Sec.  228.107  Review of surface use plan of operations.

    (a) Review. The authorized Forest officer shall review a surface use 
plan of operations as promptly as practicable given the nature and scope 
of the proposed plan. As part of the review, the authorized Forest 
officer shall comply with the National Environmental Policy Act of 1969, 
implementing regulations at 40 CFR parts 1500-1508, and the Forest 
Service implementing policies and procedures set forth in Forest Service 
Manual Chapter 1950 and Forest Service Handbook 1909.15 and shall ensure 
that:
    (1) The surface use plan of operations is consistent with the lease, 
including the lease stipulations, and applicable Federal laws;
    (2) To the extent consistent with the rights conveyed by the lease, 
the surface use plan of operations is consistent with, or is modified to 
be consistent with, the applicable current approved forest land and 
resource management plan;
    (3) The surface use plan of operations meets or exceeds the surface 
use requirements of Sec.  228.108 of this subpart; and
    (4) The surface use plan of operations is acceptable, or is modified 
to be acceptable, to the authorized Forest officer based upon a review 
of the environmental consequences of the operations.
    (b) Decision. The authorized Forest officer shall make a decision on 
the approval of a surface use plan of operations as follows:
    (1) If the authorized Forest officer will not be able to make a 
decision on the proposed plan within 3 working days after the conclusion 
of the 30-day notice period provided for by 30 U.S.C. 226(f), the 
authorized Forest officer shall advise the appropriate Bureau of Land 
Management office and the operator as soon as such delay becomes 
apparent, either in writing or orally with subsequent written 
confirmation, that additional time will be needed to process the plan. 
The authorized Forest officer shall explain the reason why additional 
time is needed and project the date by which a decision on the plan will 
likely be made.
    (2) When the review of a surface use plan of operations has been 
completed, the authorized Forest officer shall promptly notify the 
operator and the appropriate Bureau of Land Management office, in 
writing, that:
    (i) The plan is approved as submitted:
    (ii) The plan is approved subject to specified conditions; or,
    (iii) The plan is disapproved for the reasons stated.
    (c) Public notice. The authorized Forest Service officer will give 
public notice of the decision regarding a surface use plan of operations 
and include in that notice whether the decision is appealable under the 
applicable Forest Service appeal procedures.
    (d) Transmittal of decision. The authorized Forest officer shall 
immediately forward a decision on a surface use plan of operations to 
the appropriate Bureau of Land Management office and the operator. This 
transmittal shall include the estimated cost of reclamation and 
restoration (Sec.  228.109(a)) if the authorized Forest officer believes 
that additional bonding is required.
    (e) Supplemental plans. A supplemental surface use plan of 
operations (Sec.  228.106(d)) shall be reviewed in the same manner as an 
initial surface use plan of operations.

[55 FR 10444, Mar. 21, 1990, as amended at 72 FR 10328, Mar. 7, 2007]