[Code of Federal Regulations]
[Title 40, Volume 6]
[Revised as of July 1, 2006]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR60.1]

[Page 5-26]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 60_STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of 
Contents
 
                      Subpart A_General Provisions
 
Sec.  60.1  Applicability.




                      Subpart A_General Provisions

Sec.
60.1 Applicability.
60.2 Definitions.
60.3 Units and abbreviations.
60.4 Address.
60.5 Determination of construction or modification.
60.6 Review of plans.
60.7 Notification and record keeping.
60.8 Performance tests.
60.9 Availability of information.
60.10 State authority.
60.11 Compliance with standards and maintenance requirements.
60.12 Circumvention.
60.13 Monitoring requirements.
60.14 Modification.
60.15 Reconstruction.
60.16 Priority list.
60.17 Incorporations by reference.
60.18 General control device requirements.
60.19 General notification and reporting requirements.

     Subpart B_Adoption and Submittal of State Plans for Designated 
                               Facilities

60.20 Applicability.
60.21 Definitions.
60.22 Publication of guideline documents, emission guidelines, and final 
          compliance times.
60.23 Adoption and submittal of State plans; public hearings.
60.24 Emission standards and compliance schedules.
60.25 Emission inventories, source surveillance, reports.
60.26 Legal authority.
60.27 Actions by the Administrator.
60.28 Plan revisions by the State.
60.29 Plan revisions by the Administrator.

           Subpart C_Emission Guidelines and Compliance Times

60.30 Scope.
60.31 Definitions.

Subpart Ca [Reserved]

Subpart Cb_Emissions Guidelines and Compliance Times for Large Municipal 
  Waste Combustors That Are Constructed on or Before September 20, 1994

60.30b Scope.
60.31b Definitions.
60.32b Designated facilities.
60.33b Emission guidelines for municipal waste combustor metals, acid 
          gases, organics, and nitrogen oxides.
60.34b Emission guidelines for municipal waste combustor operating 
          practices.
60.35b Emission guidelines for municipal waste combustor operator 
          training and certification.
60.36b Emission guidelines for municipal waste combustor fugitive ash 
          emissions.
60.37b Emission guidelines for air curtain incinerators.
60.38b Compliance and performance testing.
60.39b Reporting and recordkeeping guidelines and compliance schedules.

Table 1 to Subpart Cb of Part 60--Nitrogen Oxides Guidelines for 
          Designated Facilities
Table 2 to Subpart Cb of Part 60--Nitrogen Oxides Limits for Existing 
          Designated Facilities Included in an Emissions Averaging Plan 
          at a Municipal Waste Combustor Plant
Table 3 to Subpart Cb of Part 60--Municipal Waste Combustor Operating 
          Guidelines

Subpart Cc_Emission Guidelines and Compliance Times for Municipal Solid 
                             Waste Landfills

60.30c Scope.
60.31c Definitions.
60.32c Designated facilities.
60.33c Emission guidelines for municipal solid waste landfill emissions.
60.34c Test methods and procedures.
60.35c Reporting and recordkeeping guidelines.
60.36c Compliance times.

 Subpart Cd_Emissions Guidelines and Compliance Times for Sulfuric Acid 
                            Production Units

60.30d Designated facilities.
60.31d Emissions guidelines.

[[Page 6]]

60.32d Compliance times.

    Subpart Ce_Emission Guidelines and Compliance Times for Hospital/
                  Medical/Infectious Waste Incinerators

60.30e Scope.
60.31e Definitions.
60.32e Designated facilities.
60.33e Emission guidelines.
60.34e Operator training and qualification guidelines.
60.35e Waste management guidelines.
60.36e Inspection guidelines.
60.37e Compliance, performance testing, and monitoring guidelines.
60.38e Reporting and recordkeeping guidelines.
60.39e Compliance times.

Table 1 to Subpart Ce--Emission Limits for Small, Medium, and Large 
          HMIWI
Table 2 to Subpart Ce--Emission Limits for Small HMIWI which meet the 
          criteria under Sec.  60.33e(b)

     Subpart D_Standards of Performance for Fossil-Fuel-Fired Steam 
  Generators for Which Construction is Commenced After August 17, 1971

60.40 Applicability and designation of affected facility.
60.41 Definitions.
60.42 Standard for particulate matter.
60.43 Standard for sulfur dioxide.
60.44 Standard for nitrogen oxides.
60.45 Emission and fuel monitoring.
60.46 Test methods and procedures.

     Subpart Da_Standards of Performance for Electric Utility Steam 
Generating Units for Which Construction is Commenced After September 18, 
                                  1978

60.40Da Applicability and designation of affected facility.
60.41Da Definitions.
60.42Da Standard for particulate matter.
60.43Da Standard for sulfur dioxide.
60.44Da Standard for nitrogen oxides.
60.45Da Standard for mercury.
60.46Da [Reserved]
60.47Da Commercial demonstration permit.
60.48Da Compliance provisions.
60.49Da Emission monitoring.
60.50Da Compliance determination procedures and methods.
60.51Da Reporting requirements.
60.52Da Recordkeeping requirements.

     Subpart Db_Standards of Performance for Industrial-Commercial-
                  Institutional Steam Generating Units

60.40b Applicability and delegation of authority.
60.41b Definitions.
60.42b Standard for sulfur dioxide.
60.43b Standard for particulate matter.
60.44b Standard for nitrogen oxides.
60.45b Compliance and performance test methods and procedures for sulfur 
          dioxide.
60.46b Compliance and performance test methods and procedures for 
          particulate matter and nitrogen oxides.
60.47b Emission monitoring for sulfur dioxide.
60.48b Emission monitoring for particulate matter and nitrogen oxides.
60.49b Reporting and recordkeeping requirements.

  Subpart Dc_Standards of Performance for Small Industrial-Commercial-
                  Institutional Steam Generating Units

60.40c Applicability and delegation of authority.
60.41c Definitions.
60.42c Standard for sulfur dioxide.
60.43c Standard for particulate matter.
60.44c Compliance and performance test methods and procedures for sulfur 
          dioxide.
60.45c Compliance and performance test methods and procedures for 
          particulate matter.
60.46c Emission monitoring for sulfur dioxide.
60.47c Emission monitoring for particulate matter.
60.48c Reporting and recordkeeping requirements.

           Subpart E_Standards of Performance for Incinerators

60.50 Applicability and designation of affected facility.
60.51 Definitions.
60.52 Standard for particulate matter.
60.53 Monitoring of operations.
60.54 Test methods and procedures.

 Subpart Ea_Standards of Performance for Municipal Waste Combustors for 
Which Construction is Commenced After December 20, 1989 and on or Before 
                           September 20, 1994

60.50a Applicability and delegation of authority.
60.51a Definitions.
60.52a Standard for municipal waste combustor metals.
60.53a Standard for municipal waste combustor organics.
60.54a Standard for municipal waste combustor acid gases.
60.55a Standard for nitrogen oxides.
60.56a Standard for municipal waste combustor operating practices.

[[Page 7]]

60.57a [Reserved]
60.58a Compliance and performance testing.
60.59a Reporting and recordkeeping requirements.

Subpart Eb_Standards of Performance for Large Municipal Waste Combustors 
  for Which Construction is Commenced After September 20, 1994 or for 
  Which Modification or Reconstruction is Commenced After June 19, 1996

60.50b Applicability and delegation of authority.
60.51b Definitions.
60.52b Standards for municipal waste combustor metals, acid gases, 
          organics, and nitrogen oxides.
60.53b Standards for municipal waste combustor operating practices.
60.54b Standards for municipal waste combustor operator training and 
          certification.
60.55b Standards for municipal waste combustor fugitive ash emissions.
60.56b Standards for air curtain incinerators.
60.57b Siting requirements.
60.58b Compliance and performance testing.
60.59b Reporting and recordkeeping requirements.

  Subpart Ec_Standards of Performance for Hospital/Medical/Infectious 
 Waste Incinerators for Which Construction is Commenced After June 20, 
                                  1996

60.50c Applicability and delegation of authority.
60.51c Definitions.
60.52c Emission limits.
60.53c Operator training and qualification requirements.
60.54c Siting requirements.
60.55c Waste management plan.
60.56c Compliance and performance testing.
60.57c Monitoring requirements.
60.58c Reporting and recordkeeping requirements.

Table 1 to Subpart Ec--Emission Limits for Small, Medium, and Large 
          HMIWI
Table 2 to Subpart Ec--Toxic Equivalency Factors
Table 3 to Subpart Ec--Operating Parameters To Be Monitored and Minimum 
          Measurement and Recording Frequencies

      Subpart F_Standards of Performance for Portland Cement Plants

60.60 Applicability and designation of affected facility.
60.61 Definitions.
60.62 Standard for particulate matter.
60.63 Monitoring of operations.
60.64 Test methods and procedures.
60.65 Recordkeeping and reporting requirements.
60.66 Delegation of authority.

        Subpart G_Standards of Performance for Nitric Acid Plants

60.70 Applicability and designation of affected facility.
60.71 Definitions.
60.72 Standard for nitrogen oxides.
60.73 Emission monitoring.
60.74 Test methods and procedures.

       Subpart H_Standards of Performance for Sulfuric Acid Plants

60.80 Applicability and designation of affected facility.
60.81 Definitions.
60.82 Standard for sulfur dioxide.
60.83 Standard for acid mist.
60.84 Emission monitoring.
60.85 Test methods and procedures.

    Subpart I_Standards of Performance for Hot Mix Asphalt Facilities

60.90 Applicability and designation of affected facility.
60.91 Definitions.
60.92 Standard for particulate matter.
60.93 Test methods and procedures.

       Subpart J_Standards of Performance for Petroleum Refineries

60.100 Applicability, designation of affected facility, and 
          reconstruction.
60.101 Definitions.
60.102 Standard for particulate matter.
60.103 Standard for carbon monoxide.
60.104 Standards for sulfur oxides.
60.105 Monitoring of emissions and operations.
60.106 Test methods and procedures.
60.107 Reporting and recordkeeping requirements.
60.108 Performance test and compliance provisions.
60.109 Delegation of authority.

  Subpart K_Standards of Performance for Storage Vessels for Petroleum 
    Liquids for Which Construction, Reconstruction, or Modification 
        Commenced After June 11, 1973, and Prior to May 19, 1978

60.110 Applicability and designation of affected facility.
60.111 Definitions.
60.112 Standard for volatile organic compounds (VOC).

[[Page 8]]

60.113 Monitoring of operations.

 Subpart Ka_Standards of Performance for Storage Vessels for Petroleum 
    Liquids for Which Construction, Reconstruction, or Modification 
        Commenced After May 18, 1978, and Prior to July 23, 1984

60.110a Applicability and designation of affected facility.
60.111a Definitions.
60.112a Standard for volatile organic compounds (VOC).
60.113a Testing and procedures.
60.114a Alternative means of emission limitation.
60.115a Monitoring of operations.

Subpart Kb_Standards of Performance for Volatile Organic Liquid Storage 
     Vessels (Including Petroleum Liquid Storage Vessels) for Which 
 Construction, Reconstruction, or Modification Commenced After July 23, 
                                  1984

60.110b Applicability and designation of affected facility.
60.111b Definitions.
60.112b Standard for volatile organic compounds (VOC).
60.113b Testing and procedures.
60.114b Alternative means of emission limitation.
60.115b Reporting and recordkeeping requirements.
60.116b Monitoring of operations.
60.117b Delegation of authority.

     Subpart L_Standards of Performance for Secondary Lead Smelters

60.120 Applicability and designation of affected facility.
60.121 Definitions.
60.122 Standard for particulate matter.
60.123 Test methods and procedures.

   Subpart M_Standards of Performance for Secondary Brass and Bronze 
                            Production Plants

60.130 Applicability and designation of affected facility.
60.131 Definitions.
60.132 Standard for particulate matter.
60.133 Test methods and procedures.

  Subpart N_Standards of Performance for Primary Emissions from Basic 
Oxygen Process Furnances for Which Construction is Commenced After June 
                                11, 1973

60.140 Applicability and designation of affected facility.
60.141 Definitions.
60.142 Standard for particulate matter.
60.143 Monitoring of operations.
60.144 Test methods and procedures.

 Subpart Na_Standards of Performance for Secondary Emissions from Basic 
    Oxygen Process Steelmaking Facilities for Which Construction is 
                    Commenced After January 20, 1983

60.140a Applicability and designation of affected facilities.
60.141a Definitions.
60.142a Standards for particulate matter.
60.143a Monitoring of operations.
60.144a Test methods and procedures.
60.145a Compliance provisions.

     Subpart O_Standards of Performance for Sewage Treatment Plants

60.150 Applicability and designation of affected facility.
60.151 Definitions.
60.152 Standard for particulate matter.
60.153 Monitoring of operations.
60.154 Test methods and procedures.
60.155 Reporting.
60.156 Delegation of authority.

     Subpart P_Standards of Performance for Primary Copper Smelters

60.160 Applicability and designation of affected facility.
60.161 Definitions.
60.162 Standard for particulate matter.
60.163 Standard for sulfur dioxide.
60.164 Standard for visible emissions.
60.165 Monitoring of operations.
60.166 Test methods and procedures.

      Subpart Q_Standards of Performance for Primary Zinc Smelters

60.170 Applicability and designation of affected facility.
60.171 Definitions.
60.172 Standard for particulate matter.
60.173 Standard for sulfur dioxide.
60.174 Standard for visible emissions.
60.175 Monitoring of operations.
60.176 Test methods and procedures.

      Subpart R_Standards of Performance for Primary Lead Smelters

60.180 Applicability and designation of affected facility.
60.181 Definitions.
60.182 Standard for particulate matter.
60.183 Standard for sulfur dioxide.
60.184 Standard for visible emissions.
60.185 Monitoring of operations.
60.186 Test methods and procedures.

[[Page 9]]

Subpart S_Standards of Performance for Primary Aluminum Reduction Plants

60.190 Applicability and designation of affected facility.
60.191 Definitions.
60.192 Standard for fluorides.
60.193 Standard for visible emissions.
60.194 Monitoring of operations.
60.195 Test methods and procedures.

    Subpart T_Standards of Performance for the Phosphate Fertilizer 
              Industry: Wet-Process Phosphoric Acid Plants

60.200 Applicability and designation of affected facility.
60.201 Definitions.
60.202 Standard for fluorides.
60.203 Monitoring of operations.
60.204 Test methods and procedures.

    Subpart U_Standards of Performance for the Phosphate Fertilizer 
                  Industry: Superphosphoric Acid Plants

60.210 Applicability and designation of affected facility.
60.211 Definitions.
60.212 Standard for fluorides.
60.213 Monitoring of operations.
60.214 Test methods and procedures.

    Subpart V_Standards of Performance for the Phosphate Fertilizer 
                  Industry: Diammonium Phosphate Plants

60.220 Applicability and designation of affected facility.
60.221 Definitions.
60.222 Standard for fluorides.
60.223 Monitoring of operations.
60.224 Test methods and procedures.

    Subpart W_Standards of Performance for the Phosphate Fertilizer 
                 Industry: Triple Superphosphate Plants

60.230 Applicability and designation of affected facility.
60.231 Definitions.
60.232 Standard for fluorides.
60.233 Monitoring of operations.
60.234 Test methods and procedures.

    Subpart X_Standards of Performance for the Phosphate Fertilizer 
       Industry: Granular Triple Superphosphate Storage Facilities

60.240 Applicability and designation of affected facility.
60.241 Definitions.
60.242 Standard for fluorides.
60.243 Monitoring of operations.
60.244 Test methods and procedures.

     Subpart Y_Standards of Performance for Coal Preparation Plants

60.250 Applicability and designation of affected facility.
60.251 Definitions.
60.252 Standards for particulate matter.
60.253 Monitoring of operations.
60.254 Test methods and procedures.

 Subpart Z_Standards of Performance for Ferroalloy Production Facilities

60.260 Applicability and designation of affected facility.
60.261 Definitions.
60.262 Standard for particulate matter.
60.263 Standard for carbon monoxide.
60.264 Emission monitoring.
60.265 Monitoring of operations.
60.266 Test methods and procedures.

   Subpart AA_Standards of Performance for Steel Plants: Electric Arc 
Furnaces Constructed After October 21, 1974 and On or Before August 17, 
                                  1983

60.270 Applicability and designation of affected facility.
60.271 Definitions.
60.272 Standard for particulate matter.
60.273 Emission monitoring.
60.274 Monitoring of operations.
60.275 Test methods and procedures.
60.276 Recordkeeping and reporting requirements.

  Subpart AAa_Standards of Performance for Steel Plants: Electric Arc 
  Furnaces and Argon-Oxygen Decarburization Vessels Constructed After 
                             August 7, 1983

60.270a Applicability and designation of affected facility.
60.271a Definitions.
60.272a Standard for particulate matter.
60.273a Emission monitoring.
60.274a Monitoring of operations.
60.275a Test methods and procedures.
60.276a Recordkeeping and reporting requirements.

        Subpart BB_Standards of Performance for Kraft Pulp Mills

60.280 Applicability and designation of affected facility.
60.281 Definitions.
60.282 Standard for particulate matter.
60.283 Standard for total reduced sulfur (TRS).
60.284 Monitoring of emissions and operations.
60.285 Test methods and procedures.

[[Page 10]]

   Subpart CC_Standards of Performance for Glass Manufacturing Plants

60.290 Applicability and designation of affected facility.
60.291 Definitions.
60.292 Standards for particulate matter.
60.293 Standards for particulate matter from glass melting furnace with 
          modified-processes.
60.294-60.295 [Reserved]
60.296 Test methods and procedures.

         Subpart DD_Standards of Performance for Grain Elevators

60.300 Applicability and designation of affected facility.
60.301 Definitions.
60.302 Standard for particulate matter.
60.303 Test methods and procedures.
60.304 Modifications.

    Subpart EE_Standards of Performance for Surface Coating of Metal 
                                Furniture

60.310 Applicability and designation of affected facility.
60.311 Definitions and symbols.
60.312 Standard for volatile organic compounds (VOC).
60.313 Performance tests and compliance provisions.
60.314 Monitoring of emissions and operations.
60.315 Reporting and recordkeeping requirements.
60.316 Test methods and procedures.

Subpart FF [Reserved]

     Subpart GG_Standards of Performance for Stationary Gas Turbines

60.330 Applicability and designation of affected facility.
60.331 Definitions.
60.332 Standard for nitrogen oxides.
60.333 Standard for sulfur dioxide.
60.334 Monitoring of operations.
60.335 Test methods and procedures.

    Subpart HH_Standards of Performance for Lime Manufacturing Plants

60.340 Applicability and designation of affected facility.
60.341 Definitions.
60.342 Standard for particulate matter.
60.343 Monitoring of emissions and operations.
60.344 Test methods and procedures.

Subpart KK_Standards of Performance for Lead-Acid Battery Manufacturing 
                                 Plants

60.370 Applicability and designation of affected facility.
60.371 Definitions.
60.372 Standards for lead.
60.373 Monitoring of emissions and operations.
60.374 Test methods and procedures.

  Subpart LL_Standards of Performance for Metallic Mineral Processing 
                                 Plants

60.380 Applicability and designation of affected facility.
60.381 Definitions.
60.382 Standard for particulate matter.
60.383 Reconstruction.
60.384 Monitoring of operations.
60.385 Recordkeeping and reporting requirements.
60.386 Test methods and procedures.

Subpart MM_Standards of Performance for Automobile and Light Duty Truck 
                       Surface Coating Operations

60.390 Applicability and designation of affected facility.
60.391 Definitions.
60.392 Standards for volatile organic compounds.
60.393 Performance test and compliance provisions.
60.394 Monitoring of emissions and operations.
60.395 Reporting and recordkeeping requirements.
60.396 Reference methods and procedures.
60.397 Modifications.
60.398 Innovative technology waivers.

      Subpart NN_Standards of Performance for Phosphate Rock Plants

60.400 Applicability and designation of affected facility.
60.401 Definitions.
60.402 Standard for particulate matter.
60.403 Monitoring of emissions and operations.
60.404 Test methods and procedures.

  Subpart PP_Standards of Performance for Ammonium Sulfate Manufacture

60.420 Applicability and designation of affected facility.
60.421 Definitions.
60.422 Standards for particulate matter.
60.423 Monitoring of operations.
60.424 Test methods and procedures.

   Subpart QQ_Standards of Performance for the Graphic Arts Industry: 
                    Publication Rotogravure Printing

60.430 Applicability and designation of affected facility.
60.431 Definitions and notations.

[[Page 11]]

60.432 Standard for volatile organic compounds.
60.433 Performance test and compliance provisions.
60.434 Monitoring of operations and recordkeeping.
60.435 Test methods and procedures.

  Subpart RR_Standards of Performance for Pressure Sensitive Tape and 
                    Label Surface Coating Operations

60.440 Applicability and designation of affected facility.
60.441 Definitions and symbols.
60.442 Standard for volatile organic compounds.
60.443 Compliance provisions.
60.444 Performance test procedures.
60.445 Monitoring of operations and recordkeeping.
60.446 Test methods and procedures.
60.447 Reporting requirements.

  Subpart SS_Standards of Performance for Industrial Surface Coating: 
                            Large Appliances

60.450 Applicability and designation of affected facility.
60.451 Definitions.
60.452 Standard for volatile organic compounds.
60.453 Performance test and compliance provisions.
60.454 Monitoring of emissions and operations.
60.455 Reporting and recordkeeping requirements.
60.456 Test methods and procedures.

   Subpart TT_Standards of Performance for Metal Coil Surface Coating

60.460 Applicability and designation of affected facility.
60.461 Definitions.
60.462 Standards for volatile organic compounds.
60.463 Performance test and compliance provisions.
60.464 Monitoring of emissions and operations.
60.465 Reporting and recordkeeping requirements.
60.466 Test methods and procedures.

 Subpart UU_Standards of Performance for Asphalt Processing and Asphalt 
                           Roofing Manufacture

60.470 Applicability and designation of affected facilities.
60.471 Definitions.
60.472 Standards for particulate matter.
60.473 Monitoring of operations.
60.474 Test methods and procedures.

 Subpart VV_Standards of Performance for Equipment Leaks of VOC in the 
           Synthetic Organic Chemicals Manufacturing Industry

60.480 Applicability and designation of affected facility.
60.481 Definitions.
60.482-1 Standards: General.
60.482-2 Standards: Pumps in light liquid service.
60.482-3 Standards: Compressors.
60.482-4 Standards: Pressure relief devices in gas/vapor service.
60.482-5 Standards: Sampling connection systems.
60.482-6 Standards: Open-ended valves or lines.
60.482-7 Standards: Valves in gas/vapor service and in light liquid 
          service.
60.482-8 Standards: Pumps and valves in heavy liquid service, pressure 
          relief devices in light liquid or heavy liquid service, and 
          connectors.
60.482-9 Standards: Delay of repair.
60.482-10 Standards: Closed vent systems and control devices.
60.483-1 Alternative standards for valves--allowable percentage of 
          valves leaking.
60.483-2 Alternative standards for valves--skip period leak detection 
          and repair.
60.484 Equivalence of means of emission limitation.
60.485 Test methods and procedures.
60.486 Recordkeeping requirements.
60.487 Reporting requirements.
60.488 Reconstruction.
60.489 List of chemicals produced by affected facilities.

Subpart WW_Standards of Performance for the Beverage Can Surface Coating 
                                Industry

60.490 Applicability and designation of affected facility.
60.491 Definitions.
60.492 Standards for volatile organic compounds.
60.493 Performance test and compliance provisions.
60.494 Monitoring of emissions and operations.
60.495 Reporting and recordkeeping requirements.
60.496 Test methods and procedures.

     Subpart XX_Standards of Performance for Bulk Gasoline Terminals

60.500 Applicability and designation of affected facility.
60.501 Definitions.

[[Page 12]]

60.502 Standards for Volatile Organic Compound (VOC) emissions from bulk 
          gasoline terminals.
60.503 Test methods and procedures.
60.504 [Reserved]
60.505 Reporting and recordkeeping.
60.506 Reconstruction.

  Subpart AAA_Standards of Performance for New Residential Wood Heaters

60.530 Applicability and designation of affected facility.
60.531 Definitions.
60.532 Standards for particulate matter.
60.533 Compliance and certification.
60.534 Test methods and procedures.
60.535 Laboratory accreditation.
60.536 Permanent label, temporary label, and owner's manual.
60.537 Reporting and recordkeeping.
60.538 Prohibitions.
60.539 Hearing and appeal procedures.
60.539a Delegation of authority.
60.539b General provisions exclusions.

 Subpart BBB_Standards of Performance for the Rubber Tire Manufacturing 
                                Industry

60.540 Applicability and designation of affected facilities.
60.541 Definitions.
60.542 Standards for volatile organic compounds.
60.542a Alternate standard for volatile organic compounds.
60.543 Performance test and compliance provisions.
60.544 Monitoring of operations.
60.545 Recordkeeping requirements.
60.546 Reporting requirements.
60.547 Test methods and procedures.
60.548 Delegation of authority.

Subpart CCC [Reserved]

Subpart DDD_Standards of Performance for Volatile Organic Compound (VOC) 
            Emissions from the Polymer Manufacturing Industry

60.560 Applicability and designation of affected facilities.
60.561 Definitions.
60.562-1 Standards: Process emissions.
60.562-2 Standards: Equipment leaks of VOC.
60.563 Monitoring requirements.
60.564 Test methods and procedures.
60.565 Reporting and recordkeeping requirements.
60.566 Delegation of authority.

Subpart EEE [Reserved]

  Subpart FFF_Standards of Performance for Flexible Vinyl and Urethane 
                          Coating and Printing

60.580 Applicability and designation of affected facility.
60.581 Definitions and symbols.
60.582 Standard for volatile organic compounds.
60.583 Test methods and procedures.
60.584 Monitoring of operations and recordkeeping requirements.
60.585 Reporting requirements.

   Subpart GGG_Standards of Performance for Equipment Leaks of VOC in 
                          Petroleum Refineries

60.590 Applicability and designation of affected facility.
60.591 Definitions.
60.592 Standards.
60.593 Exceptions.

  Subpart HHH_Standards of Performance for Synthetic Fiber Production 
                               Facilities

60.600 Applicability and designation of affected facility.
60.601 Definitions.
60.602 Standard for volatile organic compounds.
60.603 Performance test and compliance provisions.
60.604 Reporting requirements.

Subpart III_Standards of Performance for Volatile Organic Compound (VOC) 
  Emissions From the Synthetic Organic Chemical Manufacturing Industry 
                  (SOCMI) Air Oxidation Unit Processes

60.610 Applicability and designation of affected facility.
60.611 Definitions.
60.612 Standards.
60.613 Monitoring of emissions and operations.
60.614 Test methods and procedures.
60.615 Reporting and recordkeeping requirements.
60.616 Reconstruction.
60.617 Chemicals affected by subpart III.
60.618 Delegation of authority.

     Subpart JJJ_Standards of Performance for Petroleum Dry Cleaners

60.620 Applicability and designation of affected facility.
60.621 Definitions.
60.622 Standards for volatile organic compounds.
60.623 Equivalent equipment and procedures.

[[Page 13]]

60.624 Test methods and procedures.
60.625 Recordkeeping requirements.

  Subpart KKK_Standards of Performance for Equipment Leaks of VOC From 
                  Onshore Natural Gas Processing Plants

60.630 Applicability and designation of affected facility.
60.631 Definitions.
60.632 Standards.
60.633 Exceptions.
60.634 Alternative means of emission limitation.
60.635 Recordkeeping requirements.
60.636 Reporting requirements.

Subpart LLL_Standards of Performance for Onshore Natural Gas Processing: 
                        SO2 Emissions

60.640 Applicability and designation of affected facilities.
60.641 Definitions.
60.642 Standards for sulfur dioxide.
60.643 Compliance provisions.
60.644 Test methods and procedures.
60.645 [Reserved]
60.646 Monitoring of emissions and operations.
60.647 Recordkeeping and reporting requirements.
60.648 Optional procedure for measuring hydrogen sulfide in acid gas--
          Tutwiler Procedure.

Subpart MMM [Reserved]

Subpart NNN_Standards of Performance for Volatile Organic Compound (VOC) 
Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) 
                         Distillation Operations

60.660 Applicability and designation of affected facility.
60.661 Definitions.
60.662 Standards.
60.663 Monitoring of emissions and operations.
60.664 Test methods and procedures.
60.665 Reporting and recordkeeping requirements.
60.666 Reconstruction.
60.667 Chemicals affected by subpart NNN.
60.668 Delegation of authority.

Subpart OOO_Standards of Performance for Nonmetallic Mineral Processing 
                                 Plants

60.670 Applicability and designation of affected facility.
60.671 Definitions.
60.672 Standard for particulate matter.
60.673 Reconstruction.
60.674 Monitoring of operations.
60.675 Test methods and procedures.
60.676 Reporting and recordkeeping.

   Subpart PPP_Standard of Performance for Wool Fiberglass Insulation 
                          Manufacturing Plants

60.680 Applicability and designation of affected facility.
60.681 Definitions.
60.682 Standard for particulate matter.
60.683 Monitoring of operations.
60.684 Recordkeeping and reporting requirements.
60.685 Test methods and procedures.

 Subpart QQQ_Standards of Performance for VOC Emissions From Petroleum 
                       Refinery Wastewater Systems

60.690 Applicability and designation of affected facility.
60.691 Definitions.
60.692-1 Standards: General.
60.692-2 Standards: Individual drain systems.
60.692-3 Standards: Oil-water separators.
60.692-4 Standards: Aggregate facility.
60.692-5 Standards: Closed vent systems and control devices.
60.692-6 Standards: Delay of repair.
60.692-7 Standards: Delay of compliance.
60.693-1 Alternative standards for individual drain systems.
60.693-2 Alternative standards for oil-water separators.
60.694 Permission to use alternative means of emission limitation.
60.695 Monitoring of operations.
60.696 Performance test methods and procedures and compliance 
          provisions.
60.697 Recordkeeping requirements.
60.698 Reporting requirements.
60.699 Delegation of authority.

   Subpart RRR_Standards of Performance for Volatile Organic Compound 
Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) 
                            Reactor Processes

60.700 Applicability and designation of affected facility.
60.701 Definitions.
60.702 Standards.
60.703 Monitoring of emissions and operations.
60.704 Test methods and procedures.
60.705 Reporting and recordkeeping requirements.
60.706 Reconstruction.
60.707 Chemicals affected by subpart RRR.
60.708 Delegation of authority.

[[Page 14]]

     Subpart SSS_Standards of Performance for Magnetic Tape Coating 
                               Facilities

60.710 Applicability and designation of affected facility.
60.711 Definitions, symbols, and cross-reference tables.
60.712 Standards for volatile organic compounds.
60.713 Compliance provisions.
60.714 Installation of monitoring devices and recordkeeping.
60.715 Test methods and procedures.
60.716 Permission to use alternative means of emission limitation.
60.717 Reporting and monitoring requirements.
60.718 Delegation of authority.

  Subpart TTT_Standards of Performance for Industrial Surface Coating: 
         Surface Coating of Plastic Parts for Business Machines

60.720 Applicability and designation of affected facility.
60.721 Definitions.
60.722 Standards for volatile organic compounds.
60.723 Performance test and compliance provisions.
60.724 Reporting and recordkeeping requirements.
60.725 Test methods and procedures.
60.726 Delegation of authority.

Subpart UUU_Standards of Performance for Calciners and Dryers in Mineral 
                               Industries

60.730 Applicability and designation of affected facility.
60.731 Definitions.
60.732 Standards for particulate matter.
60.733 Reconstruction.
60.734 Monitoring of emissions and operations.
60.735 Recordkeeping and reporting requirements.
60.736 Test methods and procedures.
60.737 Delegation of authority.

Subpart VVV_Standards of Performance for Polymeric Coating of Supporting 
                          Substrates Facilities

60.740 Applicability and designation of affected facility.
60.741 Definitions, symbols, and cross-reference tables.
60.742 Standards for violatile organic compounds.
60.743 Compliance provisions.
60.744 Monitoring requirements.
60.745 Test methods and procedures.
60.746 Permission to use alternative means of emission limitation.
60.747 Reporting and recordkeeping requirements.
60.748 Delegation of authority.

Subpart WWW_Standards of Performance for Municipal Solid Waste Landfills

60.750 Applicability, designation of affected facility, and delegation 
          of authority.
60.751 Definitions.
60.752 Standards for air emissions from municipal solid waste landfills.
60.753 Operational standards for collection and control systems.
60.754 Test methods and procedures.
60.755 Compliance provisions.
60.756 Monitoring of operations.
60.757 Reporting requirements.
60.758 Recordkeeping requirements.
60.759 Specifications for active collection systems.

    Subpart AAAA_Standards of Performance for Small Municipal Waste 
 Combustion Units for Which Construction is Commenced After August 30, 
1999 or for Which Modification or Reconstruction is Commenced After June 
                                 6, 2001

                              Introduction

60.1000 What does this subpart do?
60.1005 When does this subpart become effective?

                              Applicability

60.1010 Does this subpart apply to my municipal waste combustion unit?
60.1015 What is a new municipal waste combustion unit?
60.1020 Does this subpart allow any exemptions?
60.1025 Do subpart E new source performance standards also apply to my 
          municipal waste combustion unit?
60.1030 Can the Administrator delegate authority to enforce these 
          Federal new source performance standards to a State agency?
60.1035 How are these new source performance standards structured?
60.1040 Do all five components of these new source performance standards 
          apply at the same time?
60.1045 Are there different subcategories of small municipal waste 
          combustion units within this subpart?

         Preconstruction Requirements: Materials Separation Plan

60.1050 Who must submit a materials separation plan?
60.1055 What is a materials separation plan?
60.1060 What steps must I complete for my materials separation plan?
60.1065 What must I include in my draft materials separation plan?

[[Page 15]]

60.1070 How do I make my draft materials separation plan available to 
          the public?
60.1075 When must I accept comments on the materials separation plan?
60.1080 Where and when must I hold a public meeting on my draft 
          materials separation plan?
60.1085 What must I do with any public comments I receive during the 
          public comment period on my draft materials separation plan?
60.1090 What must I do with my revised materials separation plan?
60.1095 What must I include in the public meeting on my revised 
          materials separation plan?
60.1100 What must I do with any public comments I receive on my revised 
          materials separation plan?
60.1105 How do I submit my final materials separation plan?

              Preconstruction Requirements: Siting Analysis

60.1110 Who must submit a siting analysis?
60.1115 What is a siting analysis?
60.1120 What steps must I complete for my siting analysis?
60.1125 What must I include in my siting analysis?
60.1130 How do I make my siting analysis available to the public?
60.1135 When must I accept comments on the siting analysis and revised 
          materials separation plan?
60.1140 Where and when must I hold a public meeting on the siting 
          analysis?
60.1145 What must I do with any public comments I receive during the 
          public comment period on my siting analysis?
60.1150 How do I submit my siting analysis?

              Good Combustion Practices: Operator Training

60.1155 What types of training must I do?
60.1160 Who must complete the operator training course? By when?
60.1165 Who must complete the plant-specific training course?
60.1170 What plant-specific training must I provide?
60.1175 What information must I include in the plant-specific operating 
          manual?
60.1180 Where must I keep the plant-specific operating manual?

            Good Combustion Practices: Operator Certification

60.1185 What types of operator certification must the chief facility 
          operator and shift supervisor obtain and by when must they 
          obtain it?
60.1190 After the required date for operator certification, who may 
          operate the municipal waste combustion unit?
60.1195 What if all the certified operators must be temporarily offsite?

            Good Combustion Practices: Operating Requirements

60.1200 What are the operating practice requirements for my municipal 
          waste combustion unit?
60.1205 What happens to the operating requirements during periods of 
          startup, shutdown, and malfunction?

                             Emission Limits

60.1210 What pollutants are regulated by this subpart?
60.1215 What emission limits must I meet? By when?
60.1220 What happens to the emission limits during periods of startup, 
          shutdown, and malfunction?

                     Continuous Emission Monitoring

60.1225 What types of continuous emission monitoring must I perform?
60.1230 What continuous emission monitoring systems must I install for 
          gaseous pollutants?
60.1235 How are the data from the continuous emission monitoring systems 
          used?
60.1240 How do I make sure my continuous emission monitoring systems are 
          operating correctly?
60.1245 Am I exempt from any appendix B or appendix F requirements to 
          evaluate continuous emission monitoring systems?
60.1250 What is my schedule for evaluating continuous emission 
          monitoring systems?
60.1255 What must I do if I choose to monitor carbon dioxide instead of 
          oxygen as a diluent gas?
60.1260 What is the minimum amount of monitoring data I must collect 
          with my continuous emission monitoring systems and is the data 
          collection requirement enforceable?
60.1265 How do I convert my 1-hour arithmetic averages into the 
          appropriate averaging times and units?
60.1270 What is required for my continuous opacity monitoring system and 
          how are the data used?
60.1275 What additional requirements must I meet for the operation of my 
          continuous emission monitoring systems and continuous opacity 
          monitoring system?
60.1280 What must I do if any of my continuous emission monitoring 
          systems are temporarily unavailable to meet the data 
          collection requirements?

                              Stack Testing

60.1285 What types of stack tests must I conduct?
60.1290 How are the stack test data used?

[[Page 16]]

60.1295 What schedule must I follow for the stack testing?
60.1300 What test methods must I use to stack test?
60.1305 May I conduct stack testing less often?
60.1310 May I deviate from the 13-month testing schedule if unforeseen 
          circumstances arise?

                      Other Monitoring Requirements

60.1315 Must I meet other requirements for continuous monitoring?
60.1320 How do I monitor the load of my municipal waste combustion unit?
60.1325 How do I monitor the temperature of flue gases at the inlet of 
          my particulate matter control device?
60.1330 How do I monitor the injection rate of activated carbon?
60.1335 What is the minimum amount of monitoring data I must collect 
          with my continuous parameter monitoring systems and is the 
          data collection requirement enforceable?

                              Recordkeeping

60.1340 What records must I keep?
60.1345 Where must I keep my records and for how long?
60.1350 What records must I keep for the materials separation plan and 
          siting analysis?
60.1355 What records must I keep for operator training and 
          certification?
60.1360 What records must I keep for stack tests?
60.1365 What records must I keep for continuously monitored pollutants 
          or parameters?
60.1370 What records must I keep for municipal waste combustion units 
          that use activated carbon?

                                Reporting

60.1375 What reports must I submit before I submit my notice of 
          construction?
60.1380 What must I include in my notice of construction?
60.1385 What reports must I submit after I submit my notice of 
          construction and in what form?
60.1390 What are the appropriate units of measurement for reporting my 
          data?
60.1395 When must I submit the initial report?
60.1400 What must I include in my initial report?
60.1405 When must I submit the annual report?
60.1410 What must I include in my annual report?
60.1415 What must I do if I am out of compliance with the requirements 
          of this subpart?
60.1420 If a semiannual report is required, when must I submit it?
60.1425 What must I include in the semiannual out-of-compliance reports?
60.1430 Can reporting dates be changed?

        Air Curtain Incinerators That Burn 100 Percent Yard Waste

60.1435 What is an air curtain incinerator?
60.1440 What is yard waste?
60.1445 What are the emission limits for air curtain incinerators that 
          burn 100 percent yard waste?
60.1450 How must I monitor opacity for air curtain incinerators that 
          burn 100 percent yard waste?
60.1455 What are the recordkeeping and reporting requirements for air 
          curtain incinerators that burn 100 percent yard waste?

                                Equations

60.1460 What equations must I use?

                               Definitions

60.1465 What definitions must I know?

Table 1 to Subpart AAAA of Part 60--Emission Limits For New Small 
          Municipal Waste Combustion Units
Table 2 to Subpart AAAA of Part 60--Carbon Monoxide Emission Limits For 
          New Small Municipal Waste Combustion Units
Table 3 to Subpart AAAA of Part 60--Requirements For Validating 
          Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart AAAA of Part 60--Requirements For Continuous Emission 
          Monitoring Systems (CEMS)
Table 5 to Subpart AAAA of Part 60--Requirements For Stack Tests

    Subpart BBBB_Emission Guidelines and Compliance Times for Small 
  Municipal Waste Combustion Units Constructed on or Before August 30, 
                                  1999

                              Introduction

60.1500 What is the purpose of this subpart?
60.1505 Am I affected by this subpart?
60.1510 Is a State plan required for all States?
60.1515 What must I include in my State plan?
60.1520 Is there an approval process for my State plan?
60.1525 What if my State plan is not approvable?
60.1530 Is there an approval process for a negative declaration letter?
60.1535 What compliance schedule must I include in my State plan?
60.1540 Are there any State plan requirements for this subpart that 
          supersede the requirements specified in subpart B?

[[Page 17]]

60.1545 Does this subpart directly affect municipal waste combustion 
          unit owners and operators in my State?

                      Applicability of State Plans

60.1550 What municipal waste combustion units must I address in my State 
          plan?
60.1555 Are any small municipal waste combustion units exempt from my 
          State plan?
60.1560 Can an affected municipal waste combustion unit reduce its 
          capacity to less than 35 tons per day rather than comply with 
          my State plan?
60.1565 What subcategories of small municipal waste combustion units 
          must I include in my State plan?

                            Use of Model Rule

60.1570 What is the ``model rule'' in this subpart?
60.1575 How does the model rule relate to the required elements of my 
          State plan?
60.1580 What are the principal components of the model rule?

                   Model Rule--Increments of Progress

60.1585 What are my requirements for meeting increments of progress and 
          achieving final compliance?
60.1590 When must I complete each increment of progress?
60.1595 What must I include in the notifications of achievement of my 
          increments of progress?
60.1600 When must I submit the notifications of achievement of 
          increments of progress?
60.1605 What if I do not meet an increment of progress?
60.1610 How do I comply with the increment of progress for submittal of 
          a control plan?
60.1615 How do I comply with the increment of progress for awarding 
          contracts?
60.1620 How do I comply with the increment of progress for initiating 
          onsite construction?
60.1625 How do I comply with the increment of progress for completing 
          onsite construction?
60.1630 How do I comply with the increment of progress for achieving 
          final compliance?
60.1635 What must I do if I close my municipal waste combustion unit and 
          then restart my municipal waste combustion unit?
60.1640 What must I do if I plan to permanently close my municipal waste 
          combustion unit and not restart it?

        Model Rule--Good Combustion Practices: Operator Training

60.1645 What types of training must I do?
60.1650 Who must complete the operator training course? By when?
60.1655 Who must complete the plant-specific training course?
60.1660 What plant-specific training must I provide?
60.1665 What information must I include in the plant-specific operating 
          manual?
60.1670 Where must I keep the plant-specific operating manual?

      Model Rule--Good Combustion Practices: Operator Certification

60.1675 What types of operator certification must the chief facility 
          operator and shift supervisor obtain and by when must they 
          obtain it?
60.1680 After the required date for operator certification, who may 
          operate the municipal waste combustion unit?
60.1685 What if all the certified operators must be temporarily offsite?

      Model Rule--Good Combustion Practices: Operating Requirements

60.1690 What are the operating practice requirements for my municipal 
          waste combustion unit?
60.1695 What happens to the operating requirements during periods of 
          startup, shutdown, and malfunction?

                       Model Rule--Emission Limits

60.1700 What pollutants are regulated by this subpart?
60.1705 What emission limits must I meet? By when?
60.1710 What happens to the emission limits during periods of startup, 
          shutdown, and malfunction?

               Model Rule--Continuous Emission Monitoring

60.1715 What types of continuous emission monitoring must I perform?
60.1720 What continuous emission monitoring systems must I install for 
          gaseous pollutants?
60.1725 How are the data from the continuous emission monitoring systems 
          used?
60.1730 How do I make sure my continuous emission monitoring systems are 
          operating correctly?
60.1735 Am I exempt from any appendix B or appendix F requirements to 
          evaluate continuous emission monitoring systems?
60.1740 What is my schedule for evaluating continuous emission 
          monitoring systems?
60.1745 What must I do if I choose to monitor carbon dioxide instead of 
          oxygen as a diluent gas?
60.1750 What is the minimum amount of monitoring data I must collect 
          with my continuous emission monitoring systems

[[Page 18]]

          and is the data collection requirement enforceable?
60.1755 How do I convert my 1-hour arithmetic averages into appropriate 
          averaging times and units?
60.1760 What is required for my continuous opacity monitoring system and 
          how are the data used?
60.1765 What additional requirements must I meet for the operation of my 
          continuous emission monitoring systems and continuous opacity 
          monitoring system?
60.1770 What must I do if any of my continuous emission monitoring 
          systems are temporarily unavailable to meet the data 
          collection requirements?

                        Model Rule--Stack Testing

60.1775 What types of stack tests must I conduct?
60.1780 How are the stack test data used?
60.1785 What schedule must I follow for the stack testing?
60.1790 What test methods must I use to stack test?
60.1795 May I conduct stack testing less often?
60.1800 May I deviate from the 13-month testing schedule if unforeseen 
          circumstances arise?

                Model Rule--Other Monitoring Requirements

60.1805 Must I meet other requirements for continuous monitoring?
60.1810 How do I monitor the load of my municipal waste combustion unit?
60.1815 How do I monitor the temperature of flue gases at the inlet of 
          my particulate matter control device?
60.1820 How do I monitor the injection rate of activated carbon?
60.1825 What is the minimum amount of monitoring data I must collect 
          with my continuous parameter monitoring systems and is the 
          data collection requirement enforceable?

                        Model Rule--Recordkeeping

60.1830 What records must I keep?
60.1835 Where must I keep my records and for how long?
60.1840 What records must I keep for operator training and 
          certification?
60.1845 What records must I keep for stack tests?
60.1850 What records must I keep for continuously monitored pollutants 
          or parameters?
60.1855 What records must I keep for municipal waste combustion units 
          that use activated carbon?

                          Model Rule--Reporting

60.1860 What reports must I submit and in what form?
60.1865 What are the appropriate units of measurement for reporting my 
          data?
60.1870 When must I submit the initial report?
60.1875 What must I include in my initial report?
60.1880 When must I submit the annual report?
60.1885 What must I include in my annual report?
60.1890 What must I do if I am out of compliance with the requirements 
          of this subpart?
60.1895 If a semiannual report is required, when must I submit it?
60.1900 What must I include in the semiannual out-of-compliance reports?
60.1905 Can reporting dates be changed?

  Model Rule--Air Curtain Incinerators That Burn 100 Percent Yard Waste

60.1910 What is an air curtain incinerator?
60.1915 What is yard waste?
60.1920 What are the emission limits for air curtain incinerators that 
          burn 100 percent yard waste?
60.1925 How must I monitor opacity for air curtain incinerators that 
          burn 100 percent yard waste?
60.1930 What are the recordkeeping and reporting requirements for air 
          curtain incinerators that burn 100 percent yard waste?

                                Equations

60.1935 What equations must I use?

                               Definitions

60.1940 What definitions must I know?

Table 1 to Subpart BBBB of Part 60--Model Rule--Compliance Schedules and 
          Increments of Progress
Table 2 to Subpart BBBB of Part 60--Model Rule--Class I Emission Limits 
          For Existing Small Municipal Waste Combustion Units
Table 3 to Subpart BBBB of Part 60--Model Rule--Class I Nitrogen Oxides 
          Emission Limits For Existing Small Municipal Waste Combustion 
          Units
Table 4 to Subpart BBBB of Part 60--Model Rule--Class II Emission Limits 
          For Existing Small Municipal Waste Combustion Units
Table 5 to Subpart BBBB of Part 60--Model Rule--Carbon Monoxide Emission 
          Limits For Existing Small Municipal Waste Combustion Units
Table 6 to Subpart BBBB of Part 60--Model Rule--Requirements for 
          Validating Continuous Emission Monitoring Systems (CEMS)
Table 7 to Subpart BBBB of Part 60--Model Rule--Requirements for 
          Continuous Emission Monitoring Systems (CEMS)

[[Page 19]]

Table 8 to Subpart BBBB of Part 60--Model Rule--Requirements for Stack 
          Tests

  Subpart CCCC_Standards of Performance for Commercial and Industrial 
Solid Waste Incineration Units for Which Construction Is Commenced After 
    November 30, 1999 or for Which Modification or Reconstruction Is 
                   Commenced on or After June 1, 2001

                              Introduction

60.2000 What does this subpart do?
60.2005 When does this subpart become effective?

                              Applicability

60.2010 Does this subpart apply to my incineration unit?
60.2015 What is a new incineration unit?
60.2020 What combustion units are exempt from this subpart?
60.2025 What if my chemical recovery unit is not listed in Sec.  
          60.2020(n)?
60.2030 Who implements and enforces this subpart?
60.2035 How are these new source performance standards structured?
60.2040 Do all eleven components of the new source performance standards 
          apply at the same time?

                     Preconstruction Siting Analysis

60.2045 Who must prepare a siting analysis?
60.2050 What is a siting analysis?

                          Waste Management Plan

60.2055 What is a waste management plan?
60.2060 When must I submit my waste management plan?
60.2065 What should I include in my waste management plan?

                   Operator Training and Qualification

60.2070 What are the operator training and qualification requirements?
60.2075 When must the operator training course be completed?
60.2080 How do I obtain my operator qualification?
60.2085 How do I maintain my operator qualification?
60.2090 How do I renew my lapsed operator qualification?
60.2095 What site-specific documentation is required?
60.2100 What if all the qualified operators are temporarily not 
          accessible?

                Emission Limitations and Operating Limits

60.2105 What emission limitations must I meet and by when?
60.2110 What operating limits must I meet and by when?
60.2115 What if I do not use a wet scrubber to comply with the emission 
          limitations?
60.2120 What happens during periods of startup, shutdown, and 
          malfunction?

                           Performance Testing

60.2125 How do I conduct the initial and annual performance test?
60.2130 How are the performance test data used?

                     Initial Compliance Requirements

60.2135 How do I demonstrate initial compliance with the emission 
          limitations and establish the operating limits?
60.2140 By what date must I conduct the initial performance test?

                   Continuous Compliance Requirements

60.2145 How do I demonstrate continuous compliance with the emission 
          limitations and the operating limits?
60.2150 By what date must I conduct the annual performance test?
60.2155 May I conduct performance testing less often?
60.2160 May I conduct a repeat performance test to establish new 
          operating limits?

                               Monitoring

60.2165 What monitoring equipment must I install and what parameters 
          must I monitor?
60.2170 Is there a minimum amount of monitoring data I must obtain?

                       Recordkeeping and Reporting

60.2175 What records must I keep?
60.2180 Where and in what format must I keep my records?
60.2185 What reports must I submit?
60.2190 What must I submit prior to commencing construction?
60.2195 What information must I submit prior to initial startup?
60.2200 What information must I submit following my initial performance 
          test?
60.2205 When must I submit my annual report?
60.2210 What information must I include in my annual report?
60.2215 What else must I report if I have a deviation from the operating 
          limits or the emission limitations?
60.2220 What must I include in the deviation report?
60.2225 What else must I report if I have a deviation from the 
          requirement to have a qualified operator accessible?
60.2230 Are there any other notifications or reports that I must submit?
60.2235 In what form can I submit my reports?
60.2240 Can reporting dates be changed?

[[Page 20]]

                        Title V Operating Permits

60.2242 Am I required to apply for and obtain a title V operating permit 
          for my unit?

                        Air Curtain Incinerators

60.2245 What is an air curtain incinerator?
60.2250 What are the emission limitations for air curtain incinerators?
60.2255 How must I monitor opacity for air curtain incinerators?
60.2260 What are the recordkeeping and reporting requirements for air 
          curtain incinerators?

                               Definitions

60.2265 What definitions must I know?

Table 1 to Subpart CCCC--Emission Limitations
Table 2 to Subpart CCCC--Operating Limits for Wet Scrubbers
Table 3 to Subpart CCCC--Toxic Equivalency Factors
Table 4 to Subpart CCCC--Summary of Reporting Requirements

 Subpart DDDD_Emissions Guidelines and Compliance Times for Commercial 
      and Industrial Solid Waste Incineration Units that Commenced 
               Construction On or Before November 30, 1999

                              Introduction

60.2500 What is the purpose of this subpart?
60.2505 Am I affected by this subpart?
60.2510 Is a State plan required for all States?
60.2515 What must I include in my State plan?
60.2520 Is there an approval process for my State plan?
60.2525 What if my State plan is not approvable?
60.2530 Is there an approval process for a negative declaration letter?
60.2535 What compliance schedule must I include in my State plan?
60.2540 Are there any State plan requirements for this subpart that 
          apply instead of the requirements specified in subpart B?
60.2545 Does this subpart directly affect CISWI unit owners and 
          operators in my State?

                      Applicability of State Plans

60.2550 What CISWI units must I address in my State plan?
60.2555 What combustion units are exempt from my State plan?
60.2558 What if a chemical recovery unit is not listed in Sec.  
          60.2555(n)?

                            Use of Model Rule

60.2560 What is the ``model rule'' in this subpart?
60.2565 How does the model rule relate to the required elements of my 
          State plan?
60.2570 What are the principal components of the model rule?

                   Model Rule--Increments of Progress

60.2575 What are my requirements for meeting increments of progress and 
          achieving final compliance?
60.2580 When must I complete each increment of progress?
60.2585 What must I include in the notifications of achievement of 
          increments of progress?
60.2590 When must I submit the notifications of achievement of 
          increments of progress?
60.2595 What if I do not meet an increment of progress?
60.2600 How do I comply with the increment of progress for submittal of 
          a control plan?
60.2605 How do I comply with the increment of progress for achieving 
          final compliance?
60.2610 What must I do if I close my CISWI unit and then restart it?
60.2615 What must I do if I plan to permanently close my CISWI unit and 
          not restart it?

                    Model Rule--Waste Management Plan

60.2620 What is a waste management plan?
60.2625 When must I submit my waste management plan?
60.2630 What should I include in my waste management plan?

             Model Rule--Operator Training and Qualification

60.2635 What are the operator training and qualification requirements?
60.2640 When must the operator training course be completed?
60.2645 How do I obtain my operator qualification?
60.2650 How do I maintain my operator qualification?
60.2655 How do I renew my lapsed operator qualification?
60.2660 What site-specific documentation is required?
60.2665 What if all the qualified operators are temporarily not 
          accessible?

          Model Rule--Emission Limitations and Operating Limits

60.2670 What emission limitations must I meet and by when?
60.2675 What operating limits must I meet and by when?
60.2680 What if I do not use a wet scrubber to comply with the emission 
          limitations?

[[Page 21]]

60.2685 What happens during periods of startup, shutdown, and 
          malfunction?

                     Model Rule--Performance Testing

60.2690 How do I conduct the initial and annual performance test?
60.2695 How are the performance test data used?

               Model Rule--Initial Compliance Requirements

60.2700 How do I demonstrate initial compliance with the emission 
          limitations and establish the operating limits?
60.2705 By what date must I conduct the initial performance test?

             Model Rule--Continuous Compliance Requirements

60.2710 How do I demonstrate continuous compliance with the emission 
          limitations and the operating limits?
60.2715 By what date must I conduct the annual performance test?
60.2720 May I conduct performance testing less often?
60.2725 May I conduct a repeat performance test to establish new 
          operating limits?

                         Model Rule--Monitoring

60.2730 What monitoring equipment must I install and what parameters 
          must I monitor?
60.2735 Is there a minimum amount of monitoring data I must obtain?

                 Model Rule--Recordkeeping and Reporting

60.2740 What records must I keep?
60.2745 Where and in what format must I keep my records?
60.2750 What reports must I submit?
60.2755 When must I submit my waste management plan?
60.2760 What information must I submit following my initial performance 
          test?
60.2765 When must I submit my annual report?
60.2770 What information must I include in my annual report?
60.2775 What else must I report if I have a deviation from the operating 
          limits or the emission limitations?
60.2780 What must I include in the deviation report?
60.2785 What else must I report if I have a deviation from the 
          requirement to have a qualified operator accessible?
60.2790 Are there any other notifications or reports that I must submit?
60.2795 In what form can I submit my reports?
60.2800 Can reporting dates be changed?

                  Model Rule--Title V Operating Permits

60.2805 Am I required to apply for and obtain a title V operating permit 
          for my unit?

                  Model Rule--Air Curtain Incinerators

60.2810 What is an air curtain incinerator?
60.2815 What are my requirements for meeting increments of progress and 
          achieving final compliance?
60.2820 When must I complete each increment of progress?
60.2825 What must I include in the notifications of achievement of 
          increments of progress?
60.2830 When must I submit the notifications of achievement of 
          increments of progress?
60.2835 What if I do not meet an increment of progress?
60.2840 How do I comply with the increment of progress for submittal of 
          a control plan?
60.2845 How do I comply with the increment of progress for achieving 
          final compliance?
60.2850 What must I do if I close my air curtain incinerator and then 
          restart it?
60.2855 What must I do if I plan to permanently close my air curtain 
          incinerator and not restart it?
60.2860 What are the emission limitations for air curtain incinerators?
60.2865 How must I monitor opacity for air curtain incinerators?
60.2870 What are the recordkeeping and reporting requirements for air 
          curtain incinerators?

                         Model Rule--Definitions

60.2875 What definitions must I know?

Table 1 to Subpart DDDD--Model Rule--Increments of Progress and 
          Compliance Schedules
Table 2 to Subpart DDDD--Model Rule--Emission Limitations
Table 3 to Subpart DDDD--Model Rule--Operating Limits for Wet Scrubbers
Table 4 to Subpart DDDD--Model Rule--Toxic Equivalency Factors
Table 5 to Subpart DDDD--Model Rule--Summary of Reporting Requirements

Subpart EEEE_Standards of Performance for Other Solid Waste Incineration 
Units for Which Construction is Commenced After December 9, 2004, or for 
 Which Modification or Reconstruction is Commenced on or After June 16, 
                                  2006

                              Introduction

60.2880 What does this subpart do?
60.2881 When does this subpart become effective?

[[Page 22]]

                              Applicability

60.2885 Does this subpart apply to my incineration unit?
60.2886 What is a new incineration unit?
60.2887 What combustion units are excluded from this subpart?
60.2888 Are air curtain incinerators regulated under this subpart?
60.2889 Who implements and enforces this subpart?
60.2890 How are these new source performance standards structured?
60.2891 Do all components of these new source performance standards 
          apply at the same time?

                     Preconstruction Siting Analysis

60.2894 Who must prepare a siting analysis?
60.2895 What is a siting analysis?

                          Waste Management Plan

60.2899 What is a waste management plan?
60.2900 When must I submit my waste management plan?
60.2901 What should I include in my waste management plan?

                   Operator Training and Qualification

60.2905 What are the operator training and qualification requirements?
60.2906 When must the operator training course be completed?
60.2907 How do I obtain my operator qualification?
60.2908 How do I maintain my operator qualification?
60.2909 How do I renew my lapsed operator qualification?
60.2910 What site-specific documentation is required?
60.2911 What if all the qualified operators are temporarily not 
          accessible?

                Emission Limitations and Operating Limits

60.2915 What emission limitations must I meet and by when?
60.2916 What operating limits must I meet and by when?
60.2917 What if I do not use a wet scrubber to comply with the emission 
          limitations?
60.2918 What happens during periods of startup, shutdown, and 
          malfunction?

                           Performance Testing

60.2922 How do I conduct the initial and annual performance test?
60.2923 How are the performance test data used?

                     Initial Compliance Requirements

60.2927 How do I demonstrate initial compliance with the emission 
          limitations and establish the operating limits?
60.2928 By what date must I conduct the initial performance test?

                   Continuous Compliance Requirements

60.2932 How do I demonstrate continuous compliance with the emission 
          limitations and the operating limits?
60.2933 By what date must I conduct the annual performance test?
60.2934 May I conduct performance testing less often?
60.2935 May I conduct a repeat performance test to establish new 
          operating limits?

                               Monitoring

60.2939 What continuous emission monitoring systems must I install?
60.2940 How do I make sure my continuous emission monitoring systems are 
          operating correctly?
60.2941 What is my schedule for evaluating continuous emission 
          monitoring systems?
60.2942 What is the minimum amount of monitoring data I must collect 
          with my continuous emission monitoring systems, and is the 
          data collection requirement enforceable?
60.2943 How do I convert my 1-hour arithmetic averages into the 
          appropriate averaging times and units?
60.2944 What operating parameter monitoring equipment must I install, 
          and what operating parameters must I monitor?
60.2945 Is there a minimum amount of operating parameter monitoring data 
          I must obtain?

                       Recordkeeping and Reporting

60.2949 What records must I keep?
60.2950 Where and in what format must I keep my records?
60.2951 What reports must I submit?
60.2952 What must I submit prior to commencing construction?
60.2953 What information must I submit prior to initial startup?
60.2954 What information must I submit following my initial performance 
          test?
60.2955 When must I submit my annual report?
60.2956 What information must I include in my annual report?
60.2957 What else must I report if I have a deviation from the operating 
          limits or the emission limitations?
60.2958 What must I include in the deviation report?
60.2959 What else must I report if I have a deviation from the 
          requirement to have a qualified operator accessible?
60.2960 Are there any other notifications or reports that I must submit?
60.2961 In what form can I submit my reports?
60.2962 Can reporting dates be changed?

[[Page 23]]

                        Title V Operating Permits

60.2966 Am I required to apply for and obtain a title V operating permit 
          for my unit?
60.2967 When must I submit a title V permit application for my new unit?

Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster 
                                Recovery

60.2969 What are the requirements for temporary-use incinerators and air 
          curtain incinerators used in disaster recovery?

 Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and 
                               Yard Waste

60.2970 What is an air curtain incinerator?
60.2971 What are the emission limitations for air curtain incinerators 
          that burn only wood waste, clean lumber, and yard waste?
60.2972 How must I monitor opacity for air curtain incinerators that 
          burn only wood waste, clean lumber, and yard waste?
60.2973 What are the recordkeeping and reporting requirements for air 
          curtain incinerators that burn only wood waste, clean lumber, 
          and yard waste?
60.2974 Am I required to apply for and obtain a title V operating permit 
          for my air curtain incinerator that burns only wood waste, 
          clean lumber, and yard waste?

                                Equations

60.2975 What equations must I use?

                               Definitions

60.2977 What definitions must I know?

                    Tables to Subpart EEEE of Part 60

Table 1 to Subpart EEEE of Part 60--Emission Limitations
Table 2 to Subpart EEEE of Part 60--Operating Limits for Incinerators 
          and Wet Scrubbers
Table 3 to Subpart EEEE of Part 60--Requirements for Continuous Emission 
          Monitoring Systems (CEMS)
Table 4 to Subpart EEEE of Part 60--Summary of Reporting Requirements

 Subpart FFFF_Emission Guidelines and Compliance Times for Other Solid 
   Waste Incineration Units That Commenced Construction On or Before 
                            December 9, 2004

                              Introduction

60.2980 What is the purpose of this subpart?
60.2981 Am I affected by this subpart?
60.2982 Is a State plan required for all States?
60.2983 What must I include in my State plan?
60.2984 Is there an approval process for my State plan?
60.2985 What if my State plan is not approvable?
60.2986 Is there an approval process for a negative declaration letter?
60.2987 What compliance schedule must I include in my State plan?
60.2988 Are there any State plan requirements for this subpart that 
          apply instead of the requirements specified in subpart B of 
          this part?
60.2989 Does this subpart directly affect incineration unit owners and 
          operators in my State?
60.2990 What Authorities are withheld by EPA?

                      Applicability of State Plans

60.2991 What incineration units must I address in my State plan?
60.2992 What is an existing incineration unit?
60.2993 Are any combustion units excluded from my State plan?
60.2994 Are air curtain incinerators regulated under this subpart?

                      Model Rule--Use of Model Rule

60.2996 What is the purpose of the ``model rule'' in this subpart?
60.2997 How does the model rule relate to the required elements of my 
          State plan?
60.2998 What are the principal components of the model rule?

                     Model Rule--Compliance Schedule

60.3000 When must I comply?
60.3001 What must I do if I close my OSWI unit and then restart it?
60.3002 What must I do if I plan to permanently close my OSWI unit and 
          not restart it?

                    Model Rule--Waste Management Plan

60.3010 What is a waste management plan?
60.3011 When must I submit my waste management plan?
60.3012 What should I include in my waste management plan?

             Model Rule--Operator Training and Qualification

60.3014 What are the operator training and qualification requirements?
60.3015 When must the operator training course be completed?
60.3016 How do I obtain my operator qualification?
60.3017 How do I maintain my operator qualification?
60.3018 How do I renew my lapsed operator qualification?

[[Page 24]]

60.3019 What site-specific documentation is required?
60.3020 What if all the qualified operators are temporarily not 
          accessible?

          Model Rule--Emission Limitations and Operating Limits

60.3022 What emission limitations must I meet and by when?
60.3023 What operating limits must I meet and by when?
60.3024 What if I do not use a wet scrubber to comply with the emission 
          limitations?
60.3025 What happens during periods of startup, shutdown, and 
          malfunction?

                     Model Rule--Performance Testing

60.3027 How do I conduct the initial and annual performance test?
60.3028 How are the performance test data used?

               Model Rule--Initial Compliance Requirements

60.3030 How do I demonstrate initial compliance with the emission 
          limitations and establish the operating limits?
60.3031 By what date must I conduct the initial performance test?

             Model Rule--Continuous Compliance Requirements

60.3033 How do I demonstrate continuous compliance with the emission 
          limitations and the operating limits?
60.3034 By what date must I conduct the annual performance test?
60.3035 May I conduct performance testing less often?
60.3036 May I conduct a repeat performance test to establish new 
          operating limits?

                         Model Rule--Monitoring

60.3038 What continuous emission monitoring systems must I install?
60.3039 How do I make sure my continuous emission monitoring systems are 
          operating correctly?
60.3040 What is my schedule for evaluating continuous emission 
          monitoring systems?
60.3041 What is the minimum amount of monitoring data I must collect 
          with my continuous emission monitoring systems, and is the 
          data collection requirement enforceable?
60.3042 How do I convert my 1-hour arithmetic averages into the 
          appropriate averaging times and units?
60.3043 What operating parameter monitoring equipment must I install, 
          and what operating parameters must I monitor?
60.3044 Is there a minimum amount of operating parameter monitoring data 
          I must obtain?

                 Model Rule--Recordkeeping and Reporting

60.3046 What records must I keep?
60.3047 Where and in what format must I keep my records?
60.3048 What reports must I submit?
60.3049 What information must I submit following my initial performance 
          test?
60.3050 When must I submit my annual report?
60.3051 What information must I include in my annual report?
60.3052 What else must I report if I have a deviation from the operating 
          limits or the emission limitations?
60.3053 What must I include in the deviation report?
60.3054 What else must I report if I have a deviation from the 
          requirement to have a qualified operator accessible?
60.3055 Are there any other notifications or reports that I must submit?
60.3056 In what form can I submit my reports?
60.3057 Can reporting dates be changed?

                  Model Rule--Title V Operating Permits

60.3059 Am I required to apply for and obtain a title V operating permit 
          for my unit?
60.3060 When must I submit a title V permit application for my existing 
          unit?

Model Rule--Temporary-Use Incinerators and Air Curtain Incinerators Used 
                          in Disaster Recovery

60.3061 What are the requirements for temporary-use incinerators and air 
          curtain incinerators used in disaster recovery?

 Model Rule--Air Curtain Incinerators That Burn Only Wood Waste, Clean 
                         Lumber, and Yard Waste

60.3062 What is an air curtain incinerator?
60.3063 When must I comply if my air curtain incinerator burns only wood 
          waste, clean lumber, and yard waste?
60.3064 What must I do if I close my air curtain incinerator that burns 
          only wood waste, clean lumber, and yard waste and then restart 
          it?
60.3065 What must I do if I plan to permanently close my air curtain 
          incinerator that burns only wood waste, clean lumber, and yard 
          waste and not restart it?
60.3066 What are the emission limitations for air curtain incinerators 
          that burn only wood waste, clean lumber, and yard waste?
60.3067 How must I monitor opacity for air curtain incinerators that 
          burn only wood waste, clean lumber, and yard waste?
60.3068 What are the recordkeeping and reporting requirements for air 
          curtain incinerators that burn only wood waste, clean lumber, 
          and yard waste?

[[Page 25]]

60.3069 Am I required to apply for and obtain a title V operating permit 
          for my air curtain incinerator that burns only wood waste, 
          clean lumber, and yard waste?

                          Model Rule--Equations

60.3076 What equations must I use?

                         Model Rule--Definitions

60.3078 What definitions must I know?

Tables to Subpart FFFF of Part 60
Table 1 to Subpart FFFF of Part 60--Model Rule--Compliance Schedule
Table 2 to Subpart FFFF of Part 60--Model Rule--Emission Limitations
Table 3 to Subpart FFFF of Part 60--Model Rule--Operating Limits for 
          Incinerators and Wet Scrubbers
Table 4 to Subpart FFFF of Part 60--Model Rule--Requirements for 
          Continuous Emission Monitoring Systems (CEMS)
Table 5 to Subpart FFFF of Part 60--Model Rule--Summary of Reporting 
          Requirements a

Subpart GGGG [Reserved]

  Subbart HHHH Emission Guidelines and Compliance Times for Coal-Fired 
                     Electric Steam Generating Units

              Hg Budget Trading Program General Provisions

60.4101 Purpose.
60.4102 Definitions.
60.4103 Measurements, abbreviations, and acronyms.
60.4104 Applicability.
60.4105 Retired unit exemption.
60.4106 Standard requirements.
60.4107 Computation of time.
60.4108 Appeal procedures.

           Hg Designated Representative for Hg Budget Sources

60.4110 Authorization and responsibilities of Hg designated 
          representative.
60.4111 Alternate Hg designated representative.
60.4112 Changing Hg designated representative and alternate Hg 
          designated representative; changes in owners and operators.
60.4113 Certificate of representation.
60.4114 Objections concerning Hg designated representative.

                                 Permits

60.4120 General Hg budget trading program permit requirements.
60.4121 Submission of Hg budget permit applications.
60.4122 Information requirements for Hg budget permit applications.
60.4123 Hg budget permit contents and term.
60.4124 Hg budget permit revisions.
60.4130 [Reserved]

                        Hg Allowance Allocations

60.4140 State trading budgets.
60.4141 Timing requirements for Hg allowance allocations.
60.4142 Hg allowance allocations.

                      Hg Allowance Tracking System

60.4150 [Reserved]
60.4151 Establishment of accounts.
60.4152 Responsibilities of Hg authorized account representative.
60.4153 Recordation of Hg allowance allocations.
60.4154 Compliance with Hg budget emissions limitation.
60.4155 Banking.
60.4156 Account error.
60.4157 Closing of general accounts.

                         Hg Allowance Transfers

60.4160 Submission of Hg allowance transfers.
60.4161 EPA recordation.
60.4162 Notification.

                        Monitoring and Reporting

60.4170 General requirements.
60.4171 Initial certification and recertification procedures.
60.4172 Out of control periods.
60.4173 Notifications.
60.4174 Recordkeeping and reporting.
60.4175 Petitions.
60.4176 Additional requirements to provide heat input data.

    Authority: 42 U.S.C. 7401 et seq.

    Source: 36 FR 24877, Dec. 23, 1971, unless otherwise noted.



    (a) Except as provided in subparts B and C, the provisions of this 
part apply to the owner or operator of any stationary source which 
contains an affected facility, the construction or modification of which 
is commenced after the date of publication in this part of any standard 
(or, if earlier, the date of publication of any proposed standard) 
applicable to that facility.
    (b) Any new or revised standard of performance promulgated pursuant 
to section 111(b) of the Act shall apply to the owner or operator of any 
stationary source which contains an affected facility, the construction 
or

[[Page 26]]

modification of which is commenced after the date of publication in this 
part of such new or revised standard (or, if earlier, the date of 
publication of any proposed standard) applicable to that facility.
    (c) In addition to complying with the provisions of this part, the 
owner or operator of an affected facility may be required to obtain an 
operating permit issued to stationary sources by an authorized State air 
pollution control agency or by the Administrator of the U.S. 
Environmental Protection Agency (EPA) pursuant to Title V of the Clean 
Air Act (Act) as amended November 15, 1990 (42 U.S.C. 7661). For more 
information about obtaining an operating permit see part 70 of this 
chapter.
    (d) Site-specific standard for Merck & Co., Inc.'s Stonewall Plant 
in Elkton, Virginia. (1) This paragraph applies only to the 
pharmaceutical manufacturing facility, commonly referred to as the 
Stonewall Plant, located at Route 340 South, in Elkton, Virginia 
(``site'').
    (2) Except for compliance with 40 CFR 60.49b(u), the site shall have 
the option of either complying directly with the requirements of this 
part, or reducing the site-wide emissions caps in accordance with the 
procedures set forth in a permit issued pursuant to 40 CFR 52.2454. If 
the site chooses the option of reducing the site-wide emissions caps in 
accordance with the procedures set forth in such permit, the 
requirements of such permit shall apply in lieu of the otherwise 
applicable requirements of this part.
    (3) Notwithstanding the provisions of paragraph (d)(2) of this 
section, for any provisions of this part except for Subpart Kb, the 
owner/operator of the site shall comply with the applicable provisions 
of this part if the Administrator determines that compliance with the 
provisions of this part is necessary for achieving the objectives of the 
regulation and the Administrator notifies the site in accordance with 
the provisions of the permit issued pursuant to 40 CFR 52.2454.

[40 FR 53346, Nov. 17, 1975, as amended at 55 FR 51382, Dec. 13, 1990; 
59 FR 12427, Mar. 16, 1994; 62 FR 52641, Oct. 8, 1997]