[Code of Federal Regulations]

[Title 40, Volume 31]

[Revised as of July 1, 2006]

From the U.S. Government Printing Office via GPO Access

[CITE: 40CFR1051.515]



[Page 648-652]

 

                   TITLE 40--PROTECTION OF ENVIRONMENT

 

         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

 

PART 1051_CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES

--Table of Contents

 

                        Subpart F_Test Procedures

 

Sec.  1051.515  How do I test my fuel tank for permeation emissions?



    Measure permeation emissions by weighing a sealed fuel tank before 

and after a temperature-controlled soak.

    (a) Preconditioning fuel soak. To precondition your fuel tank, 

follow these five steps:

    (1) Fill the tank with the fuel specified in Sec.  

1051.501(d)(2)(i), seal it, and allow it to soak at 28 5 [deg]C for 20 weeks. Alternatively, the tank may be 

soaked for a shorter period of time at a higher temperature if you can 

show that the hydrocarbon permeation rate has stabilized.

    (2) Determine the fuel tank's internal surface area in square-meters 

accurate to at least three significant figures. You may use less 

accurate estimates of the surface area if you make sure not to 

overestimate the surface area.

    (3) Fill the fuel tank with the test fuel specified in Sec.  

1051.501(d)(2)(ii) to its nominal capacity. If you fill the tank inside 

the temperature-controlled room or enclosure, do not spill any fuel.

    (4) Allow the tank and its contents to equilibrate to 28 2 [deg]C.

    (5) Seal the fuel tank using fuel caps and other fittings (excluding 

petcocks) that can be used to seal openings in a production fuel tank. 

In cases where openings are not normally sealed on the fuel tank (such 

as hose-connection fittings and vents in fuel caps), these openings may 

be sealed using nonpermeable fittings such as metal or fluoropolymer 

plugs.

    (b) Permeation test run. To run the test, take the following steps 

for a tank that was preconditioned as specified in paragraph (a) of this 

section:

    (1) Weigh the sealed fuel tank and record the weight to the nearest 

0.1 grams. You may use less precise weights as long as the difference in 

mass from the start of the test to the end of the test has at least 

three significant figures. Take this measurement within 8 hours of 

filling the tank with test fuel as specified in paragraph (a)(3) of this 

section.



[[Page 649]]



    (2) Carefully place the tank within a ventilated, temperature-

controlled room or enclosure. Do not spill or add any fuel.

    (3) Close the room or enclosure and record the time.

    (4) Ensure that the measured temperature in the room or enclosure is 

28 2 [deg]C.

    (5) Leave the tank in the room or enclosure for 14 days.

    (6) Hold the temperature of the room or enclosure to 28 2 [deg]C; measure and record the temperature at least 

daily.

    (7) At the end of the soak period, weigh the sealed fuel tank and 

record the weight to the nearest 0.1 grams. You may use less precise 

weights as long as the difference in mass from the start of the test to 

the end of the test has at least three significant figures. Unless the 

same fuel is used in the preconditioning fuel soak and the permeation 

test run, record weight measurements on five separate days per week of 

testing. The test is void if a linear plot of tank weight vs. test days 

for the full soak period for permeation testing specified in paragraph 

(b)(5) of this section yields r\2\ below 0.8. See 40 CFR 1065.602 for 

the equation to calculate r\2\.

    (8) Subtract the weight of the tank at the end of the test from the 

weight of the tank at the beginning of the test; divide the difference 

by the internal surface area of the fuel tank. Divide this g/m\2\ value 

by the number of test days (using at least three significant figures) to 

calculate the g/m\2\/day emission rate. Example: If a tank with an 

internal surface area of 0.72 m\2\ weighed 31882.3 grams at the 

beginning of the test and weighed 31813.8 grams after soaking for 14.03 

days, then the g/m\2\/day emission rate would be--



(31882.3 g-31813.8 g)/0.72 m\2\/14.03 days = 6.78 g/m\2\/day.

    (9) Round your result to the same number of decimal places as the 

emission standard.

    (10) In cases where consideration of permeation rates, using good 

engineering judgment, leads you to conclude that soaking for 14 days is 

not long enough to measure weight change to at least three significant 

figures, you may soak for 14 days longer. In this case, repeat the steps 

in paragraphs (b)(8) and (9) of this section to determine the weight 

change for the full 28 days.

    (c) Determination of final test result. To determine the final test 

result, apply a deterioration factor to the measured emission level. The 

deterioration factor is the difference between permeation emissions 

measured before and after the durability testing described in paragraph 

(d) of this section. Adjust the baseline test results for each tested 

fuel tank by adding the deterioration factor to the measured emissions. 

The deterioration factor determination must be based on good engineering 

judgement. Therefore, during the durability testing, the test tank may 

not exceed the fuel tank permeation standard described in Sec.  1051.110 

(this is known as ``line-crossing''). If the deterioration factor is 

less than zero, use zero.

    (d) Durability testing. You normally need to perform a separate 

durability demonstration for each substantially different combination of 

treatment approaches and tank materials. Perform these demonstrations 

before an emission test by taking the following steps, unless you can 

use good engineering judgment to apply the results of previous 

durability testing with a different fuel system. You may ask to exclude 

any of the following durability tests if you can clearly demonstrate 

that it does not affect the emissions from your fuel tank.

    (1) Pressure cycling. Perform a pressure test by sealing the tank 

and cycling it between +2.0 psig and -0.5 psig and back to +2.0 psig for 

10,000 cycles at a rate 60 seconds per cycle.

    (2) UV exposure. Perform a sunlight-exposure test by exposing the 

tank to an ultraviolet light of at least 24 W/m\2\ (0.40 W-hr/m\2\/min) 

on the tank surface for at least 450 hours. Alternatively, the fuel tank 

may be exposed to direct natural sunlight for an equivalent period of 

time, as long as you ensure that the tank is exposed to at least 450 

daylight hours.

    (3) Slosh testing. Perform a slosh test by filling the tank to 40 

percent of its capacity with the fuel specified in Sec.  

1051.501(d)(2)(i) and rocking it at a rate of 15 cycles per minute until 

you reach one million total cycles. Use an angle deviation of +15[deg] 

to -15[deg] from



[[Page 650]]



level. This test must be performed at a temperature of 28 [deg]C 5 [deg]C.

    (4) Final test result. Following the durability testing, the fuel 

tank must be soaked (as described in paragraph (a) of this section) to 

ensure that the permeation rate is stable. The period of slosh testing 

and the period of ultraviolet testing (if performed with fuel in the 

tank consistent with paragraph (a)(1) of this section) may be considered 

to be part of this soak, provided that the soak begins immediately after 

the slosh testing. To determine the final permeation rate, drain and 

refill the tank with fresh fuel, and repeat the permeation test run (as 

described in paragraph (b) of this section) immediately after this soak 

period. The same test fuel must be used for this permeation test run as 

for the permeation test run performed prior to the durability testing.

    (e) Flow chart. The following figure presents a flow chart for the 

permeation testing described in this section, showing the full test 

procedure with durability testing, as well as the simplified test 

procedure with an applied deterioration factor:





[[Page 651]]





[GRAPHIC] [TIFF OMITTED] TR15JA04.002





[[Page 652]]







[67 FR 68347, Nov. 8, 2002, as amended at 69 FR 2442, Jan. 15, 2004; 70 

FR 40501, July 13, 2005]