                TITLE 33--NAVIGATION AND NAVIGABLE WATERS
 
 CHAPTER II--CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF 
                                 DEFENSE
 
PART 203_EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER 
 
            Subpart G_Local Interests/Cooperation Agreements
 
Sec.  203.85  Rehabilitation of Federal flood control projects.

    Some sponsors of Federal flood control projects are not required to 
furnish written assurances of local cooperation, when such assurances 
already exist from the PCA of the original construction of the project. 
In lieu of a new PCA, the Corps will notify the sponsor, in writing, of 
the sponsor's standing requirements. These requirements include such 
items as LERRD's, costs attributable to deficient or deferred 
maintenance, removal of temporary works, cost-sharing requirements, and 
any other requirements contained in Sec.  203.82. The project sponsor 
must acknowledge its responsibilities prior to the provision of 
Rehabilitation Assistance. If the existing PCA does not adequately 
address responsibilities, then a CA will be required.