Sec.  330.6  Authorization by nationwide permit.

    (a) Nationwide permit verification. (1) Nationwide permittees may, 
and in some cases must, request from a DE confirmation that an activity 
complies with the terms and conditions of an NWP. DEs should respond as 
promptly as practicable to such requests.
    (2) If the DE decides that an activity does not comply with the 
terms or conditions of an NWP, he will notify the person desiring to do 
the work and instruct him on the procedures to seek authorization under 
a regional general permit or individual permit.
    (3) If the DE decides that an activity does comply with the terms 
and conditions of an NWP, he will notify the nationwide permittee.
    (i) The DE may add conditions on a case-by-case basis to clarify 
compliance with the terms and conditions of an NWP or to ensure that the 
activity will have only minimal individual and cumulative adverse 
effects on the environment, and will not be contrary to the public 
interest.
    (ii) The DE's response will state that the verification is valid for 
a specific period of time (generally but no more than two years) unless 
the NWP authorization is modified, suspended, or

[[Page 482]]

revoked. The response should also include a statement that the 
verification will remain valid for the specified period of time, if 
during that time period, the NWP authorization is reissued without 
modification or the activity complies with any subsequent modification 
of the NWP authorization. Furthermore, the response should include a 
statement that the provisions of Sec.  330.6(b) will apply, if during 
that period of time, the NWP authorization expires, or is suspended or 
revoked, or is modified, such that the activity would no longer comply 
with the terms and conditions of an NWP. Finally, the response should 
include any known expiration date that would occur during the specified 
period of time. A period of time less than two years may be used if 
deemed appropriate.
    (iii) For activities where a state has denied 401 water quality 
certification and/or did not agree with the Corps consistency 
determination for an NWP the DE's response will state that the proposed 
activity meets the terms and conditions for authorization under the NWP 
with the exception of a state 401 water quality certification and/or CZM 
consistency concurrence. The response will also indicate the activity is 
denied without prejudice and cannot be authorized until the requirements 
of Sec. Sec.  330.4(c)(3), 330.4(c)(6), 330.4(d)(3), and 330.4(d)(6) are 
satisfied. The response will also indicate that work may only proceed 
subject to the terms and conditions of the state 401 water quality 
certification and/or CZM concurrence.
    (iv) Once the DE has provided such verification, he must use the 
procedures of 33 CFR 330.5 in order to modify, suspend, or revoke the 
authorization.
    (b) Expiration of nationwide permits. The Chief of Engineers will 
periodically review NWPs and their conditions and will decide to either 
modify, reissue, or revoke the permits. If an NWP is not modified or 
reissued within five years of its effective date, it automatically 
expires and becomes null and void. Activities which have commenced (i.e, 
are under construction) or are under contract to commence in reliance 
upon an NWP will remain authorized provided the activity is completed 
within twelve months of the date of an NWP's expiration, modification, 
or revocation, unless discretionary authority has been exercised on a 
case-by-case basis to modify, suspend, or revoke the authorization in 
accordance with 33 CFR 330.4(e) and 33 CFR 330.5 (c) or (d). Activities 
completed under the authorization of an NWP which was in effect at the 
time the activity was completed continue to be authorized by that NWP.
    (c) Multiple use of nationwide permits. Two or more different NWPs 
can be combined to authorize a ``single and complete project'' as 
defined at 33 CFR 330.2(i). However, the same NWP cannot be used more 
than once for a single and complete project.
    (d) Combining nationwide permits with individual permits. Subject to 
the following qualifications, portions of a larger project may proceed 
under the authority of the NWPs while the DE evaluates an individual 
permit application for other portions of the same project, but only if 
the portions of the project qualifying for NWP authorization would have 
independent utility and are able to function or meet their purpose 
independent of the total project. When the functioning or usefulness of 
a portion of the total project qualifying for an NWP is dependent on the 
remainder of the project, such that its construction and use would not 
be fully justified even if the Corps were to deny the individual permit, 
the NWP does not apply and all portions of the project must be evaluated 
as part of the individual permit process.
    (1) When a portion of a larger project is authorized to proceed 
under an NWP, it is with the understanding that its construction will in 
no way prejudice the decision on the individual permit for the rest of 
the project. Furthermore, the individual permit documentation must 
include an analysis of the impacts of the entire project, including 
related activities authorized by NWP.
    (2) NWPs do not apply, even if a portion of the project is not 
dependent on the rest of the project, when any portion of the project is 
subject to an enforcement action by the Corps or EPA.
    (e) After-the-fact authorizations. These authorizations often play 
an important part in the resolution of violations. In

[[Page 483]]

appropriate cases where the activity complies with the terms and 
conditions of an NWP, the DE can elect to use the NWP for resolution of 
an after-the-fact permit situation following a consideration of whether 
the violation being resolved was knowing or intentional and other 
indications of the need for a penalty. For example, where an 
unauthorized fill meets the terms and conditions of NWP 13, the DE can 
consider the appropriateness of allowing the residual fill to remain, in 
situations where said fill would normally have been permitted under NWP 
13. A knowing, intentional, willful violation should be the subject of 
an enforcement action leading to a penalty, rather than an after-the-
fact authorization. Use of after-the-fact NWP authorization must be 
consistent with the terms of the Army/EPA Memorandum of Agreement on 