[Code of Federal Regulations]
[Title 13, Volume 1]
[Revised as of January 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 13CFR400.206]

[Page 668-671]
 
                TITLE 13--BUSINESS CREDIT AND ASSISTANCE
 
            CHAPTER IV--EMERGENCY STEEL GUARANTEE LOAN BOARD
 
PART 400_EMERGENCY STEEL GUARANTEE LOAN PROGRAM--Table of Contents
 
                     Subpart C_Steel Guarantee Loans
 
Sec.  400.206  Environmental requirements.

    (a)(1) In general. Environmental assessments of the Board's actions 
will be conducted in accordance with applicable statutes, regulations, 
and Executive Orders. Therefore, each application for a Guarantee under 
the Program must be accompanied by information necessary for the Board 
to meet the requirements of applicable law.
    (2) Actions requiring compliance with NEPA. (i) The types of actions 
classified as ``major Federal actions'' subject to NEPA procedures are 
discussed generally in 40 CFR parts 1500 through 1508.
    (ii) With respect to this Program, these actions typically include:
    (A) Any project, permanent or temporary, that will involve 
construction and/or installations;
    (B) Any project, permanent or temporary, that will involve ground 
disturbing activities; and
    (C) Any project supporting renovation, other than interior 
remodeling.

[[Page 669]]

    (3) Environmental information required from the Lender. (i) 
Environmental data or documentation concerning the use of the proceeds 
of any loan guaranteed under this Program must be provided by the Lender 
to the Board to assist the Board in meeting its legal responsibilities. 
The Lender may obtain this information from the Borrower. (ii) Such 
information includes:
    (A) Documentation for an environmental threshold review from 
qualified data sources, such as a Federal, State or local agency with 
expertise and experience in environmental protection, or other sources, 
qualified to provide reliable environmental information;
    (B) Any previously prepared environmental reports or data relevant 
to the loan at issue;
    (C) Any environmental review prepared by Federal, State, or local 
agencies relevant to the loan at issue;
    (D) The information required for the completion of Form XYZ, 
``Environmental Assessment and Compliance Findings for Related 
Environmental Laws;'' and
    (E) Any other information that can be used by the Board to ensure 
compliance with environmental laws.
    (ii) All information supplied by the Lender is subject to 
verification by the Board.
    (b) The regulations of the Council on Environmental Quality 
implementing NEPA require the Board to provide public notice of the 
availability of project specific environmental documents such as 
environmental impact statements, environmental assessments, findings of 
no significant impact, records of decision etc., to the affected public. 
See 40 CFR 1506.6(b). Environmental information concerning specific 
projects can be obtained from the Board by contacting: Executive 
Director, Emergency Steel Guarantee Loan Board, U.S. Department of 
Commerce, Washington, DC 20230.
    (c) National Environmental Policy Act--(1) Purpose. The purpose of 
this paragraph (c) is to adopt procedures for compliance with the 
National Environmental Policy Act, 42 U.S.C. 4321 et seq., by the Board. 
This paragraph supplements regulations at 40 CFR Chapter V.
    (2) Definitions. For purposes of this section, the following 
definitions apply: Categorical exclusion means a category of actions 
which do not individually or cumulatively have a significant effect on 
the human environment and for which neither an environmental assessment 
nor an environmental impact statement is required.
    Environmental assessment means a document that briefly discusses the 
environmental consequences of a proposed action and alternatives 
prepared for the purposes set forth in 40 CFR 1508.9.
    EIS means an environmental impact statement prepared pursuant to 
section 102(2)(C) of NEPA.
    FONSI means a finding of no significant impact on the quality of the 
human environment after the completion of an environmental assessment.
    NEPA means the National Environmental Policy Act, 42 U.S.C. 4321, et 
seq.
    Working capital loan means money used by an ongoing business concern 
to fund its existing operations.
    (3) Delegations to Executive Director. (i) All incoming 
correspondence from Council on Environmental Quality (CEQ) and other 
agencies concerning matters related to NEPA, including draft and final 
EIS, shall be brought to the attention of the Executive Director. The 
Executive Director will prepare or, at his or her discretion, coordinate 
replies to such correspondence.
    (ii) With respect to actions of the Board, the Executive Director 
will:
    (A) Ensure preparation of all necessary environmental assessments 
and EISs;
    (B) Maintain a list of actions for which environmental assessments 
are being prepared;
    (C) Revise this list at regular intervals, and send the revisions to 
the Environmental Protection Agency;
    (D) Make the list available for public inspection;
    (E) Maintain a list of EISs; and
    (F) Maintain a file of draft and final EISs.
    (4) Categorical exclusions. (1) This paragraph describes various 
classes of Board actions that normally do not have a significant impact 
on the

[[Page 670]]

human environment and are categorically excluded. The word ``normally'' 
is stressed; there may be individual cases in which specific factors 
require contrary action.
    (ii) Subject to the limitations in paragraph (c)(4)(iii) of this 
section, the actions described in this paragraph have been determined 
not to have a significant impact on the quality of the human 
environment. They are categorically excluded from the need to prepare an 
environmental assessment or an EIS under NEPA.
    (A) Guarantees of working capital loans; and
    (B) Guarantees of loans for the refinancing of outstanding 
indebtedness of the Borrower, regardless of the purpose for which the 
original indebtedness was incurred.
    (iii) Actions listed in paragraph (c)(4)(ii) of this section that 
otherwise are categorically excluded from NEPA review are not 
necessarily excluded from review if they would be located within, or in 
other cases, potentially affect:
    (A) A floodplain;
    (B) A wetland;
    (C) Important farmlands, or prime forestlands or rangelands;
    (D) A listed species or critical habitat for an endangered species;
    (E) A property that is listed on or may be eligible for listing on 
the National Register of Historic Places;
    (F) An area within an approved State Coastal Zone Management 
Program;
    (G) A coastal barrier or a portion of a barrier within the Coastal 
Barrier Resources System;
    (H) A river or portion of a river included in, or designated for, 
potential addition to the Wild and Scenic Rivers System;
    (I) A sole source aquifer recharge area;
    (J) A State water quality standard (including designated and/or 
existing beneficial uses and anti-degradation requirements); or
    (K) The release or disposal of regulated substances above the levels 
set forth in a permit or license issued by an appropriate regulatory 
authority.
    (5) Responsibilities and procedures for preparation of an 
environmental assessment. (i) the Executive Director will request that 
the Lender and Borrower provide information concerning all potentially 
significant environmental impacts of the Borrower's proposed project 
pursuant to 13 CFR 400.206. The Executive Director, consulting at his 
discretion with CEQ, will review the information provided by the Lender 
and Borrower. Though no specific format for an environmental assessment 
is prescribed, it shall be a separate document, suitable for public 
review and should include the following in conformance with 40 CFR 
1508.9:
    (A) Description of the environment. The existing environmental 
conditions relevant to the Board's analysis determining the 
environmental impacts of the proposed project, should be described. The 
no action alternative also should be discussed;
    (B) Documentation. Citations to information used to describe the 
existing environment and to assess environmental impacts should be 
clearly referenced and documented. These sources should include, as 
appropriate, but not be limited to, local, tribal, regional, State, and 
Federal agencies, as well as, public and private organizations and 
institutions;
    (C) Evaluating environmental consequences of proposed actions. A 
brief discussion should be included of the need for the proposal, of 
alternatives as required by 42 U.S.C. 4332(2)(E) and their environmental 
impacts. The discussion of the environmental impacts should include 
measures to mitigate adverse impacts and any irreversible or 
irretrievable commitments of resources to the proposed project.
    (ii) The Executive Director, in preparing an environmental 
assessment, may:
    (A) Tier upon the information contained in a previous EIS, as 
described in 40 CFR 1502.20;
    (B) Incorporate by reference reasonably available material, as 
described in 40 CFR 1502.21; and/or
    (C) Adopt a previously completed EIS reasonably related to the 
project for which the proceeds of the loan sought to be guaranteed under 
the Program will be used, as described in 40 CFR 1506.3.
    (iii) Because of the statute's admonition to the Board to make its 
decisions

[[Page 671]]

as soon as possible after receiving applications, the Board will not:
    (A) Publish notice of intent to prepare an environmental assessment, 
as describe in 40 CFR 1501.7;
    (B) Conduct scoping, as described in 40 CFR 1501.7; and
    (C) Seek comments on the environmental assessment, as described in 
40 CFR 1503.1.
    (iv) If, on the basis of an environmental assessment, it is 
determined that an EIS is not required, a FONSI, as described in 40 CFR 
1508.13 will be prepared. The FONSI will include the environmental 
assessment or a summary of it and be available to the public from the 
Board. The Executive Director shall maintain a record of these 
decisions, making them available to interested parties upon request. 
Requests should be directed to the Executive Director, Emergency Steel 
Guarantee Loan Program, 1099--14th Street, NW, Suite 2600 East, 
Washington, DC 20005. Prior to a final loan guarantee decision, a copy 
of the NEPA documentation shall be sent to the Board for consideration.
    (6) Responsibilities and procedures for preparation of an 
environmental impact statement. (i) If after an environmental assessment 
has been completed, it is determined that an EIS is necessary, it and 
other related documentation will be prepared by the Executive Director 
in accordance with section 102(2)(c) of NEPA, this section, and 40 CFR 
parts 1500 through 1508. The Executive Director may seek additional 
information from the applicant in preparing the EIS. Once the document 
is prepared, it shall be submitted to the Board. If the Board considers 
a document unsatisfactory, it shall be returned to the Executive 
Director for revision or supplementation prior to a loan guarantee 
decision; otherwise the Board will transmit the document to the 
Environmental Protection Agency.
    (ii)(A) The following procedures, as discussed in 40 CFR parts 1500 
through 1508, will be followed in preparing an EIS:
    (1) The format and contents of the draft and final EIS shall be as 
discussed in 40 CFR 1502.
    (2) The requirements of 40 CFR 1506.9 for filing of documents with 
the Environmental Protection Agency shall be followed.
    (3) The Executive Director, consulting at his discretion with CEQ, 
shall examine carefully the basis on which supportive studies have been 
conducted to assure that such studies are objective and comprehensive in 
scope and in depth.
    (4) NEPA requires that the decision making ``utilize a systematic, 
interdisciplinary approach that will ensure the integrated use of the 
natural and social sciences and the environmental design arts.'' 42 
U.S.C. 4332(A). If such disciplines are not present on the Board staff, 
appropriate use should be made of personnel of Federal, State, and local 
agencies, universities, non-profit organizations, or private industry.
    (B) Until the Board issues a record of decision as provided in 40 
CFR 1502.2 no action concerning the proposal shall be taken which would:
    (1) Have an adverse environmental impact; or
    (2) Limit the choice of reasonable alternatives.
    (3) 40 CFR 1506.10 places certain limitations on the timing of Board 
decisions on taking ``major Federal actions.'' A loan guarantee shall 
not be made before the times set forth in 40 CFR 1506.10.
    (iii) A public record of decision stating what the decision was; 
identifying alternatives that were considered, including the 
environmentally preferable one(s); discussing any national 
considerations that entered into the decision; and summarizing a 
monitoring and enforcement program if applicable for mitigating the 
environmental effects of a proposal; will be prepared. This record of 
decision will be prepared at the time the decision is made.

[64 FR 57933, Oct. 27, 1999, as amended at 64 FR 72021, Dec. 23, 1999; 
65 FR 70294, Nov. 22, 2000]