[Code of Federal Regulations] [Title 33, Volume 1] [Revised as of July 1, 2006] From the U.S. Government Printing Office via GPO Access [CITE: 33CFR117.139] [Page 551] TITLE 33--NAVIGATION AND NAVIGABLE WATERS CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PART 117_DRAWBRIDGE OPERATION REGULATIONS--Table of Contents Subpart B_Specific Requirements Sec. 117.139 White River. (a) Requirements for the Missouri Pacific railroad bridge, mile 7.5 at Benzal, are in Sec. 117.123. (b) The draws of the St. Louis Southwestern railroad bridge, mile 98.9 at Clarendon, the US70 highway bridge, mile 121.7 at DeValls Bluff, the Chicago, Rock Island and Pacific Railroad bridge, mile 122.0 at DeValls Bluff, the Missouri Pacific railroad bridge, mile 196.3 at Augusta, and the Missouri Pacific railroad bridge, mile 254.8 at Newport, shall open on signal if at least eight hours notice is given. The draws of any of these bridges need not be opened for a vessel that arrives later than two hours after the time specified in the notice, unless a second notice of at least eight hours is given. (c) The draws of the Arkansas highway bridge, mile 300.1 at Batesville, and the Missouri Pacific railroad bridge, mile 401.9 at Cotter, need not be opened for the passage of vessels. California