[Code of Federal Regulations]
[Title 33, Volume 3]
[Revised as of July 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 33CFR385.39]

[Page 654-655]
 
                TITLE 33--NAVIGATION AND NAVIGABLE WATERS
 
 CHAPTER II--CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF 
                                 DEFENSE
 
PART 385_PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION 
 
     Subpart E_Ensuring Protection of the Natural System and Water 
     Availability Consistent With the Goals and Purpose of the Plan
 
Sec.  385.39  Evaluating progress towards other water-related needs of the 

region provided for in the Plan.

    (a) Purpose. (1) The overarching objective of the Plan is the 
restoration, preservation, and protection of the South Florida ecosystem 
while providing for other water-related needs of the region, including 
water supply and flood protection. Progress towards providing for these 
other water-related needs shall also be evaluated.
    (2) As provided for in paragraph (c) of this section, the Secretary 
of the Army and the Governor shall establish interim targets for 
evaluating progress towards other water-related needs of the region 
provided for in the Plan throughout the implementation process. The 
interim targets and interim goals shall be consistent with each other.
    (3) The Department of the Army shall include these interim targets 
in appropriate Corps of Engineers guidance.
    (4) To ensure flexibility in implementing the Plan over the next 
several decades, and to ensure that interim targets may reflect changed 
circumstances or new information resulting from adaptive management, the 
interim targets may be modified, consistent with the processes set forth 
in paragraph (c) of this section, to reflect new information resulting 
from changed or unforeseen circumstances, new scientific and technical 
information, new or updated modeling; information developed through the 
assessment principles contained in the Plan; and future authorized 
changes to the Plan integrated into the implementation of the Plan.
    (5) The Corps of Engineers and the South Florida Water Management 
District shall sequence and schedule projects as appropriate to achieve 
the interim goals and interim targets for other water-related needs of 
the region provided for in the Plan, to the extent practical given 
funding, technical, or other constraints.
    (6) If the interim targets have not been met or are unlikely to be 
met, then the Corps of Engineers and the South Florida Water Management 
District shall determine why the interim targets have not been met or 
are unlikely to be met and either:
    (i) Initiate adaptive management actions pursuant to Sec.  385.31(d) 
to achieve the interim targets as soon as practicable, consistent with 
the purposes of the Plan and consistent with the interim goals 
established pursuant to Sec.  385.38; or
    (ii) Recommend changes to the interim targets in accordance with 
paragraph (a)(4) of this section.
    (b) Principles for developing interim targets. (1) RECOVER, using 
best available science and information, shall recommend a set of interim 
targets for evaluating progress towards other water-related needs of the 
region provided for in the Plan. These interim targets shall reflect the 
incremental accomplishment of the expected performance level of the 
Plan, and will identify improvements in quantity, quality, timing and 
distribution of water in five-year increments that begin in 2005, with 
the targets reflecting the results expected to be achieved

[[Page 655]]

by 2010 and for each five-year increment thereafter. The interim targets 
shall be developed through the use of appropriate models and tools and 
shall provide a quantitative basis for evaluating progress towards other 
water-related needs of the region provided for in the Plan during the 
period of implementation. In developing the interim targets for the 
five-year increments, RECOVER shall use the Master Implementation 
Sequencing Plan as the basis for predicting the performance at a given 
time. RECOVER may recommend additional interim targets for 
implementation of CERP in addition to those initially developed and may 
propose revisions to the initial set of interim targets as new 
information is gained through adaptive management.
    (2) In developing its recommendations for interim targets, RECOVER 
shall consider indicators including, but not limited to:
    (i) The frequency of water restrictions in the Lower East Coast 
Service Areas at each time increment;
    (ii) The frequency of water restrictions in the Lake Okeechobee 
Service Areas at each time increment;
    (iii) The frequency of meeting salt-water intrusion protection 
criteria for the Lower East Coast Service Area at each time increment; 
and
    (iv) The frequency of water shortage restrictions on lands covered 
under the Water Rights Compact Among the Seminole Tribe of Florida, the 
State of Florida, and the South Florida Water Management District at 
each time increment.
    (c) Process for establishing interim targets. (1) The 
recommendations of RECOVER shall be provided to the Corps of Engineers 
and the South Florida Water Management District. These recommendations 
shall be provided no later than June 14, 2004. The proposed interim 
targets shall be developed by the Secretary of the Army and the 
Governor, in consultation with the Department of the Interior, the 
Environmental Protection Agency, the Department of Commerce, the 
Miccosukee Tribe of Indians of Florida, the Seminole Tribe of Florida, 
the Florida Department of Environmental Protection, and other Federal, 
State, and local agencies, and the South Florida Ecosystem Restoration 
Task Force. In considering the interim targets, the Secretary of the 
Army and the Governor, shall be provided with, and consider, the 
technical recommendations of RECOVER and any modifications to those 
recommendations by the Corps of Engineers or the South Florida Water 
Management District. The Secretary of the Army shall provide a notice of 
availability of the proposed interim targets to the public in the 
Federal Register and seek public comments. After considering comments of 
the public on the proposed interim targets, and incorporating any 
suggestions that are appropriate and consistent with the goals and 
purposes of the Plan, the Secretary of the Army and the Governor, shall 
establish the final interim targets, and the Secretary of the Army shall 
provide a notice of availability to the public in the Federal Register 
by no later than December 13, 2004, but not prior to the execution of 
the Interim Goals Agreement pursuant to Sec.  385.38. Interim targets 
are intended to facilitate inter-agency planning, monitoring, and 
assessment throughout the implementation process and are not standards 
or schedules enforceable in court.
    (2) In developing its recommendations for interim targets, RECOVER 
shall use the principles in paragraph (b) of this section.
    (3) The Secretary of the Army and the Governor shall review the 
interim targets at a minimum every five years beginning five years after 
the establishment of the interim targets to determine if they should be 
revised and to determine what those revisions should be. The public 
shall also be provided with an opportunity to comment on the proposed 
revisions. The Secretary of the Army and the Governor may also revise 
the interim targets whenever appropriate as new information becomes 
available. Any revisions to the interim targets shall be established 
consistent with the process described in this section.