[Code of Federal Regulations]

[Title 7, Volume 15]

[Revised as of January 1, 2006]

From the U.S. Government Printing Office via GPO Access

[CITE: 7CFR3560.103]



[Page 505-508]

 

                          TITLE 7--AGRICULTURE

 

     CHAPTER XXXV--RURAL HOUSING SERVICE, DEPARTMENT OF AGRICULTURE

 

PART 3560_DIRECT MULTI-FAMILY HOUSING LOANS AND GRANTS--Table of Contents

 

      Subpart C_Borrower Management and Operations Responsibilities

 

Sec. 3560.103  Maintaining housing projects.



    (a) Physical maintenance. (1) The purposes of physical maintenance 

are the following:

    (i) Provide decent, safe, and sanitary housing; and

    (ii) Maintain the security of the property.

    (2) Borrowers are responsible for the long-term, cost-effective 

preservation of the housing project.

    (3) At all times, borrowers must maintain housing projects in 

compliance with local, state and federal laws and regulations and 

according to the following Agency requirements for affordable, decent, 

safe, and sanitary housing. Agency design requirements are discussed in 

Sec. 3560.60. The Agency acknowledges that property maintenance is an 

ongoing process and will not penalize borrowers for less than 100 

percent compliance as long as it is evident that the borrower is 

striving to achieve the standards listed in this paragraph. In addition, 

the Agency understands that although its multifamily housing portfolio 

is relatively homogeneous, no one standard is appropriate for all 

properties.

    (i) Utilities. The housing project must have an adequate and safe 

water supply, a functional and safe waste disposal system, and must be 

free of hazardous waste material.

    (ii) Drainage and erosion control. The housing project must have 

drainage that effectively protects the housing project from water damage 

from standing water and erosion. Units, basements, and crawl spaces must 

be free of water seepage.

    (iii) Landscaping and grounds. The housing project must be 

landscaped attractively. Lawns, plants and shrubs must be maintained and 

must allow air to windows, vents, and sills. Recreation areas must be 

maintained in a safe and clean manner and trash collection areas must be 

adequately sized, screened, and maintained.

    (iv) Drives, parking services and walks. The housing project must 

have drives, parking lots, and walks that are free of holes and 

deterioration. Walks with changes in height between slabs of 

approximately \1/2\ inch or greater will be considered unacceptable.

    (v) Exterior signage. All signs at the housing project, including 

those related to the housing project name, buildings, parking spaces, 

unit numbers and other informational directions must be visible and 

well-kept. Sign requirements must conform to Sec. 3560.104(d).

    (vi) Fences and retaining walls. The housing project must have fence 

lines that are free of trash, weeds, vines, and other vegetation. Fences 

must be free of holes and damaged or loose sections. The bases of all 

retaining walls must be erosion free and drainage weep holes must be 

cleaned out to prevent excessive pressure behind the retaining wall.

    (vii) Debris and graffiti. The housing project, including common 

areas, must



[[Page 506]]



be free of trash, litter, and debris. Public walkways, walls of 

buildings and common areas must be free of graffiti.

    (viii) Lighting. The housing project must have functional exterior 

lighting and functional interior lighting in common areas which permits 

safe access and security.

    (ix) Foundation. The housing project must have a foundation that is 

free of evidence of structural failure, such as uneven settlement 

indicated by horizontal cracks or severe bowing of the foundation wall. 

Structural members must not have evidence of rot or insect or rodent 

infestation.

    (x) Exterior walls and siding. The housing project must have walls 

that are free from deterioration which allows elements to infiltrate the 

structure, eaves, gables, and window trim that are free from 

deterioration, exterior wall coverings that are intact, securely 

attached, and in good condition. Brick veneers must be free of missing 

mortar or bricks.

    (xi) Roofs, flashing, and gutters. The housing project must have 

gutters and downspouts, where appropriate for climatic conditions, that 

are securely attached, clean, and finished or painted properly with 

splash blocks or extenders that direct water flow away from the 

building. The housing project must have a roof that is free of leaks, 

defective covering, curled or missing shingles and which is not sagging 

or buckling. Fascia and soffits must be intact.

    (xii) Windows, doors, and exterior structures. The housing project 

must have screens that are free of tears, breaks and rips and windows 

that are unbroken. Window thermopane seals must be unbroken and caulking 

on the exterior of windows and doors must be continuous and free of 

cracks. Doors must be weather tight, free of holes, and provide security 

with functional locks. Porches, balconies, and exterior stairs must be 

free of broken, missing, or rotting components.

    (xiii) Common area accessibility. The housing project must have 

accessible, designated handicapped parking spaces with handicapped space 

signs properly posted. Common areas must be accessible through walks, 

ramps, porches, and thresholds. The laundry room must have accessible 

appliances and mailboxes must be at an accessible level. Elevators or 

mechanical lifts must be functional and kept in good repair.

    (xiv) Common area signage. The following must be posted in a 

conspicuous place in a common area: ``Justice for All'' poster, HUD 

equal housing opportunity poster including the Spanish version if there 

are Hispanic Limited English Proficiency tenants or applicants, current 

affirmative fair housing marketing plan, the tenant grievance and appeal 

procedure, housing project occupancy rules, office hours and phone 

number, and emergency hours and phone number.

    (xv) Flooring. If a housing project has carpeting, the carpet must 

be clean, without excessive wear, and seams that are secure and 

stretched properly. If the housing project has resilient flooring, the 

flooring must be clean, unstained, free of tears and breaks, and seams 

that are secure.

    (xvi) Walls, floors, and ceilings. The housing project must have 

walls, floors, and ceilings that are free of holes, evidence of current 

water leaks, and free of material that appears in danger of falling. The 

housing project must have wallboard joints that are secure and free of 

cracks.

    (xvii) Doors and windows. The housing project must have doors that 

are free of holes, secure, unbroken and easily operable hardware, 

deadbolt locks which are in place and secure, and, if doors are metal, 

free of rust. The housing project must have windows which are easily 

operated, free of bent blinds or torn curtains, and window interiors 

must be free of evidence of moisture damage.

    (xviii) Electrical, air conditioning and heating. The housing 

project must have heating and cooling units that are free of bare wires 

and which are functioning properly, including thermostats. The housing 

project must not have uncovered outlets or other evident safety hazards, 

switches which work improperly, or light fixtures which are broken and 

inoperable.

    (xix) Water heaters. The housing project must have water heaters 

which are operating properly, free of leaks, supply adequate hot water, 

and are fitted with temperature and pressure relief valves.



[[Page 507]]



    (xx) Smoke alarms. The housing project must have smoke alarms which 

are properly located according to local code and which operate properly.

    (xxi) Emergency call system. If a housing project has an emergency 

call system, the switches must be located in the bathroom and bedroom, 

furnished with a pull cord, with the down position set to ``ON'', and 

must operate properly.

    (xxii) Insect or vermin infestation. The housing project must have 

all units free of visible signs of insects or rodents and must be free 

of signs of insect or rodent damage.

    (xxiii) Range and range hood. The housing project must have range 

units in which all elements are operable, electrical connections are 

secure and insulated, doors and drawers which are secure, control knobs 

and handles which are in place and secure, and housing which is sound 

and the finish is free of chips, damage, or signs of rust. The range 

hood fan and light must be operable.

    (xxiv) Refrigerator. The housing project must have refrigerators in 

which the cooler and freezer are operating properly, the shelves and 

door containers are secure and free of rust, door gaskets are in good 

condition and functioning properly, and the housing is sound and the 

finish is free of chips, damage, or signs of rust.

    (xxv) Sinks. The housing project must have sinks in which the 

fittings work properly and are free of leaks, plumbing connections under 

the cabinet which are free of leaks, the finish is free of chips, 

damage, or signs of rust, the strainer is in good condition and in 

place, and which are secured to a wall, counter, or vanity top.

    (xxvi) Cabinets. The housing project must have cabinets and vanities 

which are secure to walls or floor and have faces, doors, and drawer 

fronts that are in good condition and free of breaks and peeling. 

Shelving must be in place, fastened securely, and free of warps. The 

housing project must have counter tops which are secure and free of burn 

marks or chips, bottoms under sinks which are free of evidence of 

warping, breaks, or being water soaked. Kitchen counter, vanity tops, 

and back splashes must be properly caulked.

    (xxvii) Water closets. The housing project must have the base of the 

water closets at the floor properly caulked. The tanks must be free of 

cracks or leaks and have a lid which fits and is in good condition. The 

seats must be secure and in good condition, and the flushing mechanisms 

must be in good condition and operating properly. The stools must be 

free of cracks and breaks and be securely fastened to the floor.

    (xviii) Bathtub and shower stalls. The housing project must have 

tubs or shower stalls which are free of cracks, breaks, and leaks, and a 

strainer in good condition and in place. The housing project must have 

walls and floors of the bathtubs which are properly caulked, tops and 

sides of shower stalls must be properly caulked, and the finish is free 

of chips, damage, or signs of rust.

    (4) The Agency expects that upon discovery of a condition not in 

compliance with the standards listed in this section that the borrower 

will remedy the situation in a timeframe required by the Agency. The 

Borrower must provide documentation and justification for any failure to 

meet such timeframe. Properties with deficiencies in the process of 

being addressed will not be deemed to be out of compliance unless there 

are so many deficiencies that it would result in a declaration of 

substantial noncompliance and call into questions the viability of the 

property and the effectiveness of the borrower's maintenance program. 

Failure to make such corrections or repairs constitutes a non-monetary 

default under Sec. 3560.452(e).

    (b) Maintenance systems. Borrowers must establish the following 

maintenance systems and must describe these systems in their management 

plan.

    (1) A system for routine maintenance, including:

    (i) Regular maintenance tasks that can be prescheduled or planned; 

and

    (ii) Tasks performed on a regular basis to maintain compliance with 

the standards established in paragraph (a)(3) of this section.

    (2) A system for responsive maintenance including:

    (i) A process for responding to requests for maintenance from 

tenants;



[[Page 508]]



    (ii) A process for responding to unexpected malfunctions of 

equipment or damages to building systems such as a furnace breakdown or 

a water leak; and

    (iii) A ``work order'' process for managing and tracking responses 

to maintenance requests and the performance of maintenance tasks.

    (3) A system for preventive maintenance including:

    (i) Maintenance of mechanical systems, building exteriors, 

elevators, and heating and cooling systems which require specially 

trained personnel; and

    (ii) Maintenance that supports energy-efficient operation of the 

housing project.

    (4) A system for correcting deficiencies identified by periodic 

inspections, which must include:

    (i) A move-in inspection;

    (ii) A move-out inspection; and

    (iii) An annual inspection of occupied units.

    (c) Capital budgeting and planning. (1) Borrowers must develop a 

capital budget as part of their annual housing project budget required 

under Sec. 3560.303. The capital budget must include anticipated 

expenditures on the long-term capital needs of the housing project to 

assure adequate maintenance and replacement of capital items.

    (2) If the borrower requests an increase in the project's reserve 

for replacement account, the borrower must have a capital needs 

assessment prepared and submitted to the Agency to reflect anticipated 

needs of the housing project for replacement of capital equipment and 

systems. The cost for preparation of a capital needs assessment will be 

approved by the Agency as an eligible housing project expense provided 

the capital needs assessment is reasonable in cost and meets Agency 

requirements.

    (3) [Reserved]

    (4) As a part of the annual budget process, borrowers may request an 

increase in the amount to be contributed and held in the housing project 

reserve account to fund the needs identified in an Agency-approved 

capital needs assessment.

    (5) At any time, borrowers may request and the Agency may approve 

amendments to loan or grant documents to increase the amount of funds to 

be contributed and held in a reserve account to cover the cost of 

capital improvements based on the needs identified in an Agency approved 

capital needs assessment. Borrowers must assure improvements are 

performed as specified in the capital needs assessment.