[Code of Federal Regulations]

[Title 49, Volume 4]

[Revised as of October 1, 2005]

From the U.S. Government Printing Office via GPO Access

[CITE: 49CFR230.1]



[Page 414-416]

 

                        TITLE 49--TRANSPORTATION

 

       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 

                             TRANSPORTATION

 

PART 230_STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS--Table 

of Contents

 

                            Subpart A_General

 

Sec. 230.1  Purpose and scope.









                            Subpart A_General



Sec.

230.1 Purpose and scope.

230.2 Applicability.

230.3 Implementation.

230.4 Penalties.

230.5 Preemptive effect.

230.6 Waivers.

230.7 Responsibility for compliance.

230.8 Definitions.

230.9 Information collection.

230.10 [Reserved]



                     General Inspection Requirements



230.11 Repair of non-complying conditions.

230.12 Movement of non-complying steam locomotives.

230.13 Daily inspection.

230.14 Thirty-one (31) service day inspection.

230.15 Ninety-two (92) service day inspection.



[[Page 415]]



230.16 Annual inspection.

230.17 One thousand four hundred seventy-two (1472) service day 

          inspection.



                       Recordkeeping Requirements



230.18 Service days.

230.19 Posting of FRA Form No. 1 and FRA Form No. 3.

230.20 Alteration and repair report for steam locomotive boilers.

230.21 Steam locomotive number change.

230.22 Accident reports.



                   Subpart B_Boilers and Appurtenances



230.23 Responsibility for general construction and safe working 

          pressure.



                            Allowable Stress



230.24 Maximum allowable stress.

230.25 Maximum allowable stress on stays and braces.



                          Strength of Materials



230.26 Tensile strength of shell plates.

230.27 Maximum shearing strength of rivets.

230.28 Higher shearing strength of rivets.



                          Inspection and Repair



230.29 Inspection and repair.

230.30 Lap-joint seam boilers.

230.31 Flues to be removed.

230.32 Time and method of inspection.

230.33 Welded repairs and alterations.

230.34 Riveted repairs and alterations.



                       Pressure Testing of Boilers



230.35 Pressure testing.

230.36 Hydrostatic testing of boilers.

230.37 Steam test following repairs or alterations.



                                Staybolts



230.38 Telltale holes.

230.39 Broken staybolts.

230.40 Time and method of staybolt testing.

230.41 Flexible staybolts with caps.



                              Steam Gauges



230.42 Location of gauges.

230.43 Gauge siphon.

230.44 Time of testing.

230.45 Method of testing.

230.46 Badge plates.

230.47 Boiler number.



                          Safety Relief Valves



230.48 Number and capacity.

230.49 Setting of safety relief valves.

230.50 Time of testing.



                      Water Glasses and Gauge Cocks



230.51 Number and location.

230.52 Water glass valves.

230.53 Time of cleaning.

230.54 Testing and maintenance.

230.55 Tubular type water and lubricator glasses and shields.

230.56 Water glass lamps.



               Injectors, Feedwater Pumps, and Flue Plugs



230.57 Injectors and feedwater pumps.

230.58 Flue plugs.



                              Fusible Plugs



230.59 Fusible plugs.



                             Washing Boilers



230.60 Time of washing.

230.61 Arch tubes, water bar tubes, circulators and thermic siphons.



                               Steam Pipes



230.62 Dry pipe.

230.63 Smoke box, steam pipes and pressure parts.



                               Steam Leaks



230.64 Leaks under lagging.

230.65 Steam blocking view of engine crew.



                 Subpart C_Steam Locomotives and Tenders



230.66 Design, construction, and maintenance.

230.67 Responsibility for inspection and repairs.



                            Speed Indicators



230.68 Speed indicators.



                                Ash Pans



230.69 Ash pans.



                       Brake and Signal Equipment



230.70 Safe condition.

230.71 Orifice testing of compressors.

230.72 Testing main reservoirs.

230.73 Air gauges.

230.74 Time of cleaning.

230.75 Stenciling dates of tests and cleaning.

230.76 Piston travel.

230.77 Foundation brake gear.

230.78 Leakage.

230.79 Train signal system.



                Cabs, Warning Signals, Sanders and Lights



230.80 Cabs.

230.81 Cab aprons.

230.82 Fire doors.

230.83 Cylinder cocks.

230.84 Sanders.

230.85 Audible warning device.

230.86 Required illumination.

230.87 Cab lights.



[[Page 416]]



                      Throttles and Reversing Gear



230.88 Throttles.

230.89 Reverse gear.



                       Draw Gear and Draft Systems



230.90 Draw gear between locomotive and tender.

230.91 Chafing irons.

230.92 Draw gear and draft systems.



                              Driving Gear



230.93 Pistons and piston rods.

230.94 Crossheads.

230.95 Guides.

230.96 Main, side, and valve motion rods.

230.97 Crank pins.



                              Running Gear



230.98 Driving, trailing, and engine truck axles.

230.99 Tender truck axles.

230.100 Defects in tender truck axles and journals.

230.101 Steam locomotive driving journal boxes.

230.102 Tender plain bearing journal boxes.

230.103 Tender roller bearing journal boxes.

230.104 Driving box shoes and wedges.

230.105 Lateral motion.



                  Trucks, Frames and Equalizing System



230.106 Steam locomotive frame.

230.107 Tender frame and body.

230.108 Steam locomotive leading and trailing trucks.

230.109 Tender trucks.

230.110 Pilots.

230.111 Spring rigging.



                            Wheels and Tires



230.112 Wheels and tires.

230.113 Wheels and tire defects.

230.114 Wheel centers.



                         Steam Locomotive Tanks



230.115 Feed water tanks.

230.116 Oil tanks.



Appendix A to Part 230--Inspection Requirements

Appendix B to Part 230--Diagrams and Drawings

Appendix C to Part 230--FRA Inspection Forms

Appendix D to Part 230--Civil Penalty Schedule



    Authority: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461, note; and 

49 CFR 1.49.



    Source: 64 FR 62865, Nov. 17, 1999, unless otherwise noted.







    This part prescribes minimum Federal safety standards for all steam-

propelled locomotives operated on railroads to which this part applies. 

This part does not restrict a railroad from adopting and enforcing 

additional or more stringent requirements not inconsistent with this 

part.