[Code of Federal Regulations]

[Title 49, Volume 4]

[Revised as of October 1, 2005]

From the U.S. Government Printing Office via GPO Access

[CITE: 49CFR239.303]



[Page 726-728]

 

                        TITLE 49--TRANSPORTATION

 

       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 

                             TRANSPORTATION

 

PART 239_PASSENGER TRAIN EMERGENCY PREPAREDNESS--Table of Contents

 

  Subpart D_Operational (Efficiency) Tests; Inspection of Records and 

                              Recordkeeping

 

Sec. 239.303  Electronic recordkeeping.



    Each railroad to which this part applies is authorized to retain by 

electronic recordkeeping the information prescribed in Sec. 239.301, 

provided that all of the following conditions are met:



[[Page 727]]



    (a) The railroad adequately limits and controls accessibility to 

such information retained in its database system and identifies those 

individuals who have such access;

    (b) The railroad has a terminal at the system headquarters and at 

each division headquarters;

    (c) Each such terminal has a desk-top computer (i.e., monitor, 

central processing unit, and keyboard) and either a facsimile machine or 

a printer connected to the computer to retrieve and produce information 

in a usable format for immediate review by representatives of FRA and 

States participating under part 212 of this chapter;

    (d) The railroad has a designated representative who is authorized 

to authenticate retrieved information from the electronic system as true 

and accurate copies of the electronically kept records; and

    (e) The railroad provides representatives of FRA and States 

participating under part 212 of this chapter with immediate access to 

these records for inspection and copying during normal business hours 

and provides printouts of such records upon request.



         Appendix A to Part 239--Schedule of Civil Penalties \1\



------------------------------------------------------------------------

                                                              Willful

                 Section                     Violation       violation

------------------------------------------------------------------------

Subpart B--Specific Requirements:

239.101(a) Failure of a railroad to               $7,500         $11,000

 adopt a written emergency preparedness

 plan...................................

    (a)(1) Failure of the plan to

     provide for:

        (i) Initial or on-board                    2,500           5,000

         notifications by an on-board

         crewmember.....................

        (ii) Notification of outside               2,500           5,000

         emergency responders by control

         center.........................

    (a)(2) Failure of the plan to

     provide for:

        (i) Initial or periodic training           2,500           5,000

         of on-board personnel..........

        (ii) Initial or periodic                   2,500           5,000

         training of control center

         personnel......................

        (iii) Completion of initial                2,500           5,000

         training of all on-board and

         control center personnel by the

         specified date.................

        (iv) Completion of initial                 2,500           5,000

         training of all newly hired on-

         board and control center

         personnel by the specified date

        (v) Adequate procedures to                 2,500           5,000

         evaluate and test on-board and

         control center personnel for

         qualification under the

         emergency preparedness plan....

        (vi) Adequate on-board staffing.           2,500           5,000

    (a)(3) Failure of a host railroad              3,000           6,000

     involved in joint operations to

     coordinate applicable portions of

     the emergency preparedness plan

     with the railroad or railroads

     providing or operating a passenger

     train service operation............

    (a)(4) Failure of the plan to

     address:

        (i) Readiness procedures for               2,500           5,000

         emergencies in tunnels.........

        (ii) Readiness procedures for              2,500           5,000

         emergencies on an elevated

         structure or in electrified

         territory......................

        (iii) Coordination efforts                 2,500           5,000

         involving adjacent rail modes

         of transportation..............

    (a)(5) Failure of the plan to

     address relationships with on-line

     emergency responders by providing

     for:

        (i) The development and                    3,000           6,000

         availability of training

         programs.......................

        (ii) Invitations to emergency              3,000           6,000

         responders to participate in

         emergency simulations..........

        (iii) Distribution of applicable           3,000           6,000

         portions of the current

         emergency preparedness plan....

    (a)(6) Failure of the plan to

     provide for, or the railroad to

     include on board each train and

     maintain and replace:

        (i) Emergency equipment.........           2,500           5,000

        (ii) First-aid kits.............           2,500           5,000

        (iii) Emergency lighting........           2,500           5,000

    (a)(7) Failure of the plan to                  3,500           7,000

     provide for emergency instructions

     inside each passenger car or to

     include additional safety awareness

     information........................

239.103 Failure to conduct a required              5,000           7,500

 full-scale simulation in accordance

 with the frequency schedule............

239.105 Debriefing and critique

    (a) Failure to conduct a debriefing            4,000           7,500

     and critique session after an

     emergency or full-scale simulation.

    (d)(1) Failure to maintain a record.           2,500           5,000

        (i) Failure to include date or             1,000           2,000

         location of the emergency or

         simulation.....................

        (ii) Failure to include date or            1,000           2,000

         location of the debriefing and

         critique session...............

        (iii) Failure to include names             1,000           2,000

         of participants in the

         debriefing and critique session

    (d)(2) Failure to make record                  1,000           2,000

     available..........................

239.107 Emergency exits



[[Page 728]]





    (a)(1), (a)(2):

        (i) Door not marked or                     2,500           5,000

         instructions not posted........

        (ii) Door improperly marked or             2,500           5,000

         instructions 1,000-2,000-

         improperly posted..............

    (b)(1) Failure to provide for                  5,000           7,500

     scheduled inspection, maintenance,

     and repair of emergency windows and

     doors..............................

    (b)(2):

        (i) Failure to test a                      3,000           6,000

         representative sample of

         emergency windows..............

        (ii) Emergency windows tested              1,500           3,000

         too infrequently...............

    (b)(3) Failure to repair an                    3,500           7,000

     inoperative emergency window or

     door exit..........................

    (c):

        (i) Failure to maintain a record           2,500           5,000

        (ii) Failure to make record                1,000           2,000

         available......................

    (d)(1) Insufficient limits or                  2,500           5,000

     controls on accessibility to

     records............................

    (d)(2) Missing terminal.............           1,000           2,000

    (d)(3) Inability of railroad to                1,000           2,000

     produce information in a usable

     format for immediate review........

    (d)(4) Failure by railroad to                  1,000           2,000

     designate an authorized

     representative.....................

    (d)(5) Failure to make record                  1,000           2,000

     available..........................

Subpart C--Review, Approval, and

 Retention of Emergency Preparedness

 Plans:

239.201 Filing and approval

    (a):

        (i) Failure of a railroad to               5,000           7,500

         file a written emergency

         preparedness plan..............

        (ii) Failure to designate a                1,000           2,000

         primary person to contact for

         plan review....................

        (iii) Failure of a railroad to             2,500           5,000

         file an amendment to its plan..

    (b)(1), (b)(2):

        (i) Failure of a railroad to               2,500           5,000

         correct a plan deficiency......

        (ii) Failure to provide FRA with           1,000           2,000

         a corrected copy of the plan...

    (b)(3):

        (i) Failure of a railroad to               2,500           5,000

         correct an amendment deficiency

        (ii) Failure to file a corrected           1,000           1,000

         plan amendment with FRA........

239.203 Retention of emergency

 preparedness plan

        (1) Failure to retain a copy of            2,500           5,000

         the plan or an amendment to the

         plan...........................

        (2) Failure to make record                 1,000           2,000

         available......................

Subpart D--Operational (efficiency)

 tests; Inspection of Records and

 Recordkeeping:

239.301 Operational (efficiency) tests

    (a) Testing Program.................           5,000           7,500

    (b)(1) Failure to maintain a record.           2,500           5,000

    (b)(2) Record improperly completed..           1,000           1,000

    (c)(1) Failure to retain a copy of             2,500           5,000

     the record.........................

    (c)(2) Failure to make record                  1,000           2,000

     available..........................

239.303 Electronic recordkeeping

    (a) Insufficient limits or controls            2,500           5,000

     on accessibility to records........

    (b) Missing terminal................           1,000           2,000

    (c) Inability of railroad to produce           1,000           2,000

     information in a usable format for

     immediate review...................

    (d) Failure by railroad to designate           1,000           2,000

     an authorized representative.......

    (e) Failure to make record available           1,000           2,000

------------------------------------------------------------------------

1 A penalty may be assessed against an individual only for a willful

  violation. The Administrator reserves the right to assess a penalty of

  up to $27,000 for any violation where circumstances warrant. See 49

  U.S.C. 21301, 21304, and 49 CFR part 209, appendix A. Further

  designations, not found in the CFR citation for certain provisions,

  are FRA Office of Chief Counsel computer codes added as a suffix to

  the CFR citation and used to expedite imposition of civil penalties

  for violations. FRA reserves the right, should litigation become

  necessary, to substitute in its complaint the CFR citation in place of

  the combined designation cited in the penalty demand letter.





[63 FR 24676, May 4, 1998, as amended at 69 FR 30595, May 28, 2004]