Sec. 31.10-5  Inspection of new tank vessels--TB/ALL.

    (a) Plans. Triplicate copies of contract plans and specifications 
shall be forwarded to the Officer in Charge, Marine Inspection, in whose 
district the construction will take place, for submission to the Marine 
Safety Center, 1900 Half Street, SW., Suite 1000, Room 525, Washington, 
DC 20024, for approval, but if the tank vessel is to be classed, such 
plans and specifications shall first be approved by a recognized 
classification society. If the plans and specifications are found to be 
in substantial agreement with the regulations in this chapter, they 
shall be approved, properly stamped and dated and distributed as 
follows: One set to owner or builder;

[[Page 408]]

one set to Officer in Charge, Marine Inspection, of the district in 
which the vessel is to be built; and one set shall be retained at the 
Marine Safety Center. If such plans and specifications are not approved, 
the Marine Safety Center shall notify the owner or builder promptly 
wherein they fail to comply with the regulations in this chapter. For 
list of electrical plans see subchapter J (Electrical Engineering) of 
this chapter.
    (1) The plans and specifications shall include the arrangement of 
the cargo gear. Plans and specifications for cargo gear shall be 
approved by either a recognized classification society or the 
International Cargo Gear Bureau, Inc., whose home office is located at 
321 West 44th Street, New York, NY 10036, prior to submission to the 
Officer in Charge, Marine Inspection.
    (2) For vessels of 100 meters (328 feet) or more in length 
contracted for on or after September 7, 1990, a plan must be included 
which shows how visibility from the navigation bridge will meet the 
standards contained in Sec. 32.16-1 of this subchapter.
    (b) Inspection. During construction, and upon completion of each 
tank vessel, it shall be inspected by the Officer in Charge, Marine 
Inspection, to determine whether it has been built in accordance with 
the approved plans and specifications, and, if so, a certificate of 
inspection endorsed as a permit for the carriage of flammable or 
combustible liquids in bulk for the proper grade or grades of cargo 
shall be issued to the vessel or its owner.
    (c) Certificate of class may be accepted. In the event such tank 
vessel is classed by the American Bureau of Shipping or other recognized 
classification society, the approved plans and certificates of such 
society may be accepted by the Coast Guard as evidence of the structural 
efficiency of the hull and reliability of machinery, except as otherwise 
provided for by law and the rules and regulations in this subchapter.

[CGFR 65-50, 30 FR 16662, Dec. 30, 1965, as amended by CGD 74-125A, 47 
FR 15230, Apr. 8, 1982; CGD 85-099, 55 FR 32247, Aug. 8, 1990; CGD 95-
028, 62 FR 51197, Sept. 30, 1997; USCG-2000-7790, 65 FR 58459, Sept. 29, 
2000; USCG-2007-29018, 72 FR 53964, Sept. 21, 2007]