PART 230_STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS--Table of 
 
                            Subpart A_General
 
Sec.  230.17  One thousand four hundred seventy-two (1472) service day 

inspection.

    (a) General. Before any steam locomotive is initially put in service 
or brought out of retirement, and after every 1472 service days or 15 
years, whichever is earlier, an individual competent to conduct the 
inspection shall inspect the entire boiler. In the case of a new 
locomotive or a locomotive being brought out of retirement, the initial 
15 year period shall begin on the day that the locomotive is placed in 
service or 365 calendar days after the first flue tube is installed in 
the locomotive, whichever comes first. This 1472 service day inspection 
shall include all annual, and 5th annual, inspection requirements, as 
well as any items required by the steam locomotive owner and/or operator 
or the FRA inspector. At this time, the locomotive owner and/or operator 
shall complete, update and verify the locomotive specification card (FRA 
Form No. 4), to reflect the condition of the boiler at the time of this 
inspection. See appendices A and B of this part.
    (b) Filing inspection reports. Within 30 days of completing the 1472 
service day inspection, the steam locomotive owner and/or operator 
shall, for each steam locomotive inspected, file in the place where the 
steam locomotive is maintained and with the FRA Regional Administrator 
for that region a report of inspection (FRA Form No. 3), and a completed 
FRA Form No.4. See appendix C of this part.

                       Recordkeeping Requirements