                   TITLE 40--PROTECTION OF ENVIRONMENT

 

         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

 

PART 63_NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR 

SOURCE CATEGORIES--Table of Contents

 

 Subpart AAAAA_National Emission Standards for Hazardous Air Pollutants 

                      for Lime Manufacturing Plants

 

Sec. 63.7082  What parts of my plant does this subpart cover?



    (a) This subpart applies to each existing or new lime kiln(s) and 

their associated cooler(s), and processed stone handling (PSH) 

operations system(s) located at an LMP that is a major source.



[[Page 39]]



    (b) A new lime kiln is a lime kiln, and (if applicable) its 

associated lime cooler, for which construction or reconstruction began 

after December 20, 2002, if you met the applicability criteria in Sec. 

63.7081 at the time you began construction or reconstruction.

    (c) A new PSH operations system is the equipment in paragraph (g) of 

this section, for which construction or reconstruction began after 

December 20, 2002, if you met the applicability criteria in Sec. 

63.7081 at the time you began construction or reconstruction.

    (d) A lime kiln or PSH operations system is reconstructed if it 

meets the criteria for reconstruction defined in Sec. 63.2.

    (e) An existing lime kiln is any lime kiln, and (if applicable) its 

associated lime cooler, that does not meet the definition of a new kiln 

of paragraph (b) of this section.

    (f) An existing PSH operations system is any PHS operations system 

that does not meet the definition of a new PSH operations system in 

paragraph (c) of this section.

    (g) A PSH operations system includes all equipment associated with 

PSH operations beginning at the processed stone storage bin(s) or open 

storage pile(s) and ending where the processed stone is fed into the 

kiln. It includes man-made processed stone storage bins (but not open 

processed stone storage piles), conveying system transfer points, bulk 

loading or unloading systems, screening operations, surge bins, bucket 

elevators, and belt conveyors. No other materials processing operations 

are subject to this subpart.

    (h) Nuisance dust collectors on lime coolers are part of the lime 

materials processing operations and are not covered by this subpart.

    (i) Lime hydrators are not subject to this subpart.

    (j) Open material storage piles are not subject to this subpart.