                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 65_CONSOLIDATED FEDERAL AIR RULE--Table of Contents
 
                        Subpart E_Transfer Racks
 
Sec. 65.82  Design requirements.

    (a) The owner or operator shall equip each transfer rack with either 
one of the following equipment:
    (1) A closed vent system which routes the regulated material vapors 
to a control device as provided in Sec. 65.83(a)(1) and (2).
    (2) Process piping which routes the regulated material vapors to a 
process or a fuel gas system as provided in Sec. 65.83(a)(4), or to a 
vapor balance system as provided in Sec. 65.83(a)(3).
    (b) Each closed vent system shall be designed to collect the 
regulated material displaced from tank trucks or railcars during loading 
and to route the collected regulated material to a control device as 
provided in Sec. 65.83(a)(1) and (2).
    (c) Process piping shall be designed to collect the regulated 
material displaced from tank trucks or railcars during loading and to 
route the collected regulated material vapors to a process or a fuel gas 
system as provided in Sec. 65.83(a)(4), or to a vapor balance system as 
provided in Sec. 65.83(a)(3).
    (d) Each closed vent system shall meet the applicable requirements 
of Sec. 65.143.
    (e) If the collected regulated material vapors are routed to a 
process or a fuel gas system as provided in Sec. 65.83(a)(4), then each 
owner or operator shall meet the applicable requirements of Sec. 
65.142(c).