                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 125_CRITERIA AND STANDARDS FOR THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM--Table of Contents
 
 Subpart G_Criteria for Modifying the Secondary Treatment Requirements 
               Under Section 301(h) of the Clean Water Act
 
Sec.  125.63  Establishment of a monitoring program.

    (a) General requirements. (1) The applicant must:
    (i) Have a monitoring program that is:
    (A) Designed to provide data to evaluate the impact of the modified 
discharge on the marine biota, demonstrate compliance with applicable 
water quality standards or water quality criteria, as applicable, and 
measure toxic substances in the discharge, and
    (B) Limited to include only those scientific investigations 
necessary to study the effects of the proposed discharge;
    (ii) Describe the sampling techniques, schedules and locations 
(including appropriate control sites), analytical techniques, quality 
control and verification procedures to be used in the monitoring 
program;
    (iii) Demonstrate that it has the resources necessary to implement 
the program upon issuance of the modified permit and to carry it out for 
the life of the modified permit; and
    (iv) Determine the frequency and extent of the monitoring program 
taking into consideration the applicant's rate of discharge, quantities 
of toxic pollutants discharged, and potentially significant impacts on 
receiving water

[[Page 324]]

quality, marine biota, and designated water uses.
    (2) The Administrator may require revision of the proposed 
monitoring program before issuing a modified permit and during the term 
of any modified permit.
    (b) Biological monitoring program. The biological monitoring program 
for both small and large applicants shall provide data adequate to 
evaluate the impact of the modified discharge on the marine biota.
    (1) Biological monitoring shall include to the extent practicable:
    (i) Periodic surveys of the biological communities and populations 
which are most likely affected by the discharge to enable comparisons 
with baseline conditions described in the application and verified by 
sampling at the control stations/reference sites during the periodic 
surveys;
    (ii) Periodic determinations of the accumulation of toxic pollutants 
and pesticides in organisms and examination of adverse effects, such as 
disease, growth abnormalities, physiological stress, or death;
    (iii) Sampling of sediments in areas of solids deposition in the 
vicinity of the ZID, in other areas of expected impact, and at 
appropriate reference sites to support the water quality and biological 
surveys and to measure the accumulation of toxic pollutants and 
pesticides; and
    (iv) Where the discharge would affect commercial or recreational 
fisheries, periodic assessments of the conditions and productivity of 
fisheries.
    (2) Small applicants are not subject to the requirements of 
paragraph (b)(1) (ii) through (iv) of this section if they discharge at 
depths greater than 10 meters and can demonstrate through a suspended 
solids deposition analysis that there will be negligible seabed 
accumulation in the vicinity of the modified discharge.
    (3) For applicants seeking a section 301(h) modified permit based 
on:
    (i) A current discharge, biological monitoring shall be designed to 
demonstrate ongoing compliance with the requirements of Sec.  125.62(c);
    (ii) An improved discharge or altered discharge other than outfall 
relocation, biological monitoring shall provide baseline data on the 
current impact of the discharge and data which demonstrate, upon 
completion of improvements or alterations, that the requirements of 
Sec.  125.62(c) are met; or
    (iii) An improved or altered discharge involving outfall relocation, 
the biological monitoring shall:
    (A) Include the current discharge site until such discharge ceases; 
and
    (B) Provide baseline data at the relocation site to demonstrate the 
impact of the discharge and to provide the basis for demonstrating that 
requirements of Sec.  125.62(c) will be met.
    (c) Water quality monitoring program. The water quality monitoring 
program shall to the extent practicable:
    (1) Provide adequate data for evaluating compliance with water 
quality standards or water quality criteria, as applicable under Sec.  
125.62(a)(1);
    (2) Measure the presence of toxic pollutants which have been 
identified or reasonably may be expected to be present in the discharge.
    (d) Effluent monitoring program. (1) In addition to the requirements 
of 40 CFR part 122, to the extent practicable, monitoring of the POTW 
effluent shall provide quantitative and qualitative data which measure 
toxic substances and pesticides in the effluent and the effectiveness of 
the toxic control program.
    (2) The permit shall require the collection of data on a frequency 
specified in the permit to provide adequate data for evaluating 
compliance with the percent removal efficiency requirements under Sec.  
125.60.