[Code of Federal Regulations]
[Title 48, Volume 6]
[Revised as of October 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 48CFR1509.170-4]

[Page 15]
 
            TITLE 48--FEDERAL ACQUISITION REGULATIONS SYSTEM
 
               CHAPTER 15--ENVIRONMENTAL PROTECTION AGENCY
 
Sec. 1509.170-4  Definitions.

    (a) Contractor Performance Report is an evaluation of a contractor's 
performance for a specified period of time.
    (b) Interim Report refers to a Contractor Performance Report that 
covers each 12 month period after the effective date of contract.
    (c) Final Report refers to a Contractor Performance Report that 
covers the last 12 months (or less) of contract performance.
    (d) Ratings refer to the numerical scores for each performance 
category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 
2 = fair, 3 = good, 4 = excellent, and 5 = outstanding.
    (e) Summary ratings refer to the ratings determined by one level 
above the contracting officer regarding disagreements between the 
contractor and the contracting officer. Summary ratings reflect the 
Agency's ultimate conclusion for the performance period being evaluated.
    (f) Performance Categories refer to the measures used to evaluate a 
contractor's performance. Performance categories include quality, cost 
control, timeliness of performance, business relations, compliance with 
labor standards, compliance with safety standards, and meeting Small 
Disadvantaged Business subcontracting requirements.

[64 FR 20203, Apr. 26, 1999, as amended at 64 FR 41043, July 29, 1999; 
67 FR 66344, Oct. 31, 2002]