[Code of Federal Regulations]

[Title 40, Volume 24]

[Revised as of July 1, 2006]

From the U.S. Government Printing Office via GPO Access

[CITE: 40CFR192.03]



[Page 20]

 

                   TITLE 40--PROTECTION OF ENVIRONMENT

 

         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

 

PART 192_HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND 

THORIUM MILL TAILINGS--Table of Contents

 

 Subpart A_Standards for the Control of Residual Radioactive Materials 

                 from Inactive Uranium Processing Sites

 

Sec.  192.03  Monitoring.



    A groundwater monitoring plan shall be implemented, to be carried 

out over a period of time commencing upon completion of remedial actions 

taken to comply with the standards in Sec.  192.02, and of a duration 

which is adequate to demonstrate that future performance of the system 

of disposal can reasonably be expected to be in accordance with the 

design requirements of Sec.  192.02(c). This plan and the length of the 

monitoring period shall be modified to incorporate any corrective 

actions required under Sec.  192.04 or Sec.  192.12(c).



[60 FR 2866, Jan. 11, 1995]