Sec.  240.9  Procedures.



    (a) For non-Federal works undertaken prior to 17 November 1986, 

credit determinations (deferred until these guidelines became effective) 

will be made by the Secretary in response to the applications received 

prior to 31 March 1987. Future non-Federal works for which credit may be 

allowed under the provisions of section 104 of Pub. L. 99-662 are 

limited, basically, to local works undertaken while Federal 

preauthorizations studies of a Federal project for the locality are in 

progress. Credit consideration for such works will be governed by the 

procedures set forth here. Non-Federal entities desiring credit should 

confer with the District Engineer and submit a written application to 

him. The application will include a full description of planned work, 

plans, sketches, and similar engineering data and information sufficient 

to permit analysis of the local proposal.

    (b) The District Engineer shall review the engineering adequacy of 

the local proposal and its relation to the Federal Plan and determine 

what part of the proposed local improvement would be eligible for 

credit. The District Engineer will forward his recommendations through 

the Division Engineer and the Chief of Engineers to the Assistant 

Secretary of the Army



[[Page 335]]



(Civil Works) and provide information on:

    (1) Basis for concluding the local plan is appropriate in relation 

to the prospective Federal plan.

    (2) Total estimated cost and benefits of creditable work.

    (3) Environmental effects of the local work, including a brief 

statement of both beneficial and detrimental effects to significant 

resources.

    (4) The urgency for proceeding with the local plan.

    (c) Upon being informed of the Secretary's decision, the District 

Engineer shall reply by letter stating to the local applicant what local 

work and costs can reasonably be expected to be recommended for credit 

under the provisions of section 104 (assuming that the final plan for a 

Federal project, when it is ultimately recommended, remains such as to 

preserve the local work as a relevant element). If the improvement 

proposed by the non-Federal entity includes work that will not become a 

part of the Federal project, the means of determining the part eligible 

for credit shall be fully defined. This letter shall include the 

following conditions:

    (1) This shall not be interpreted as a Federal assurance regarding 

later approval of any project nor shall it commit the United States to 

any type of reimbursement if a Federal project is not undertaken.

    (2) This does not eliminate the need for compliance with other 

Federal, State, and local requirements, including any requirements for 

permits, Environmental Impact Statements, etc.

    (3) Upon authorization of the Federal project, approval shall be 

subject to rescission if the non-Federal work has not commenced and, as 

a consequence, Corps planning for orderly implementation of the project 

is being adversely affected.

    (d) The non-Federal entity will notify the District engineer when 

work commences. The District Engineer will conduct periodic and final 

inspections. Upon completion of local work, local interests shall 

provide the District Engineer details of the work accomplished and the 

actual costs directly associated therewith. The District Engineer shall 

audit claimed costs to ascertain and confirm those costs properly 

creditable and shall inform the non-Federal entity of the audit results.

    (e) During further Corps studies, the local work actually 

accomplished that would constitute a legitimate part of the overall 

recommended Federal project may be incorporated within any plan later 

recommended for implementation.

    (f) The District Engineer shall submit a copy of his letter and 

notification of creditable costs of completed work to the Secretary 

through the Division Engineer and the Chief of Engineers.

    (g) All justification sheets supporting new start recommendations 

for Preconstruction Engineering and Design or Construction of projects 

will include information on credits in the paragraph on local 

cooperation. The information should include but not be limited to date 

of the District Engineer's letter to the sponsor pursuant to Sec.  

240.9(c) of this regulation, status of the creditable work, estimated or 

actual cost of the work and the estimated amount of credit.



                    Appendix A to Part 240 [Reserved]



  Appendix B to Part 240--Formulas for Determining Amount of Allowable 

                                 Credit



    1. General. The amount of credit that non-Federal interests may 

receive under the provisions of section 104 of the Water Resources 

Development Act of 1986 depends first on the value of the compatible 

work they have accomplished and then on the value of the local 

cooperation against which they may receive credit. If the compatible 

work is for construction which was outside the scope of the project as 

authorized, the costs for the compatible work for which credit is 

desired are additive to the original estimate of total project cost. 

This increases the estimated cost of basic local cooperation 

requirements, thus enlarging the target against which credit may be 

given.

    2. The ``formulas'' for determining the amount of credit that may be 

allowed in the various cases are provided in the following paragraphs. 

TPC means the total estimate of project costs for the project as it was 

authorized. LERRD means the costs for lands, easements, rights-of-way, 

relocations and disposal areas as included in that estimate.

    3. Calculations for several hypothetical examples are provided to 

illustrate how crediting determinations would impact on



[[Page 336]]



project costs and on cost sharing. For each of these examples it is 

assumed that the estimated total project cost (TPC) of the project as 

authorized is $100.0 million. All of the elements of cost are given in 

millions of dollars.

    4. Integral Work. For compatible work that is integral with the 

project as authorized (240.7(a)(1)) or compatible work that constitutes 

an advantageous substitution for work integral with the authorized 

project (i.e., substitute work, 240.7(a)(3)):



a. LERRD <=20% TPC

    Credit = Value of compatible work up to 20% TPC

b. LERRD =20% TPC

    Credit = Value of compatible work up to LERRD



    Crediting non-Federal interests for constructing an integral part of 

the project or substitute work will not result in any increase in 

project costs. Ordinarily, the result will simply be a transfer of 

equivalent responsibilities between the Corps and non-Federal interests. 

If non-Federal interests should accomplish compatible integral or 

substitute work exceeding the possible credit, the Corps will be 

relieved of the expense of constructing an increment of the project. An 

example is provided below. In this example, non-Federal interests have 

accomplished integral project work amounting to 30.0 million. LERRD are 

less than 20% of TPC so that the maximum value of local cooperation 

against which they may receive credit is $20.0 million. Since the $10.0 

for which credit cannot be given nonetheless represents useful project 

work, in this example the Corps would be relieved of the costs for 

accomplishing that much construction.



------------------------------------------------------------------------

                                                                Credit

                                                     Basic    Example 1:

              Case: LERRD <= 20% TPC                project   Compatible

                                                              work, 30.0

------------------------------------------------------------------------

Non-Federal:

  5% Cash........................................       5.0          5.0

  LERRD..........................................      14.0          0.0

  Extra cash (toward constr.)....................       6.0          0.0

  Construction (actual)..........................  ........         30.0

                                                  ----------------------

      Subtotal...................................      25.0         35.0

                                                  ======================

Federal:

  Construction...................................      75.0         51.0

  LERRD..........................................  ........         14.0

                                                  ----------------------

      Subtotal...................................      75.0         65.0

                                                  ======================

      TPC........................................     100.0        100.0

Reduction in Federal costs.......................  ........     \1\ 10.0

------------------------------------------------------------------------

\1\ The amount by which the integral or substitute work actually

  accomplished by non-Federal interests exceeds the requirements of

  local cooperation against which credit may be given.



    5. External Work. For compatible work outside the scope of the 

project as authorized (i.e., external work, 240.7(a)(2)):

a. LERRD <=25% TPC



    Credit = Value of compatible work up to 25% TPC

b. LERRD =25% TPC

    Credit = Value of compatible work up to LERRD



    Crediting non-Federal interests for compatible work which was not 

part of the project as authorized (external work) will result in an 

increase in project costs and an increase in the net Federal costs. The 

costs for compatible external work for which non-Federal interests 

desire credit must be incorporated into the estimate of total project 

costs (but only to the extent that credit can actually be given). 

Assigned Federal and non-Federal project costs then making up the 

adjusted total project costs will both be greater than for the basic 

project. However, the net effect will be a savings to non-Federal 

interests in the further costs they will have for fulfilling local 

cooperation requirements. The maximum amount that can be credited for 

compatible external work (and thus added to project costs), where LERRD 

<=25% TPC, follows from Credit, C = 20% (TPC + C) which reduces to C = 

0.2TPC + 0.2C, then to 0.8C = 0.2TPC, and finally C = (0.2/0.8)TPC or 

0.25TPC as indicated in a, above. An example of crediting in a case 

involving external work is provided below. In this example, as in 

example 1, non-Federal interests have accomplished work amounting to 

$30.0 million. This work, however, was not intergral with the project as 

authorized (it has been determined to be compatible external work), so 

that any part of it for which credit is given must be added to TPC. 

Since, in this case LERRD are less than 25% of TPC, the maximum amount 

that can be credited is 25% of TPC, or $25.0 million. Adjusting TPC by 

this amount results in an added Federal cost of $18.75 million (75% of 

the $25.0 million increase).



------------------------------------------------------------------------

                                                               Credit

                                                    Basic    Example 2,

              Case: LERRD <=25% TPC                project   Compatible

                                                             work, 30.0

------------------------------------------------------------------------

Non-Federal:

  5% Cash.......................................       5.0          6.25

  LERRD.........................................      14.0          0.0

  Extra cash (toward constr.)...................       6.0          0.0

  Construction (actual).........................  ........         25.0

                                                 -----------------------

      Subtotal..................................      25.0         31.25

                                                 =======================

Federal:

  Construction..................................      75.0         79.75

  LERRD.........................................  ........         14.0

                                                 -----------------------

      Subtotal..................................      75.0         93.75

TPC.............................................     100.0  ............

Adjusted TPC....................................  ........        125.0

Excess of Compatible Work.......................  ........      \1\ 5.0



[[Page 337]]





Increase in Federal Costs.......................  ........     \2\ 18.75

------------------------------------------------------------------------

\1\ This portion of the compatible external work is not incorporated in

  the project costs because it would be a disadvantage to the project

  sponsor to do so (if included, the sponsor would become obligated for

  an additional 5% up-front cash contribution but without any savings in

  other local cooperation because there would be nothing left to give

  credit against).

\2\ This is also the measure of the net savings to non-Federal interests

  by virtue of crediting.



    6. Combined integral and external works. For cases where non-Federal 

interests have accomplished compatible work, some of which is integral 

with the project as authorized and some of which is outside the original 

scope (external), determination of the allowable credit is a two step 

process. Work that is integral to the project is credited first. This, 

C1, is accomplished in accordance with paragraph 4 above. If, after this 

step, there remain local cooperation requirements against which credit 

may be given, credit for compatible external work, C2, is determinable 

on the following basis.



a. LERRD <=20% (TPC+C2)

    C2=Value of compatible work up to 25% TPC-1.25C1

b. LERRD =20% (TPC+C2)

    C2=Value of compatible work up to remaining LERRD



    Note that total credit, C=C1+C2. Formula 6.a. is derived from 

C=C1+C2=20% (TPC+C2). An example of crediting in a case involving both 

kinds of compatible works is provided below. In this example non-Federal 

interests have accomplished $25.0 million in compatible work, $5.0 of 

which was integral with the project as authorized and $20.0 of which was 

external. The integral work is credited in the first step against the 

extra cash component of the original local cooperation requirements. TPC 

is unaffected; however, the target against which credit for the external 

work might be credited has been partially used up. The second step shows 

only the incremental effects of crediting external work. Using 6.a. the 

maximum credit that can be given for this work is $18.75 million. 

Although other non-Federal requirements are extinguished as a result of 

the credit for the external work, the non-Federal 5% cash contribution 

increases by $0.9375 million, say $0.94 (5% of $18.75). In the final 

step, the incremental effects of crediting the external work are added 

in with the values obtained in step 1.



----------------------------------------------------------------------------------------------------------------

                                                                          Credit Example 3: Compatible work, \1\

                                                               Basic                       25.0

                Case: LERRD <=20% (TPC+C2)                    project   ----------------------------------------

                                                                            Step 1       Step 2         Final

----------------------------------------------------------------------------------------------------------------

Non-Federal:

    5% Cash...............................................          5.0          5.0          0.94          5.94

    LERRD.................................................         14.0         14.0          0.0           0.0

    Extra cash (toward constr.)...........................          6.0          1.0          0.0           0.0

    Construction (actual).................................  ...........          5.0         18.75         23.75

                                                           -----------------------------------------------------

      Subtotal............................................         25.0         25.0  ............         29.69

                                                           =====================================================

Federal:

  Construction............................................         75.0         75.0          0.06         75.06

  LERRD...................................................  ...........  ...........         14.0          14.0

                                                           -----------------------------------------------------

      Subtotal............................................         75.0         75.0  ............         89.06

TPC.......................................................        100.0        100.0  ............  ............

Adjusted TPC..............................................  ...........  ...........  ............        118.75

Excess of Compatible Worth................................  ...........  ...........          1.25          1.25

Increase in Federal Costs.................................  ...........  ...........  ............         14.06

----------------------------------------------------------------------------------------------------------------

\1\ Compatible work consisting of 5.0 integral work credited in first step of calculations plus 20.0 external

  work credited, to the extent possible, in second step.