[Code of Federal Regulations]

[Title 40, Volume 12]

[Revised as of July 1, 2006]

From the U.S. Government Printing Office via GPO Access

[CITE: 40CFR63.1448]



[Page 33]

 

                   TITLE 40--PROTECTION OF ENVIRONMENT

 

         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)

 

PART 63_NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR 

SOURCE CATEGORIES--Table of Contents

 

Subpart QQQ_National Emission Standards for Hazardous Air Pollutants for 

                         Primary Copper Smelting

 

Sec.  63.1448  What are my general requirements for complying with this 

subpart?



    (a) You must be in compliance with the emission limitations, work 

practice standards, and operation and maintenance requirements in this 

subpart at all times, except during periods of startup, shutdown, and 

malfunction as defined in Sec.  63.2.

    (b) During the period between the compliance date specified for your 

affected source in Sec.  63.1443, and the date upon which continuous 

monitoring systems have been installed and certified and any applicable 

operating limits have been set, you must maintain a log detailing the 

operation and maintenance of the process and emissions control 

equipment.

    (c) You must develop a written startup, shutdown, and malfunction 

plan according to the provisions in Sec.  63.6(e)(3).



[57 FR 61992, Dec. 29, 1992, as amended at 71 FR 20461, Apr. 20, 2006]



                     Initial Compliance Requirements