              TITLE 44--EMERGENCY MANAGEMENT AND ASSISTANCE

 

 CHAPTER I--FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND 

                                SECURITY

 

PART 70_PROCEDURE FOR MAP CORRECTION--Table of Contents

 

Sec. 70.4  Review by the Director.



    The Director, after reviewing the scientific or technical 

information submitted under the provisions of Sec. 70.3, shall notify 

the applicant in writing of his/her determination within 60 days after 

we receive the applicant's scientific or technical information that we 

have compared either the ground elevations of an entire legally defined 

parcel of land or the elevation of the lowest adjacent grade to a 

structure with the elevation of the base flood and that:

    (a) The property is within a designated A, A0, A1-30, AE, AH, A99, 

AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, V0, V1-30, VE, or V Zone, and 

will state the basis of such determination; or

    (b) The property should not be within a designated A, A0, A1-30, AE, 

AH, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A,V0, V1-30, VE, or V 

Zone and that we will modify the FHBM or FIRM accordingly; or

    (c) The property is not within a designated A, A0, A1-30, AE, AH, 

A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A,V0, V1-30, VE, or V Zone as 

shown on the FHBM or FIRM and no modification of the FHBM or FIRM is 

necessary; or

    (d) We need an additional 60 days to make a determination.



[66 FR 33900, June 26, 2001]