise 
compromise the integrity of the landfill and its liner system, as 
determined by the State Director. In addition, the leachate collection 
system shall be operated, monitored and maintained to ensure that less 
than 30 cm depth of leachate is maintained over the liner.
    (2) The operator of the landfill shall ensure that the concentration 
values listed in Table 1 of Sec. 258.40 are not exceeded in the 
uppermost aquifer at the relevant point of compliance for the landfill, 
as specified by the State Director, under Sec. 258.40(d).
    (3) The operator of the landfill shall monitor and report whether 
surface seeps are occurring and determine whether they are attributable 
to operation of the liquid application system. EPA and VADEQ shall be 
notified in the semi-annual report of the occurrence of any seeps.
    (4) The operator of the landfill shall determine on a monthly basis 
the leachate quality in test and control areas with and without liquid 
addition. The operator of the landfill shall collect monthly samples of 
the landfill leachate and analyze them for the following parameters: pH, 
Conductivity, Dissolved Oxygen, Dissolved Solids, Biochemical Oxygen 
Demand, Chemical Oxygen Demand, Organic Carbon, Nutrients (ammonia, 
total kjeldahl nitrogen, total phosphorus), Common Ions, Heavy Metals 
and Organic Priority Pollutants.
    (5) The operator of the landfill shall determine on a semi-annual 
basis the total quantity of leachate collected in test and control 
areas; the total quantity of liquids applied in the test areas and 
determination of any changes in this quantity over time; the total 
quantity of leachate in on-site storage structures and any leachate 
taken for offsite disposal.
    (6) Prior to the addition of any liquid to the landfill, the 
operator of the landfill shall perform an initial characterization of 
the liquid and notify EPA and VADEQ of the liquid proposed to be added. 
The parameters for the initial characterization of liquids shall be the 
same as the monthly parameters for the landfill leachate specified in 
paragraph (c)(4) of this section. The operator shall annually test all 
liquids added to the landfill and compare these results to the initial 
characterization.
    (7) The operator of the landfill shall ensure that Cell 3 and Phases 
1 and 2 are operated in such a manner so as to

[[Page 412]]

prevent any landfill fires from occurring. The operator of the landfill 
shall monitor the gas temperature at well heads, at a minimum, on a 
monthly basis.
    (8) The operator of the landfill shall perform an annual surface 
topographic survey to determine the rate of the settlement of the waste 
in the test and control areas.
    (9) The operator of the landfill shall monitor and record the 
frequency of odor complaints during and after liquid application events. 
EPA and VADEQ shall be notified of the occurrence of any odor complaints 
in the semi-annual report.
    (10) The operator of the landfill shall collect representative 
samples of the landfill waste in the test areas on an annual basis and 
analyze the samples for the following solid waste stabilization and 
decomposition parameters: Moisture Content, Biochemical Methane 
Potential, Cellulose, Lignin, Hemi-cellulose, Volatile Solids and pH.
    (11) The operator of the landfill shall report to the EPA Regional 
Administrator and the State Director on the information described in 
paragraphs (c)(1) through (10) of this section on a semi-annual basis. 
The first report is due within 6 months after the effective date of this 
section. These reporting provisions shall remain in effect for the 
duration of the project term.
    (12) Additional monitoring, record keeping and reporting 
requirements related to landfill gas will be contained in a Federally 
Enforceable State Operating Permit (``FESOP'') for the VA Project XL 
Landfills issued pursuant to the Clean Air Act, 42 U.S.C. 7401 et seq. 
Application of this site-specific rule to the VA Project XL Landfills is 
conditioned upon the issuance of such a FESOP.
    (13) This section applies until July 18, 2012. By July 18, 2012, the 
VA Project XL Landfills must return to compliance with the regulatory 
requirements which would have been in effect absent the flexibility 
provided through this section. If EPA Region 3's Regional Administrator, 
the Commonwealth of Virginia and Waste Management agree to an amendment 
of the project term, the parties must enter into an amended or new Final 
Project Agreement for any such amendment.
    (14) The authority provided by this section may be terminated before 
the end of the 10 year period in the event of noncompliance with the 
requirements of paragraph (c) of this section, the determination by the 
EPA Region 3's Regional Administrator that the project has failed to 
achieve the expected level of environmental performance, or the 
promulgation of generally applicable requirements that would apply to 
all landfills that meet or exceed the performance standard set forth in 
Sec. 258.40(a)(1). In the event of early termination EPA in 
consultation with the Commonwealth of Virginia will determine an interim 
compliance period to provide sufficient time for the operator to return 
the landfills to compliance with the regulatory requirements which would 
have been in effect absent the authority provided by this section. The 
interim compliance period shall not exceed six months.

[66 FR 42449, Aug. 13, 2001, as amended at 66 FR 44069, Aug. 22, 2001; 
67 FR 47319, July 18, 2002; 69 FR 18803, Apr. 9, 2004]