Sec. 60.5  Flood plain management criteria for flood-related 

erosion-prone areas.



    The Administrator will provide the data upon which flood plain 

management regulations for flood-related erosion-prone areas shall be 

based. If the Administrator has not provided sufficient data to furnish 

a basis for these regulations in a particular community, the community 

shall obtain, review, and reasonably utilize data available from other 

Federal, State or other sources, pending receipt of data from the 

Administrator. However, when special flood-related erosion hazard area 

designations have been furnished by the Administrator they shall apply. 

The symbols defining such special flood-related erosion hazard 

designations are set forth in Sec. 64.3 of this subchapter. In all 

cases the minimum requirements governing the adequacy of the flood plain 

management regulations for flood-related erosion-prone areas adopted by 

a particular community depend on the amount of technical data provided 

to the community by the Administrator. Minimum standards for communities 

are as follows:

    (a) When the Administrator has not yet identified any area within 

the community as having special flood-related erosion hazards, but the 

community has indicated the presence of such hazards by submitting an 

application to participate in the Program, the community shall

    (1) Require the issuance of a permit for all proposed construction, 

or other development in the area of flood-related erosion hazard, as it 

is known to the community;

    (2) Require review of each permit application to determine whether 

the proposed site alterations and improvements will be reasonably safe 

from flood-related erosion and will not cause flood-related erosion 

hazards or otherwise aggravate the existing flood-related erosion 

hazard; and

    (3) If a proposed improvement is found to be in the path of flood-

related erosion or to increase the erosion hazard, require the 

improvement to be relocated or adequate protective measures to be taken 

which will not aggravate the existing erosion hazard.

    (b) When the Administrator has delineated Zone E on the community's 

FIRM, the community shall

    (1) Meet the requirements of paragraph (a) of this section; and

    (2) Require a setback for all new development from the ocean, lake, 

bay, riverfront or other body of water, to create a safety buffer 

consisting of a natural vegetative or contour strip. This buffer will be 

designated by the Administrator according to the flood-related erosion 

hazard and erosion



[[Page 260]]



rate, in conjunction with the anticipated ``useful life'' of structures, 

and depending upon the geologic, hydrologic, topographic and climatic 

characteristics of the community's land. The buffer may be used for 

suitable open space purposes, such as for agricultural, forestry, 

outdoor recreation and wildlife habitat areas, and for other activities 

using temporary and portable structures only.



[41 FR 46975, Oct. 26, 1976. Redesignated at 44 FR 31177, May 31, 1979, 

as amended at 48 FR 44552, Sept. 29, 1983; 49 FR 4751, Feb. 8, 1984]