[Code of Federal Regulations] [Title 49, Volume 4] [Revised as of October 1, 2005] From the U.S. Government Printing Office via GPO Access [CITE: 49CFR234.273] [Page 577] TITLE 49--TRANSPORTATION CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PART 234_GRADE CROSSING SIGNAL SYSTEM SAFETY--Table of Contents Subpart D_Maintenance, Inspection, and Testing Sec. 234.273 Results of inspections and tests. (a) Results of inspections and tests made in compliance with this part shall be recorded on forms provided by the railroad, or by electronic means, subject to approval by the Associate Administrator for Safety. Each record shall show the name of the railroad, AAR/DOT inventory number, place and date, equipment tested, results of tests, repairs, replacements, adjustments made, and condition in which the apparatus was left. (b) Each record shall be signed or electronically coded by the employee making the test and shall be filed in the office of a supervisory official having jurisdiction. Records required to be kept shall be made available to FRA as provided by 49 U.S.C. 20107 (formerly Sec. 208 of the Federal Railroad Safety Act of 1970 (45 U.S.C. 437)). (c) Each record shall be retained until the next record for that test is filed but in no case for less than one year from the date of the test. Requirements for Processor-Based Systems