Sec. 270.42  Permit modification at the request of the permittee.

    (a) Class 1 modifications. (1) Except as provided in paragraph 
(a)(2) of this section, the permittee may put into effect Class 1 
modifications listed in appendix I of this section under the following 
conditions:
    (i) The permittee must notify the Director concerning the 
modification by certified mail or other means that establish proof of 
delivery within 7 calendar days after the change is put into effect. 
This notice must specify the changes being made to permit conditions or 
supporting documents referenced by the permit and must explain why they 
are necessary. Along with the notice, the permittee must provide the 
applicable information required by Sec. Sec. 270.13 through 270.21, 
270.62, and 270.63.
    (ii) The permittee must send a notice of the modification to all 
persons on the facility mailing list, maintained by the Director in 
accordance with 40 CFR 124.10(c)(viii), and the appropriate units of 
State and local government, as specified in 40 CFR 124.10(c)(ix). This 
notification must be made within 90 calendar days after the change is 
put into effect. For the Class I modifications that require prior 
Director approval, the notification must be made within 90 calendar days 
after the Director approves the request.
    (iii) Any person may request the Director to review, and the 
Director may for cause reject, any Class 1 modification. The Director 
must inform the permittee by certified mail that a Class 1 modification 
has been rejected, explaining the reasons for the rejection. If a Class 
1 modification has been rejected, the permittee must comply with the 
original permit conditions.
    (2) Class 1 permit modifications identified in appendix I by an 
asterisk may be made only with the prior written approval of the 
Director.
    (3) For a Class 1 permit modification, the permittee may elect to 
follow the procedures in Sec. 270.42(b) for Class 2 modifications 
instead of the Class 1 procedures. The permittee must inform the 
Director of this decision in the notice required in Sec. 270.42(b)(1).
    (b) Class 2 modifications. (1) For Class 2 modifications, listed in 
appendix I of this section, the permittee must submit a modification 
request to the Director that:
    (i) Describes the exact change to be made to the permit conditions 
and supporting documents referenced by the permit;
    (ii) Identifies that the modification is a Class 2 modification;
    (iii) Explains why the modification is needed; and
    (iv) Provides the applicable information required by Sec. Sec. 
270.13 through 270.21, 270.62, and 270.63.
    (2) The permittee must send a notice of the modification request to 
all persons on the facility mailing list maintained by the Director and 
to the appropriate units of State and local government as specified in 
40 CFR 124.10(c)(ix) and must publish this notice in a major local 
newspaper of general circulation. This notice must be mailed and 
published within 7 days before or after the date of submission of the 
modification request, and the permittee must provide to the Director 
evidence of the mailing and publication. The notice must include:
    (i) Announcement of a 60-day comment period, in accordance with 
Sec. 270.42(b)(5), and the name and address of an Agency contact to 
whom comments must be sent;
    (ii) Announcement of the date, time, and place for a public meeting 
held in accordance with Sec. 270.42(b)(4);
    (iii) Name and telephone number of the permittee's contact person;
    (iv) Name and telephone number of an Agency contact person;
    (v) Location where copies of the modification request and any 
supporting documents can be viewed and copied; and
    (vi) The following statement: ``The permittee's compliance history 
during the life of the permit being modified is available from the 
Agency contact person.''

[[Page 318]]

    (3) The permittee must place a copy of the permit modification 
request and supporting documents in a location accessible to the public 
in the vicinity of the permitted facility.
    (4) The permittee must hold a public meeting no earlier than 15 days 
after the publication of the notice required in paragraph (b)(2) of this 
section and no later than 15 days before the close of the 60-day comment 
period. The meeting must be held to the extent practicable in the 
vicinity of the permitted facility.
    (5) The public shall be provided 60 days to comment on the 
modification request. The comment period will begin on the date the 
permittee publishes the notice in the local newspaper. Comments should 
be submitted to the Agency contact identified in the public notice.
    (6)(i) No later than 90 days after receipt of the notification 
request, the Director must:
    (A) Approve the modification request, with or without changes, and 
modify the permit accordingly;
    (B) Deny the request;
    (C) Determine that the modification request must follow the 
procedures in Sec. 270.42(c) for Class 3 modifications for the 
following reasons:
    (1) There is significant public concern about the proposed 
modification; or
    (2) The complex nature of the change requires the more extensive 
procedures of Class 3.
    (D) Approve the request, with or without changes, as a temporary 
authorization having a term of up to 180 days, or
    (E) Notify the permittee that he or she will decide on the request 
within the next 30 days.
    (ii) If the Director notifies the permittee of a 30-day extension 
for a decision, the Director must, no later than 120 days after receipt 
of the modification request:
    (A) Approve the modification request, with or without changes, and 
modify the permit accordingly;
    (B) Deny the request; or
    (C) Determine that the modification request must follow the 
procedures in Sec. 270.42(c) for Class 3 modifications for the 
following reasons:
    (1) There is significant public concern about the proposed 
modification; or
    (2) The complex nature of the change requires the more extensive 
procedures of Class 3.
    (D) Approve the request, with or without changes, as a temporary 
authorization having a term of up to 180 days.
    (iii) If the Director fails to make one of the decisions specified 
in paragraph (b)(6)(ii) of this section by the 120th day after receipt 
of the modification request, the permittee is automatically authorized 
to conduct the activities described in the modification request for up 
to 180 days, without formal Agency action. The authorized activities 
must be conducted as described in the permit modification request and 
must be in compliance with all appropriate standards of 40 CFR part 265. 
If the Director approves, with or without changes, or denies the 
modification request during the term of the temporary or automatic 
authorization provided for in paragraphs (b)(6) (i), (ii), or (iii) of 
this section, such action cancels the temporary or automatic 
authorization.
    (iv)(A) In the case of an automatic authorization under paragraph 
(b)(6)(iii) of this section, or a temporary authorization under 
paragraph (b)(6) (i)(D) or (ii)(D) of this section, if the Director has 
not made a final approval or denial of the modification request by the 
date 50 days prior to the end of the temporary or automatic 
authorization, the permittee must within seven days of that time send a 
notification to persons on the facility mailing list, and make a 
reasonable effort to notify other persons who submitted written comments 
on the modification request, that:
    (1) The permittee has been authorized temporarily to conduct the 
activities described in the permit modification request, and
    (2) Unless the Director acts to give final approval or denial of the 
request by the end of the authorization period, the permittee will 
receive authorization to conduct such activities for the life of the 
permit.
    (B) If the owner/operator fails to notify the public by the date 
specified in paragraph (b)(6)(iv)(A) of this section,

[[Page 319]]

the effective date of the permanent authorization will be deferred until 
50 days after the owner/operator notifies the public.
    (v) Except as provided in paragraph (b)(6)(vii) of this section, if 
the Director does not finally approve or deny a modification request 
before the end of the automatic or temporary authorization period or 
reclassify the modification as a Class 3, the permittee is authorized to 
conduct the activities described in the permit modification request for 
the life of the permit unless modified later under Sec. 270.41 or Sec. 
270.42. The activities authorized under this paragraph must be conducted 
as described in the permit modification request and must be in 
compliance with all appropriate standards of 40 CFR part 265.
    (vi) In making a decision to approve or deny a modification request, 
including a decision to issue a temporary authorization or to reclassify 
a modification as a Class 3, the Director must consider all written 
comments submitted to the Agency during the public comment period and 
must respond in writing to all significant comments in his or her 
decision.
    (vii) With the written consent of the permittee, the Director may 
extend indefinitely or for a specified period the time periods for final 
approval or denial of a modification request or for reclassifying a 
modification as a Class 3.
    (7) The Director may deny or change the terms of a Class 2 permit 
modification request under paragraphs (b)(6) (i) through (iii) of this 
section for the following reasons:
    (i) The modification request is incomplete;
    (ii) The requested modification does not comply with the appropriate 
requirements of 40 CFR part 264 or other applicable requirements; or
    (iii) The conditions of the modification fail to protect human 
health and the environment.
    (8) The permittee may perform any construction associated with a 
Class 2 permit modification request beginning 60 days after the 
submission of the request unless the Director establishes a later date 
for commencing construction and informs the permittee in writing before 
day 60.
    (c) Class 3 modifications. (1) For Class 3 modifications listed in 
appendix I of this section, the permittee must submit a modification 
request to the Director that:
    (i) Describes the exact change to be made to the permit conditions 
and supporting documents referenced by the permit;
    (ii) Identifies that the modification is a Class 3 modification;
    (iii) Explains why the modification is needed; and
    (iv) Provides the applicable information required by 40 CFR 270.13 
through 270.22, 270.62, 270.63, and 270.66.
    (2) The permittee must send a notice of the modification request to 
all persons on the facility mailing list maintained by the Director and 
to the appropriate units of State and local government as specified in 
40 CFR 124.10(c)(ix) and must publish this notice in a major local 
newspaper of general circulation. This notice must be mailed and 
published within seven days before or after the date of submission of 
the modification request, and the permittee must provide to the Director 
evidence of the mailing and publication. The notice must include:
    (i) Announcement of a 60-day comment period, and a name and address 
of an Agency contact to whom comments must be sent;
    (ii) Announcement of the date, time, and place for a public meeting 
on the modification request, in accordance with Sec. 270.42(c)(4);
    (iii) Name and telephone number of the permittee's contact person;
    (iv) Name and telephone number of an Agency contact person;
    (v) Location where copies of the modification request and any 
supporting documents can be viewed and copied; and
    (vi) The following statement: ``The permittee's compliance history 
during the life of the permit being modified is available from the 
Agency contact person.''
    (3) The permittee must place a copy of the permit modification 
request and supporting documents in a location accessible to the public 
in the vicinity of the permitted facility.
    (4) The permittee must hold a public meeting no earlier than 15 days 
after

[[Page 320]]

the publication of the notice required in paragraph (c)(2) of this 
section and no later than 15 days before the close of the 60-day comment 
period. The meeting must be held to the extent practicable in the 
vicinity of the permitted facility.
    (5) The public shall be provided at least 60 days to comment on the 
modification request. The comment period will begin on the date the 
permittee publishes the notice in the local newspaper. Comments should 
be submitted to the Agency contact identified in the notice.
    (6) After the conclusion of the 60-day comment period, the Director 
must grant or deny the permit modification request according to the 
permit modification procedures of 40 CFR part 124. In addition, the 
Director must consider and respond to all significant written comments 
received during the 60-day comment period.
    (d) Other modifications. (1) In the case of modifications not 
explicitly listed in appendix I of this section, the permittee may 
submit a Class 3 modification request to the Agency, or he or she may 
request a determination by the Director that the modification should be 
reviewed and approved as a Class 1 or Class 2 modification. If the 
permittee requests that the modification be classified as a Class 1 or 2 
modification, he or she must provide the Agency with the necessary 
information to support the requested classification.
    (2) The Director shall make the determination described in paragraph 
(d)(1) of this section as promptly as practicable. In determining the 
appropriate class for a specific modification, the Director shall 
consider the similarity of the modification to other modifications 
codified in appendix I and the following criteria:
    (i) Class 1 modifications apply to minor changes that keep the 
permit current with routine changes to the facility or its operation. 
These changes do no substantially alter the permit conditions or reduce 
the capacity of the facility to protect human health or the environment. 
In the case of Class 1 modifications, the Director may require prior 
approval.
    (ii) Class 2 modifications apply to changes that are necessary to 
enable a permittee to respond, in a timely manner, to,
    (A) Common variations in the types and quantities of the wastes 
managed under the facility permit,
    (B) Technological advancements, and
    (C) Changes necessary to comply with new regulations, where these 
changes can be implemented without substantially changing design 
specifications or management practices in the permit.
    (iii) Class 3 modifications substantially alter the facility or its 
operation.
    (e) Temporary authorizations. (1) Upon request of the permittee, the 
Director may, without prior public notice and comment, grant the 
permittee a temporary authorization in accordance with this subsection. 
Temporary authorizations must have a term of not more than 180 days.
    (2)(i) The permittee may request a temporary authorization for:
    (A) Any Class 2 modification meeting the criteria in paragraph 
(e)(3)(ii) of this section, and
    (B) Any Class 3 modification that meets the criteria in paragraph 
(3)(ii) (A) or (B) of this section; or that meets the criteria in 
paragraphs (3)(ii) (C) through (E) of this section and provides improved 
management or treatment of a hazardous waste already listed in the 
facility permit.
    (ii) The temporary authorization request must include:
    (A) A description of the activities to be conducted under the 
temporary authorization;
    (B) An explanation of why the temporary authorization is necessary; 
and
    (C) Sufficient information to ensure compliance with 40 CFR part 264 
standards.
    (iii) The permittee must send a notice about the temporary 
authorization request to all persons on the facility mailing list 
maintained by the Director and to appropriate units of State and local 
governments as specified in 40 CFR 124.10(c)(ix). This notification must 
be made within seven days of submission of the authorization request.
    (3) The Director shall approve or deny the temporary authorization 
as

[[Page 321]]

quickly as practical. To issue a temporary authorization, the Director 
must find:
    (i) The authorized activities are in compliance with the standards 
of 40 CFR part 264.
    (ii) The temporary authorization is necessary to achieve one of the 
following objectives before action is likely to be taken on a 
modification request:
    (A) To facilitate timely implementation of closure or corrective 
action activities;
    (B) To allow treatment or storage in tanks or containers, or in 
containment buildings in accordance with 40 CFR part 268;
    (C) To prevent disruption of ongoing waste management activities;
    (D) To enable the permittee to respond to sudden changes in the 
types or quantities of the wastes managed under the facility permit; or
    (E) To facilitate other changes to protect human health and the 
environment.
    (4) A temporary authorization may be reissued for one additional 
term of up to 180 days provided that the permittee has requested a Class 
2 or 3 permit modification for the activity covered in the temporary 
authorization, and:
    (i) The reissued temporary authorization constitutes the Director's 
decision on a Class 2 permit modification in accordance with paragraph 
(b)(6)(i)(D) or (ii)(D) of this section, or
    (ii) The Director determines that the reissued temporary 
authorization involving a Class 3 permit modification request is 
warranted to allow the authorized activities to continue while the 
modification procedures of paragraph (c) of this section are conducted.
    (f) Public notice and appeals of permit modification decisions. (1) 
The Director shall notify persons on the facility mailing list and 
appropriate units of State and local government within 10 days of any 
decision under this section to grant or deny a Class 2 or 3 permit 
modification request. The Director shall also notify such persons within 
10 days after an automatic authorization for a Class 2 modification goes 
into effect under Sec. 270.42(b)(6) (iii) or (v).
    (2) The Director's decision to grant or deny a Class 2 or 3 permit 
modification request under this section may be appealed under the permit 
appeal procedures of 40 CFR 124.19.
    (3) An automatic authorization that goes into effect under Sec. 
270.42(b)(6) (iii) or (v) may be appealed under the permit appeal 
procedures of 40 CFR 124.19; however, the permittee may continue to 
conduct the activities pursuant to the automatic authorization until the 
appeal has been granted pursuant to Sec. 124.19(c), notwithstanding the 
provisions of Sec. 124.15(b).
    (g) Newly regulated wastes and units. (1) The permittee is 
authorized to continue to manage wastes listed or identified as 
hazardous under part 261 of this chapter, or to continue to manage 
hazardous waste in units newly regulated as hazardous waste management 
units, if:
    (i) The unit was in existence as a hazardous waste facility with 
respect to the newly listed or characterized waste or newly regulated 
waste management unit on the effective date of the final rule listing or 
identifying the waste, or regulating the unit;
    (ii) The permittee submits a Class 1 modification request on or 
before the date on which the waste or unit becomes subject to the new 
requirements;
    (iii) The permittee is in compliance with the applicable standards 
of 40 CFR parts 265 and 266 of this chapter;
    (iv) The permittee also submits a complete Class 2 or 3 modification 
request within 180 days of the effective date of the rule listing or 
identifying the waste, or subjecting the unit to RCRA Subtitle C 
management standards;
    (v) In the case of land disposal units, the permittee certifies that 
each such unit is in compliance with all applicable requirements of part 
265 of this chapter for groundwater monitoring and financial 
responsibility on the date 12 months after the effective date of the 
rule identifying or listing the waste as hazardous, or regulating the 
unit as a hazardous waste management unit. If the owner or operator 
fails to certify compliance with all these requirements, he or she will 
lose authority to operate under this section.

[[Page 322]]

    (2) New wastes or units added to a facility's permit under this 
subsection do not constitute expansions for the purpose of the 25 
percent capacity expansion limit for Class 2 modifications.
    (h) Military hazardous waste munitions treatment and disposal. The 
permittee is authorized to continue to accept waste military munitions 
notwithstanding any permit conditions barring the permittee from 
accepting off-site wastes, if:
    (1) The facility was in existence as a hazardous waste facility, and 
the facility was already permitted to handle the waste military 
munitions, on the date when the waste military munitions became subject 
to hazardous waste regulatory requirements;
    (2) On or before the date when the waste military munitions become 
subject to hazardous waste regulatory requirements, the permittee 
submits a Class 1 modification request to remove or amend the permit 
provision restricting the receipt of off-site waste munitions; and
    (3) The permittee submits a complete Class 2 modification request 
within 180 days of the date when the waste military munitions became 
subject to hazardous waste regulatory requirements.
    (i) Permit modification list. The Director must maintain a list of 
all approved permit modifications and must publish a notice once a year 
in a State-wide newspaper that an updated list is available for review.
    (j) Combustion facility changes to meet part 63 MACT standards. The 
following procedures apply to hazardous waste combustion facility permit 
modifications requested under Appendix I of this section, section L(9).
    (1) Facility owners or operators must have complied with the 
Notification of Intent to Comply (NIC) requirements of 40 CFR 63.1210 
that were in effect prior to October 11, 2000, (See 40 CFR Part 63 
Revised as of July 1, 2000) in order to request a permit modification 
under this section.
    (2) If the Director does not approve or deny the request within 90 
days of receiving it, the request shall be deemed approved. The Director 
may, at his or her discretion, extend this 90 day deadline one time for 
up to 30 days by notifying the facility owner or operator.

   Appendix I to Sec. 270.42--Classification of Permit Modification
------------------------------------------------------------------------
                         Modifications                            Class
------------------------------------------------------------------------
A. General Permit Provisions
  1. Administrative and informational changes..................        1
  2. Correction of typographical errors........................        1
  3. Equipment replacement or upgrading with functionally              1
   equivalent components (e.g., pipes, valves, pumps,
   conveyors, controls)........................................
  4. Changes in the frequency of or procedures for monitoring,
   reporting, sampling, or maintenance activities by the
   permittee:
    a. To provide for more frequent monitoring, reporting,             1
     sampling, or maintenance..................................
    b. Other changes...........................................        2
  5. Schedule of compliance:
    a. Changes in interim compliance dates, with prior approval    \1\ 1
     of the Director...........................................
    b. Extension of final compliance date......................        3
  6. Changes in expiration date of permit to allow earlier         \1\ 1
   permit termination, with prior approval of the Director.....
  7. Changes in ownership or operational control of a facility,    \1\ 1
   provided the procedures of Sec. 270.40(b) are followed....
  8. Changes to remove permit conditions that are no longer        \1\ 1
   applicable (i.e., because the standards upon which they are
   based are no longer applicable to the facility).............
B. General Facility Standards
  1. Changes to waste sampling or analysis methods:
    a. To conform with agency guidance or regulations..........        1
    b. To incorporate changes associated with F039 (multi-             1
     source leachate) sampling or analysis methods.............
    c. To incorporate changes associated with underlying           \1\ 1
     hazardous constituents in ignitable or corrosive wastes...
    d. Other changes...........................................        2
  2. Changes to analytical quality assurance/control plan:
    a. To conform with agency guidance or regulations..........        1
    b. Other changes...........................................        2
  3. Changes in procedures for maintaining the operating record        1
  4. Changes in frequency or content of inspection schedules...        2
  5. Changes in the training plan:
    a. That affect the type or decrease the amount of training         2
     given to employees........................................
    b. Other changes...........................................        1
  6. Contingency plan:
    a. Changes in emergency procedures (i.e., spill or release         2
     response procedures)......................................
    b. Replacement with functionally equivalent equipment,             1
     upgrade, or relocate emergency equipment listed...........

[[Page 323]]


    c. Removal of equipment from emergency equipment list......        2
    d. Changes in name, address, or phone number of                    1
     coordinators or other persons or agencies identified in
     the plan..................................................
  7. Construction quality assurance plan:
    a. Changes that the CQA officer certifies in the operating         1
     record will provide equivalent or better certainty that
     the unit components meet the design specifications........
    b. Other changes...........................................        2

Note: When a permit modification (such as introduction of a new
   unit) requires a change in facility plans or other general
  facility standards, that change shall be reviewed under the
          same procedures as the permit modification.

C. Ground-Water Protection
  1. Changes to wells:
    a. Changes in the number, location, depth, or design of            2
     upgradient or downgradient wells of permitted ground-water
     monitoring system.........................................
    b. Replacement of an existing well that has been damaged or        1
     rendered inoperable, without change to location, design,
     or depth of the well......................................
  2. Changes in ground-water sampling or analysis procedures or    \1\ 1
   monitoring schedule, with prior approval of the Director....
  3. Changes in statistical procedure for determining whether a    \1\ 1
   statistically significant change in ground-water quality
   between upgradient and downgradient wells has occurred, with
   prior approval of the Director..............................
  4. Changes in point of compliance............................    \1\ 2
  5. Changes in indicator parameters, hazardous constituents,
   or concentration limits (including ACLs):
    a. As specified in the groundwater protection standard.....        3
    b. As specified in the detection monitoring program........        2
  6. Changes to a detection monitoring program as required by          2
   Sec. 264.98(j), unless otherwise specified in this
   appendix....................................................
  7. Compliance monitoring program:
    a. Addition of compliance monitoring program as required by        3
     Sec. Sec. 264.98(h)(4) and 264.99......................
    b. Changes to a compliance monitoring program as required          2
     by Sec. 264.99(k), unless otherwise specified in this
     appendix..................................................
  8. Corrective action program:
    a. Addition of a corrective action program as required by          3
     Sec. Sec. 264.99(i)(2) and 264.100.....................
    b. Changes to a corrective action program as required by           2
     Sec. 264.100(h), unless otherwise specified in this
     appendix..................................................
D. Closure
  1. Changes to the closure plan:
    a. Changes in estimate of maximum extent of operations or      \1\ 1
     maximum inventory of waste on-site at any time during the
     active life of the facility, with prior approval of the
     Director..................................................
    b. Changes in the closure schedule for any unit, changes in    \1\ 1
     the final closure schedule for the facility, or extension
     of the closure period, with prior approval of the Director
    c. Changes in the expected year of final closure, where        \1\ 1
     other permit conditions are not changed, with prior
     approval of the Director..................................
    d. Changes in procedures for decontamination of facility       \1\ 1
     equipment or structures, with prior approval of the
     Director..................................................
    e. Changes in approved closure plan resulting from                 2
     unexpected events occurring during partial or final
     closure, unless otherwise specified in this appendix......
    f. Extension of the closure period to allow a landfill,            2
     surface impoundment or land treatment unit to receive non-
     hazardous wastes after final receipt of hazardous wastes
     under Sec. 264.113 (d) and (e)..........................
  2. Creation of a new landfill unit as part of closure........        3
  3. Addition of the following new units to be used temporarily
   for closure activities:
    a. Surface impoundments....................................        3
    b. Incinerators............................................        3
    c. Waste piles that do not comply with Sec. 264.250(c)...        3
    d. Waste piles that comply with Sec. 264.250(c)..........        2
    e. Tanks or containers (other than specified below)........        2
    f. Tanks used for neutralization, dewatering, phase            \1\ 1
     separation, or component separation, with prior approval
     of the Director...........................................
    g. Staging piles...........................................        2
E. Post-Closure
  1. Changes in name, address, or phone number of contact in           1
   post-closure plan...........................................
  2. Extension of post-closure care period.....................        2
  3. Reduction in the post-closure care period.................        3
  4. Changes to the expected year of final closure, where other        1
   permit conditions are not changed...........................
  5. Changes in post-closure plan necessitated by events               2
   occurring during the active life of the facility, including
   partial and final closure...................................
F. Containers
  1. Modification or addition of container units:
    a. Resulting in greater than 25% increase in the facility's        3
     container storage capacity, except as provided in F(1)(c)
     and F(4)(a) below.........................................
    b. Resulting in up to 25% increase in the facility's               2
     container storage capacity, except as provided in F(1)(c)
     and F(4)(a) below.........................................

[[Page 324]]


    c. Or treatment processes necessary to treat wastes that       \1\ 1
     are restricted from land disposal to meet some or all of
     the applicable treatment standards or to treat wastes to
     satisfy (in whole or in part) the standard of ``use of
     practically available technology that yields the greatest
     environmental benefit'' contained in Sec.
     268.8(a)(2)(ii), with prior approval of the Director. This
     modification may also involve addition of new waste codes
     or narrative descriptions of wastes. It is not applicable
     to dioxin-containing wastes (F020, 021, 022, 023, 026,
     027, and 028).............................................
  2:
    a. Modification of a container unit without increasing the         2
     capacity of the unit......................................
    b. Addition of a roof to a container unit without                  1
     alteration of the containment system......................
  3. Storage of different wastes in containers, except as
   provided in (F)(4) below:
    a. That require additional or different management                 3
     practices from those authorized in the permit.............
    b. That do not require additional or different management          2
     practices from those authorized in the permit.............
Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes.

  4. Storage of treatment of different wastes in containers:
    a. That require addition of units or change in treatment           1
     process or management standards, provided that the wastes
     are restricted from land disposal and are to be treated to
     meet some or all of the applicable treatment standards, or
     that are to be treated to satisfy (in whole or in part)
     the standard of ``use of practically available technology
     that yields the greatest environmental benefit'' contained
     in Sec. 268.8(a)(2)(ii). This modification is not
     applicable to dioxin-containing wastes (F020, 021, 022,
     023, 026, 027, and 028)...................................
    b. That do not require the addition of units or a change in    \1\ 1
     the treatment process or management standards, and
     provided that the units have previously received wastes of
     the same type (e.g., incinerator scrubber water). This
     modification is not applicable to dioxin-containing wastes
     (F020, 021, 022, 023, 026, 027, and 028)..................
G. Tanks
  1:
    a. Modification or addition of tank units resulting in             3
     greater than 25% increase in the facility's tank capacity,
     except as provided in G(1)(c), G(1)(d), and G(1)(e) below.
    b. Modification or addition of tank units resulting in up          2
     to 25% increase in the facility's tank capacity, except as
     provided in G(1)(d) and G(1)(e) below.....................
    c. Addition of a new tank that will operate for more than          2
     90 days using any of the following physical or chemical
     treatment technologies: neutralization, dewatering, phase
     separation, or component separation.......................
    d. After prior approval of the Director, addition of a new     \1\ 1
     tank that will operate for up to 90 days using any of the
     following physical or chemical treatment technologies:
     neutralization, dewatering, phase separation, or component
     separation................................................
    e. Modification or addition of tank units or treatment         \1\ 1
     processes necessary to treat wastes that are restricted
     from land disposal to meet some or all of the applicable
     treatment standards or to treat wastes to satisfy (in
     whole or in part) the standard of ``use of practically
     available technology that yields the greatest
     environmental benefit'' contained in Sec.
     268.8(a)(2)(ii), with prior approval of the Director. This
     modification may also involve addition of new waste codes.
     It is not applicable to dioxin-containing wastes (F020,
     021, 022, 023, 026, 027, and 028).........................
  2. Modification of a tank unit or secondary containment              2
   system without increasing the capacity of the unit..........
  3. Replacement of a tank with a tank that meets the same             1
   design standards and has a capacity within 10% of the replaced tank provided....................
    --The capacity difference is no more than 1500 gallons,
    --The facility's permitted tank capacity is not increased,
     and
    --The replacement tank meets the same conditions in the
     permit.
  4. Modification of a tank management practice................        2
  5. Management of different wastes in tanks:
    a. That require additional or different management                 3
     practices, tank design, different fire protection
     specifications, or significantly different tank treatment
     process from that authorized in the permit, except as
     provided in (G)(5)(c) below...............................
    b. That do not require additional or different management          2
     practices, tank design, different fire protection
     specifications, or significantly different tank treatment
     process than authorized in the permit, except as provided
     in (G)(5)(d)..............................................
    c. That require addition of units or change in treatment       \1\ 1
     processes or management standards, provided that the
     wastes are restricted from land disposal and are to be
     treated to meet some or all of the applicable treatment
     standards or that are to be treated to satisfy (in whole
     or in part) the standard of ``use of prac tically
     available technology that yields the greatest environ
     mental benefit'' contained in Sec. 268.8(a)(2)(ii). The
     modification is not applicable to dioxin-containing wastes
     (F020, 021, 022, 023, 026, 027, and 028)..................
    d. That do not require the addition of units or a change in        1
     the treatment process or management standards, and
     provided that the units have previously received wastes of
     the same type (e.g., incinerator scrubber water). This
     modification is not applicable to dioxin-containing wastes
     (F020, 021, 022, 023, 026, 027, and 028)..................
Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly lilsted or identified wastes.

H. Surface Impoundments
  1. Modification or addition of surface impoundment units that        3
   result in increasing the facility's surface impoundment
   storage or treatment capacity...............................
  2. Replacement of a surface impoundment unit.................        3
  3. Modification of a surface impoundment unit without                2
   increasing the facility's surface impoundment storage or
   treatment capacity and without modifying the unit's liner,
   leak detection system, or leachate collection system........
  4. Modification of a surface impoundment management practice.        2

[[Page 325]]


  5. Treatment, storage, or disposal of different wastes in
   surface impoundments:
    a. That require additional or different management                 3
     practices or different design of the liner or leak
     detection system than authorized in the permit............
    b. That do not require additional or different management          2
     practices or different design of the liner or leak
     detection system than authorized in the permit............
    c. That are wastes restricted from land disposal that meet         1
     the applicable treatment standards or that are treated to
     satisfy the standard of ``use of practically available
     technology that yields the greatest environmental
     benefit'' contained in Sec. 269.8(a)(2)(ii), and
     provided that the unit meets the minimum technological
     requirements stated in Sec. 268.5(h)(2). This
     modification is not applicable to dioxin-containing wastes
     (F020, 021, 022, 023, 026, 027, and 028)..................
    d. That are residues from wastewater treatment or                  1
     incineration, provided that disposal occurs in a unit that
     meets the minimum techno logical requirements stated in
     Sec. 268.5(h)(2), and provided further that the surface
     impoundment has previously received wastes of the same
     type (for example, incinerator scrubber water). This
     modification is not applicable to dioxin-containing wastes
     (F020, 021, 022, 023, 026, 027, and 028)..................
  6. Modifications of unconstructed units to comply with Sec. *1
   Sec. 264.221(c), 264.222, 264.223, and 264.226(d).........
  7. Changes in response action plan:
    a. Increase in action leakage rate.........................        3
    b. Change in a specific response reducing its frequency or         3
     effectiveness.............................................
    c. Other changes...........................................        2

Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes

I. Enclosed Waste Piles. For all waste piles except those
 complying with Sec. 264.250(c), modifications are treated
 the same as for a landfill. The following modifications are
 applicable only to waste piles complying with Sec.
 264.250(c).
  1. Modification or addition of waste pile units:
    a. Resulting in greater than 25% increase in the facility's        3
     waste pile storage or treatment capacity..................
    b. Resulting in up to 25% increase in the facility's waste         2
     pile storage or treatment capacity........................
  2. Modification of waste pile unit without increasing the            2
   capacity of the unit........................................
  3. Replacement of a waste pile unit with another waste pile          1
   unit of the same design and capacity and meeting all waste
   pile conditions in the permit...............................
  4. Modification of a waste pile management practice..........        2
  5. Storage or treatment of different wastes in waste piles:
    a. That require additional or different management                 3
     practices or different design of the unit.................
    b. That do not require additional or different management          2
     practices or different design of the unit.................
  6. Conversion of an enclosed waste pile to a containment             2
   building unit...............................................

Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes.

J. Landfills and Unenclosed Waste Piles
  1. Modification or addition of landfill units that result in         3
   increasing the facility's disposal capacity.................
  2. Replacement of a landfill.................................        3
  3. Addition or modification of a liner, leachate collection          3
   system, leachate detection system, run-off control, or final
   cover system................................................
  4. Modification of a landfill unit without changing a liner,         2
   leachate collection system, leachate detection system, run-
   off control, or final cover system..........................
  5. Modification of a landfill management practice............        2
  6. Landfill different wastes:
    a. That require additional or different management                 3
     practices, different design of the liner, leachate
     collection system, or leachate detection system...........
    b. That do not require additional or different management          2
     practices, different design of the liner, leachate
     collection system, or leachate detection system...........
    c. That are wastes restricted from land disposal that meet         1
     the applicable treatment standards or that are treated to
     satisfy the standard of ``use of practically available
     technology that yields the greatest environmental
     benefit'' contained in Sec. 268.8(a)(2)(ii), and
     provided that the landfill unit meets the minimum
     technological requirements stated in Sec. 268.5(h)(2).
     This modification is not applicable to dioxin-containing
     wastes (F020, 021, 022, 023, 026, 027, and 028)...........
    d. That are residues from wastewater treatment or                  1
     incineration, provided that disposal occurs in a landfill
     unit that meets the minimum technological requirements
     stated in Sec. 268.5(h)(2), and provided further that the
     landfill has previously received wastes of the same type
     (for example, incinerator ash). This modification is not
     applicable to dioxin-containing wastes (F020, 021, 022,
     023, 026, 027, and 028)...................................
  7. Modifications of unconstructed units to comply with Sec. *1
   Sec. 264.251(c), 264.252, 264.253, 264.254(c), 264.301(c),
   264.302, 264.303(c), and 264.304............................
  8. Changes in response action plan:
    a. Increase in action leakage rate.........................        3
    b. Change in a specific response reducing its frequency or         3
     effectiveness.............................................
    c. Other changes...........................................        2

Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes.

K. Land Treatment
  1. Lateral expansion of or other modification of a land              3
   treatment unit to increase areal extent.....................
  2. Modification of run-on control system.....................        2
  3. Modify run-off control system.............................        3
  4. Other modifications of land treatment unit component              2
   specifications or standards required in permit..............
  5. Management of different wastes in land treatment units:
    a. That require a change in permit operating conditions or         3
     unit design specifications................................

[[Page 326]]


    b. That do not require a change in permit operating                2
     conditions or unit design specifications..................

Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes
  6. Modification of a land treatment unit management practice
   to:
    a. Increase rate or change method of waste application.....        3
    b. Decrease rate of waste application......................        1
  7. Modification of a land treatment unit management practice         2
   to change measures of pH or moisture content, or to enhance
   microbial or chemical reactions.............................
  8. Modification of a land treatment unit management practice         3
   to grow food chain crops, to add to or replace existing
   permitted crops with different food chain crops, or to
   modify operating plans for distribution of animal feeds
   resulting from such crops...................................
  9. Modification of operating practice due to detection of            3
   releases from the land treatment unit pursuant to Sec.
   264.278(g)(2)...............................................
  10. Changes in the unsaturated zone monitoring system,               3
   resulting in a change to the location, depth, number of
   sampling points, or replace unsaturated zone monitoring
   devices or components of devices with devices or components
   that have specifications different from permit requirements.
  11. Changes in the unsaturated zone monitoring system that do        2
   not result in a change to the location, depth, number of
   sampling points, or that replace unsaturated zone monitoring
   devices or components of devices with devices or components
   having specifications different from permit requirements....
  12. Changes in background values for hazardous constituents          2
   in soil and soil-pore liquid................................
  13. Changes in sampling, analysis, or statistical procedure..        2
  14. Changes in land treatment demonstration program prior to         2
   or during the demonstration.................................
  15. Changes in any condition specified in the permit for a       \1\ 1
   land treatment unit to reflect results of the land treatment
   demonstration, provided performance standards are met, and
   the Director's prior approval has been received.............
  16. Changes to allow a second land treatment demonstration to    \1\ 1
   be conducted when the results of the first demonstration
   have not shown the conditions under which the wastes can be
   treated completely, provided the conditions for the second
   demonstration are substantially the same as the conditions
   for the first demonstration and have received the prior
   approval of the Director....................................
  17. Changes to allow a second land treatment demonstration to        3
   be conducted when the results of the first demonstration
   have not shown the conditions under which the wastes can be
   treated completely, where the conditions for the second
   demonstration are not substantially the same as the
   conditions for the first demonstration......................
  18. Changes in vegetative cover requirements for closure.....        2
L. Incinerators, Boilers, and Industrial Furnaces:
  1. Changes to increase by more than 25% any of the following         3
   limits authorized in the permit: A thermal feed rate limit,
   a feedstream feed rate limit, a chlorine/chloride feed rate
   limit, a metal feed rate limit, or an ash feed rate limit.
   The Director will require a new trial burn to substantiate
   compliance with the regulatory performance standards unless
   this demonstration can be made through other means..........
  2. Changes to increase by up to 25% any of the following             2
   limits authorized in the permit: A thermal feed rate limit,
   a feedstream feed rate limit, a chlorine/chloride feed rate
   limit, a metal feed rate limit, or an ash feed rate limit.
   The Director will require a new trial burn to substantiate
   compliance with the regulatory performance standards unless
   this demonstration can be made through other means..........
  3. Modification of an incinerator, boiler, or industrial             3
   furnace unit by changing the internal size or geometry of
   the primary or secondary combustion units, by adding a
   primary or secondary combustion unit, by substantially
   changing the design of any component used to remove HCl/Cl2,
   metals, or particulate from the combustion gases, or by
   changing other features of the incinerator, boiler, or
   industrial furnace that could affect its capability to meet
   the regulatory performance standards. The Director will
   require a new trial burn to substantiate compliance with the
   regulatory performance standards unless this demonstration
   can be made through other means.............................
  4. Modification of an incinerator, boiler, or industrial             2
   furnace unit in a manner that would not likely affect the
   capability of the unit to meet the regulatory performance
   standards but which would change the operating conditions or
   monitoring requirements specified in the permit. The
   Director may require a new trial burn to demonstrate
   compliance with the regulatory performance standards........
  5. Operating requirements:...................................
    a. Modification of the limits specified in the permit for          3
     minimum or maximum combustion gas temperature, minimum
     combustion gas residence time, oxygen concentration in the
     secondary combustion chamber, flue gas carbon monoxide and
     hydrocarbon concentration, maximum temperature at the
     inlet to the particulate matter emission control system,
     or operating parameters for the air pollution control
     system. The Director will require a new trial burn to
     substantiate compliance with the regulatory performance
     standards unless this demonstration can be made through
     other means...............................................
    b. Modification of any stack gas emission limits specified         3
     in the permit, or modification of any conditions in the
     permit concerning emergency shutdown or automatic waste
     feed cutoff procedures or controls........................
    c. Modification of any other operating condition or any            2
     inspection or recordkeeping requirement specified in the
     permit....................................................
  6. Burning different wastes:.................................
    a. If the waste contains a POHC that is more difficult to          3
     burn than authorized by the permit or if burning of the
     waste requires compliance with different regulatory
     performance standards than specified in the permit. The
     Director will require a new trial burn to substantiate
     compliance with the regulatory performance standards
     unless this demonstration can be made through other means.
    b. If the waste does not contain a POHC that is more               2
     difficult to burn than authorized by the permit and if
     burning of the waste does not require compliance with
     different regulatory performance standards than specified
     in the permit.............................................

[[Page 327]]


Note: See Sec. 270.42(g) for modification procedures to be
 used for the management of newly listed or identified wastes

  7. Shakedown and trial burn:
    a. Modification of the trial burn plan or any of the permit        2
     conditions applicable during the shakedown period for
     determining operational readiness after construction, the
     trial burn period, or the period immediately following the
     trial burn................................................
    b. Authorization of up to an additional 720 hours of waste      \1\1
     burning during the shakedown period for determining
     operational readiness after construction, with the prior
     approval of the Director..................................
    c. Changes in the operating requirements set in the permit      \1\1
     for conducting a trial burn, provided the change is minor
     and has received the prior approval of the Director.......
    d. Changes in the ranges of the operating requirements set      \1\1
     in the permit to reflect the results of the trial burn,
     provided the change is minor and has received the prior
     approval of the Director..................................
  8. Substitution of an alternative type of nonhazardous waste         1
   fuel that is not specified in the permit....................
  9. Technology Changes Needed to meet Standards under 40 CFR      \1\ 1
   part 63 (Subpart EEE--National Emission Standards for
   Hazardous Air Pollutants From Hazardous Waste Combustors),
   provided the procedures of Sec. 270.42(j) are followed.
M. Containment Buildings.
1. Modification or addition of containment building units:
  a. Resulting in greater than 25% increase in the facility's          3
   containment building storage or treatment capacity..........
  b. Resulting in up to 25% increase in the facility's                 2
   containment building storage or treatment capacity..........
2. Modification of a containment building unit or secondary            2
 containment system without increasing the capacity of the unit
3. Replacement of a containment building with a containment
 building that meets the same design standards provided:
  a. The unit capacity is not increased........................        1
  b. The replacement containment building meets the same               1
   conditions in the permit....................................
4. Modification of a containment building management practice..        2
5. Storage or treatment of different wastes in containment
 buildings:
  a. That require additional or different management practices.        3
  b. That do not require additional or different management            2
   practices...................................................
N. Corrective Action:
  1. Approval of a corrective action management unit pursuant          3
   to Sec. 264.552...........................................
  2. Approval of a temporary unit or time extension for a              2
   temporary unit pursuant to Sec. 264.553...................
  3. Approval of a staging pile or staging pile operating term         2
   extension pursuant to Sec. 264.554........................
------------------------------------------------------------------------
\1\ Class 1 modifications requiring prior Agency approval.


[53 FR 37936, Sept. 28, 1988]