    A plan for the design of new facilities or modifications to existing 

facilities shall be prepared or approved by a professional engineer. A 

list of major considerations and the rationale for the



[[Page 325]]



decision on each consideration shall be approved by the responsible 

agency prior to authorization for construction. This information shall 

remain available for review.