[Code of Federal Regulations] [Title 44, Volume 1] [Revised as of October 1, 2007] From the U.S. Government Printing Office via GPO Access [CITE: 44CFR70.4] [Page 349-350] TITLE 44--EMERGENCY MANAGEMENT AND ASSISTANCE CHAPTER I--FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PART 70_PROCEDURE FOR MAP CORRECTION--Table of Contents Sec. 70.4 Review by the Director. The Director, after reviewing the scientific or technical information submitted under the provisions of Sec. 70.3, shall notify the applicant in writing of his/her determination within 60 days after we receive the applicant's scientific or technical information that we have compared either the ground elevations of an entire legally defined parcel of land or the elevation of the lowest adjacent grade to a structure with the elevation of the base flood and that: (a) The property is within a designated A, A0, A1-30, AE, AH, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A, V0, V1-30, VE, or V Zone, and will state the basis of such determination; or (b) The property should not be within a designated A, A0, A1-30, AE, AH, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A,V0, V1-30, VE, or V Zone and that [[Page 350]] we will modify the FHBM or FIRM accordingly; or (c) The property is not within a designated A, A0, A1-30, AE, AH, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH, AR/A,V0, V1-30, VE, or V Zone as shown on the FHBM or FIRM and no modification of the FHBM or FIRM is necessary; or (d) We need an additional 60 days to make a determination. [66 FR 33900, June 26, 2001]