[Code of Federal Regulations] [Title 40, Volume 15] [Revised as of January 1, 2007] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR68.77] [Page 173] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PART 68_CHEMICAL ACCIDENT PREVENTION PROVISIONS--Table of Contents Subpart D_Program 3 Prevention Program Sec. 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified stationary sources when the modification is significant enough to require a change in the process safety information. (b) The pre-startup safety review shall confirm that prior to the introduction of regulated substances to a process: (1) Construction and equipment is in accordance with design specifications; (2) Safety, operating, maintenance, and emergency procedures are in place and are adequate; (3) For new stationary sources, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified stationary sources meet the requirements contained in management of change, Sec. 68.75. (4) Training of each employee involved in operating a process has been completed.