[Code of Federal Regulations]

[Title 49, Volume 4]

[Revised as of October 1, 2005]

From the U.S. Government Printing Office via GPO Access

[CITE: 49CFR234.1]



[Page 568-569]

 

                        TITLE 49--TRANSPORTATION

 

       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 

                             TRANSPORTATION

 

PART 234_GRADE CROSSING SIGNAL SYSTEM SAFETY--Table of Contents

 

                            Subpart A_General

 

Sec. 234.1  Scope.









                            Subpart A_General



Sec.

234.1 Scope.

234.3 Application.

234.4 Preemptive effect.

234.5 Definitions.

234.6 Penalties.



                            Subpart B_Reports



234.7 Accidents involving grade crossing signal failure.

234.9 Grade crossing signal system failure reports.



       Subpart C_Response to Reports of Warning System Malfunction



234.101 Employee notification rules.

234.103 Timely response to report of malfunction.

234.105 Activation failure.

234.106 Partial activation.

234.107 False activation.

234.109 Recordkeeping.



             Subpart D_Maintenance, Inspection, and Testing



                          Maintenance Standards



234.201 Location of plans.

234.203 Control circuits.

234.205 Operating characteristics of warning system apparatus.

234.207 Adjustment, repair, or replacement of component.

234.209 Interference with normal functioning of system.

234.211 Security of warning system apparatus.

234.213 Grounds.

234.215 Standby power system.

234.217 Flashing light units.

234.219 Gate arm lights and light cable.

234.221 Lamp voltage.

234.223 Gate arm.

234.225 Activation of warning system.

234.227 Train detection apparatus.

234.229 Shunting sensitivity.

234.231 Fouling wires.

234.233 Rail joints.

234.235 Insulated rail joints.

234.237 Reverse switch cut-out circuit.

234.239 Tagging of wires and interference of wires or tags with signal 

          apparatus.

234.241 Protection of insulated wire; splice in underground wire.

234.243 Wire on pole line and aerial cable.

234.245 Signs.



                          Inspections and Tests



234.247 Purpose of inspections and tests; removal from service of relay 

          or device failing to meet test requirements.

234.249 Ground tests.

234.251 Standby power.

234.253 Flashing light units and lamp voltage.

234.255 Gate arm and gate mechanism.

234.257 Warning system operation.

234.259 Warning time.

234.261 Highway traffic signal pre-emption.

234.263 Relays.

234.265 Timing relays and timing devices.

234.267 Insulation resistance tests, wires in trunking and cables.

234.269 Cut-out circuits.

234.271 Insulated rail joints, bond wires, and track connections.

234.273 Results of inspections and tests.



[[Page 569]]



                Requirements for Processor-Based Systems



234.275 Processor-based systems.



Appendix A to Part 234--Schedule of Civil Penalties

Appendix B to Part 234--Alternate Methods of Protection Under 49 CFR 

          234.105(c), 234.106, and 234.107(c).



    Authority: 49 U.S.C. 20103, 20107, and 49 CFR 1.49.



    Authority: 49 U.S.C. 20103, 20107; 28 U.S.C. 2461, note; and 49 CFR 

1.49.



    Source: 61 FR 31806, June 20, 1996, unless otherwise noted.







    This part imposes minimum maintenance, inspection, and testing 

standards for highway-rail grade crossing warning systems. This part 

also prescribes standards for the reporting of failures of such systems 

and prescribes minimum actions railroads must take when such warning 

systems malfunction. This part does not restrict a railroad from 

adopting and enforcing additional or more stringent requirements not 

inconsistent with this part.